School of Business New Building
The new School of Business building complex will be a flagship facility, serving as the permanent home for the School. The building will complement the School of Business’ existing space program and fully address enrollment-driven needs in pursuit of their aspiration to become the premier center of management research and education in the Inland Empire.
Project Scope:
The proposed building will provide about 38,500 ASF within approximately to 63,400 GSF, along with exterior circulation and gathering areas. The program includes the following spaces:
- Classrooms and Educational Spaces
- Student Support Spaces
- Academic Offices and Support Spaces
- Administrative Offices and Support Spaces
- Shared Building Resources (Lobby, Multipurpose room(s) etc)
School of Business Project Updates
-
950592 UCR SBB - Construction Alert #93
Week of August 19, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install Signage – INT-L1
NA
NA
SBB (Lot 8)
Install Signage – INT-L2
NA
NA
SBB (Lot 8)
Install Signage – INT-L3
NA
NA
SBB (Lot 8)
Install Signage – INT-L4
NA
NA
SBB (Lot 8)
Set Plumbing Finishes – INT-L4
NA
NA
Anderson Park
Install Exterior Signage – SITE-AP
NA
NA
SBB (Lot 8)
F/R/P Stairs – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Hardscape – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
Base and Pave – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Stairs – SITE-E
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Hardscape – SIET-E
Heavy Equipment
Noise
SBB (Lot 8)
Insall Irrigation – SITE-E
NA
NA
SBB (Lot 8)
Insall Landscaping – SITE-E
NA
NA
SBB (Lot 8)
Install Site Furnishing – SITE-E
NA
NA
SBB (Lot 8)
Insall Handrail / Guardrail – SITE-E
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-E
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-S
NA
NA
SBB (Lot 8)
Install Irrigation – SITE-W
NA
NA
SBB (Lot 8)
Install Handrail / Guardrail – SITE-W
NA
NA
SBB (Lot 8)
Install Site Furnishings – SITE-W
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-W
NA
NA
SBB (Lot 8)
Base and Pave – SITE-W
Heavy Equipment
Noise
Week of August 26, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install Signage – INT-L1
NA
NA
SBB (Lot 8)
Install Signage – INT-L2
NA
NA
SBB (Lot 8)
Install Signage – INT-L3
NA
NA
SBB (Lot 8)
Install Signage – INT-L4
NA
NA
SBB (Lot 8)
Set Plumbing Finishes – INT-L4
NA
NA
Anderson Park
Install Exterior Signage – SITE-AP
NA
NA
SBB (Lot 8)
F/R/P Stairs – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Hardscape – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
Base and Pave – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Stairs – SITE-E
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Hardscape – SIET-E
Heavy Equipment
Noise
SBB (Lot 8)
Insall Irrigation – SITE-E
NA
NA
SBB (Lot 8)
Insall Landscaping – SITE-E
NA
NA
SBB (Lot 8)
Install Site Furnishing – SITE-E
NA
NA
SBB (Lot 8)
Insall Handrail / Guardrail – SITE-E
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-E
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-S
NA
NA
SBB (Lot 8)
Install Irrigation – SITE-W
NA
NA
SBB (Lot 8)
Install Handrail / Guardrail – SITE-W
NA
NA
SBB (Lot 8)
Install Site Furnishings – SITE-W
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-W
NA
NA
SBB (Lot 8)
Base and Pave – SITE-W
Heavy Equipment
Noise
Week of September 2, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Trend CHW/HHW System Performance
NA
NA
SBB (Lot 8)
Trend HVAC System Performance
NA
NA
SBB (Lot 8)
Install Landscape (West Site)
NA
NA
SBB (Lot 8)
Install Landscape (East Site)
NA
NA
SBB (Lot 8)
Install Landscape (North Site)
NA
NA
SBB (Lot 8)
Install Irrigation (North Site)
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
South Campus Drive
South Campus Drive
6/17 – 8/30
South Campus Drive Road Closure
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #92
Week of August 12, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install Handrail / Guardrail – INT-L2
NA
NA
SBB (Lot 8)
Fine Grade – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
Backfill Planters – SITE-N
NA
NA
SBB (Lot 8)
F/R/P Stairs – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Hardscape – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
Install Irrigation – SITE-E
NA
NA
SBB (Lot 8)
Install Landscaping – SITE-E
NA
NA
SBB (Lot 8)
Install Site Furnishings – SITE-E
NA
NA
SBB (Lot 8)
Install Handrail / Guardrail – SITE-E
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-E
NA
NA
SBB (Lot 8)
Install Site Furnishings – SITE-S
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-S
NA
NA
SBB (Lot 8)
Install Irrigation – SITE-S
NA
NA
SBB (Lot 8)
Base & Pave – SITE-S
Heavy Equipment
Noise
SBB (Lot 8)
Install Landscaping – SITE-S
NA
NA
SBB (Lot 8)
Install Handrail / Guardrail – SITE-W
NA
NA
Week of August 19, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install Signage – INT-L1
NA
NA
SBB (Lot 8)
Install Signage – INT-L2
NA
NA
SBB (Lot 8)
Install Signage – INT-L3
NA
NA
SBB (Lot 8)
Install Signage – INT-L4
NA
NA
SBB (Lot 8)
Set Plumbing Finishes – INT-L4
NA
NA
Anderson Park
Install Exterior Signage – SITE-AP
NA
NA
SBB (Lot 8)
F/R/P Stairs – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Hardscape – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
Base and Pave – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Stairs – SITE-E
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Hardscape – SIET-E
Heavy Equipment
Noise
SBB (Lot 8)
Insall Irrigation – SITE-E
NA
NA
SBB (Lot 8)
Insall Landscaping – SITE-E
NA
NA
SBB (Lot 8)
Install Site Furnishing – SITE-E
NA
NA
SBB (Lot 8)
Insall Handrail / Guardrail – SITE-E
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-E
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-S
NA
NA
SBB (Lot 8)
Install Irrigation – SITE-W
NA
NA
SBB (Lot 8)
Install Handrail / Guardrail – SITE-W
NA
NA
SBB (Lot 8)
Install Site Furnishings – SITE-W
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-W
NA
NA
SBB (Lot 8)
Base and Pave – SITE-W
Heavy Equipment
Noise
Week of August 26, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Donor Wall Signage – INT-L2
NA
NA
SBB (Lot 8)
Install Handrail – SITE-N
NA
NA
SBB (Lot 8)
Base and Pave – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Stairs – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Hardscape – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
Install Exterior Signage – SITE-N
NA
NA
SBB (Lot 8)
F/R/P Stairs – SITE-E
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Hardscape – SITE-E
Heavy Equipment
Noise
SBB (Lot 8)
Install Irrigation – SITE-E
NA
NA
SBB (Lot 8)
Install Site Furnishings – SITE-E
NA
NA
SBB (Lot 8)
Install Handrail / Guardrail – SITE-E
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-E
NA
NA
SBB (Lot 8)
Install Irrigation – SITE-W
NA
NA
SBB (Lot 8)
Install Handrail / Guardrail – SITE-W
NA
NA
SBB (Lot 8)
Install Site Furnishings – SITE-W
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-W
NA
NA
SBB (Lot 8)
Base and Pave – SITE-W
Heavy Equipment
Noise
SBB (Lot 8)
Grind and Overlay Remaining Asphalt Paving / Final Cap Paving – SITE-CD
Heavy Equipment
Noise
SBB (Lot 8)
Install Landscape – SITE-W
NA
NA
SBB (Lot 8)
Install Landscape – SITE-E
Heavy Equipment
Noise
SBB (Lot 8)
Install Landscape – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
Install Irrigation – SITE-N
Heavy Equipment
Noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
South Campus Drive
South Campus Drive
6/17 – 8/30
South Campus Drive Road Closure
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #91
Please note: Due to logistical reasons and ongoing construction, South Campus Drive will remain closed until Friday, 8/30.
We sincerely apologize for the extended delays and any inconvenience this may have caused.
Week of August 5, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install Signage – INT-L1
NA
NA
SBB (Lot 8)
Final Clean / Punchlist – INT-L1
NA
NA
SBB (Lot 8)
Wood Cladding / Bench – INT-L2
NA
NA
SBB (Lot 8)
Donor Wall Signage – INT-L2
NA
NA
SBB (Lot 8)
Install Signage – INT-L2
NA
NA
SBB (Lot 8)
Install Polished Concrete – INT-L2
NA
NA
SBB (Lot 8)
Final Clean / Punchlist – INT-L2
NA
NA
SBB (Lot 8)
Install Signage – INT-L3
NA
NA
SBB (Lot 8)
Final Clean / Punchlist – INT-L3
NA
NA
SBB (Lot 8)
Final Coat of Paint – RR-L4
NA
NA
SBB (Lot 8)
Install Signage – INT-L4
NA
NA
SBB (Lot 8)
Set Plumbing Finishes – INT-L4
NA
NA
SBB (Lot 8)
Final Clean / Punchlist – INT-L4
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-AP
NA
NA
SBB (Lot 8)
Install Landscaping – SITE-AP
NA
NA
SBB (Lot 8)
Install Irrigation Mains & Sleeves – SITE-N
NA
NA
SBB (Lot 8)
Install Site Lighting Underground – SITE-N
NA
NA
SBB (Lot 8)
F/R/P Curb & Gutter – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
Fine Grade – SITE-E
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Stairs – SITE-E
Heavy Equipment
Heavy Equipment
SBB (Lot 8)
F/R/P Hardscape – SITE-E
Heavy Equipment
Heavy Equipment
SBB (Lot 8)
Install Site Furnishings – SITE-W
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-W
NA
NA
SBB (Lot 8)
Install Irrigation – SITE-W
NA
NA
SBB (Lot 8)
Base & Pave – SITE-W
Heavy Equipment
Noise
SBB (Lot 8)
Install Landscaping – SITE-W
NA
NA
Week of August 12, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Final Clean / Punch – INT-AUD
NA
NA
SBB (Lot 8)
Install Handrail / Guardrail – INT-L2
NA
NA
SBB (Lot 8)
Fine Grade – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
Backfill Planters – SITE-N
NA
NA
SBB (Lot 8)
F/R/P Stairs – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Hardscape – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
Install Irrigation – SITE-E
NA
NA
SBB (Lot 8)
Install Landscaping – SITE-E
NA
NA
SBB (Lot 8)
Install Site Furnishings – SITE-E
NA
NA
SBB (Lot 8)
Install Handrail / Guardrail – SITE-E
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-E
NA
NA
SBB (Lot 8)
Install Site Furnishings – SITE-S
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-S
NA
NA
SBB (Lot 8)
Install Irrigation – SITE-S
NA
NA
SBB (Lot 8)
Base & Pave – SITE-S
Heavy Equipment
Noise
SBB (Lot 8)
Install Landscaping – SITE-S
NA
NA
SBB (Lot 8)
Install Handrail / Guardrail – SITE-W
NA
NA
Week of August 19, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install Signage – INT-L1
NA
NA
SBB (Lot 8)
Install Signage – INT-L2
NA
NA
SBB (Lot 8)
Install Signage – INT-L3
NA
NA
SBB (Lot 8)
Install Signage – INT-L4
NA
NA
SBB (Lot 8)
Set Plumbing Finishes – INT-L4
NA
NA
Anderson Park
Install Exterior Signage – SITE-AP
NA
NA
SBB (Lot 8)
F/R/P Stairs – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Hardscape – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
Base and Pave – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Stairs – SITE-E
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Hardscape – SIET-E
Heavy Equipment
Noise
SBB (Lot 8)
Insall Irrigation – SITE-E
NA
NA
SBB (Lot 8)
Insall Landscaping – SITE-E
NA
NA
SBB (Lot 8)
Install Site Furnishing – SITE-E
NA
NA
SBB (Lot 8)
Insall Handrail / Guardrail – SITE-E
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-E
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-S
NA
NA
SBB (Lot 8)
Install Irrigation – SITE-W
NA
NA
SBB (Lot 8)
Install Handrail / Guardrail – SITE-W
NA
NA
SBB (Lot 8)
Install Site Furnishings – SITE-W
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-W
NA
NA
SBB (Lot 8)
Base and Pave – SITE-W
Heavy Equipment
Noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
South Campus Drive
South Campus Drive
6/17 – 8/19
South Campus Drive Road Closure
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #90
Week of July 29, 2024
Construction Activities
Location Activity Equipment Used Anticipated Disturbance SBB (Lot 8)
Final Coat of Paint – RR-L1
NA
NA
SBB (Lot 8)
Install Roll Up Door – FR08-185
NA
NA
SBB (Lot 8)
Install Window Shades – INT-L1
NA
NA
SBB (Lot 8)
Install FF&E – INT-L1
NA
NA
SBB (Lot 8)
Install Polished Concrete – INT-L1
NA
NA
SBB (Lot 8)
Install Fixed Seating – INT-AUD
NA
NA
SBB (Lot 8)
Remove Dancefloor – INT-L2
NA
NA
SBB (Lot 8)
Install Window Shades – INT-L2
NA
NA
SBB (Lot 8)
Final Coat of Paint – RR-L3
NA
NA
SBB (Lot 8)
Install Window Shades – INT-L3
NA
NA
SBB (Lot 8)
Set Plumbing Finishes – INT-L3
NA
NA
SBB (Lot 8)
Install Electrical Finishes – RR-L4
NA
NA
SBB (Lot 8)
Install Window Shades – INT-L4
NA
NA
Anderson Park
Install Site Furnishings – SITE-AP
NA
NA
Anderson Park
Install Irrigation – SITE-AP
NA
NA
Anderson Park
Install Handrail/Guardrail – SITE-AP
NA
NA
SBB (Lot 8)
Backfill / Rough Grade / Cut Curbs – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Curbs – SITE-E
Heavy Equipment
Noise
SBB (Lot 8)
Fine Grade – SITE-S
Heavy Equipment
Noise
SBB (Lot 8)
Backfill & LID Planter Install – SITE-S
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Hardscape – SITE-S
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Stairs – SITE-W
Heavy Equipment
Noise
Campus Drive
Base & Pave – SITE-CD
Heavy Equipment
Noise
Week of August 5, 2024
Construction Activities
Location Activity Equipment Used Anticipated Disturbance SBB (Lot 8)
Install Signage – INT-L1
NA
NA
SBB (Lot 8)
Final Clean / Punchlist – INT-L1
NA
NA
SBB (Lot 8)
Wood Cladding / Bench – INT-L2
NA
NA
SBB (Lot 8)
Donor Wall Signage – INT-L2
NA
NA
SBB (Lot 8)
Install Signage – INT-L2
NA
NA
SBB (Lot 8)
Install Polished Concrete – INT-L2
NA
NA
SBB (Lot 8)
Final Clean / Punchlist – INT-L2
NA
NA
SBB (Lot 8)
Install Signage – INT-L3
NA
NA
SBB (Lot 8)
Final Clean / Punchlist – INT-L3
NA
NA
SBB (Lot 8)
Final Coat of Paint – RR-L4
NA
NA
SBB (Lot 8)
Install Signage – INT-L4
NA
NA
SBB (Lot 8)
Set Plumbing Finishes – INT-L4
NA
NA
SBB (Lot 8)
Final Clean / Punchlist – INT-L4
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-AP
NA
NA
SBB (Lot 8)
Install Landscaping – SITE-AP
NA
NA
SBB (Lot 8)
Install Irrigation Mains & Sleeves – SITE-N
NA
NA
SBB (Lot 8)
Install Site Lighting Underground – SITE-N
NA
NA
SBB (Lot 8)
F/R/P Curb & Gutter – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
Fine Grade – SITE-E
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Stairs – SITE-E
Heavy Equipment
Heavy Equipment
SBB (Lot 8)
F/R/P Hardscape – SITE-E
Heavy Equipment
Heavy Equipment
SBB (Lot 8)
Install Site Furnishings – SITE-W
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-W
NA
NA
SBB (Lot 8)
Install Irrigation – SITE-W
NA
NA
SBB (Lot 8)
Base & Pave – SITE-W
Heavy Equipment
Noise
SBB (Lot 8)
Install Landscaping – SITE-W
NA
NA
Week of August 12, 2024
Construction Activities
Location Activity Equipment Used Anticipated Disturbance SBB (Lot 8)
Final Clean / Punch – INT-AUD
NA
NA
SBB (Lot 8)
Install Handrail / Guardrail – INT-L2
NA
NA
SBB (Lot 8)
Fine Grade – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
Backfill Planters – SITE-N
NA
NA
SBB (Lot 8)
F/R/P Stairs – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Hardscape – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
Install Irrigation – SITE-E
NA
NA
SBB (Lot 8)
Install Landscaping – SITE-E
NA
NA
SBB (Lot 8)
Install Site Furnishings – SITE-E
NA
NA
SBB (Lot 8)
Install Handrail / Guardrail – SITE-E
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-E
NA
NA
SBB (Lot 8)
Install Site Furnishings – SITE-S
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-S
NA
NA
SBB (Lot 8)
Install Irrigation – SITE-S
NA
NA
SBB (Lot 8)
Base & Pave – SITE-S
Heavy Equipment
Noise
SBB (Lot 8)
Install Landscaping – SITE-S
NA
NA
SBB (Lot 8)
Install Handrail / Guardrail – SITE-W
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
South Campus Drive
South Campus Drive
6/17 – 8/12
South Campus Drive Road Closure
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #89
Week of July 22, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install Electrical Finishes – RR-L1
NA
NA
SBB (Lot 8)
Install Casework / Millwork – INT-L1
NA
NA
SBB (Lot 8)
MEPF Devices at Wood Ceilings – INT-L1
NA
NA
SBB (Lot 8)
Install Interior Glazing Glass – INT-L1
NA
NA
SBB (Lot 8)
Install Wood Ceilings – INT-L1
NA
NA
SBB (Lot 8)
Install FEC's – INT-L1
NA
NA
SBB (Lot 8)
Install Operable Partition Walls – INT-L1
NA
NA
SBB (Lot 8)
Install Wall Protection – INT-L1
NA
NA
SBB (Lot 8)
Install Marker Boards – INT-L1
NA
NA
SBB (Lot 8)
Install AV Devices – INT-L1
NA
NA
SBB (Lot 8)
Install Telecom Devices – INT-L1
NA
NA
SBB (Lot 8)
Install Electrical Cover Plates – INT-L1
NA
NA
SBB (Lot 8)
Install Security Devices – INT-L1
NA
NA
SBB (Lot 8)
Install Carpet & Base – INT-L1
NA
NA
SBB (Lot 8)
Install Security Devices – INT-AUD
NA
NA
SBB (Lot 8)
Install Polished Concrete – INT-AUD
NA
NA
SBB (Lot 8)
Install Marker Boards – INT-AUD
NA
NA
SBB (Lot 8)
Install Telecom Devices – INT-AUD
NA
NA
SBB (Lot 8)
Install Electrical Cover Plates – INT-AUD
NA
NA
SBB (Lot 8)
Final Coat of Paint – RR-L2
NA
NA
SBB (Lot 8)
MEPF Devices at Wood Ceiling – INT-L2
NA
NA
SBB (Lot 8)
Install Wood Ceilings – INT-L2
NA
NA
SBB (Lot 8)
Install Casework / Millwork – INT-L2
NA
NA
SBB (Lot 8)
Set Plumbing Finishes – INT-L2
NA
NA
SBB (Lot 8)
Install Electrical Finishes – RR-L3
NA
NA
SBB (Lot 8)
Install Casework / Millwork – INT-L3
NA
NA
SBB (Lot 8)
Toilet Partitions and Accessories – RR-L4
NA
NA
SBB (Lot 8)
Install Casework / Millwork – INT-L4
NA
NA
SBB (Lot 8)
Install Marker Boards – INT-L4
NA
NA
SBB (Lot 8)
Install AV Devices – INT-L4
NA
NA
SBB (Lot 8)
Install FF&E – INT-L4
NA
NA
SBB (Lot 8)
Remove Protection & Install Finishes – ELEV-295
NA
NA
Anderson Park
F/R/P Remaining Hardscape Along Campus Drive – SITE-AP
Heavy Equipment
Noise
SBB (Lot 8)
Backfill / Rough Grade / Cut Curbs – SITE-E
Heavy Equipment
Noise
SBB (Lot 8)
Install Irrigation Mains & Sleeves – SITE-E
NA
NA
SBB (Lot 8)
Install Site Lighting Underground – SITE-E
NA
NA
SBB (Lot 8)
F/R/P Curb & Gutter – SITE-S
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Curb & Gutter – SITE-W
Heavy Equipment
Noise
SBB (Lot 8)
Fine Grade – SITE-W
Heavy Equipment
Noise
SBB (Lot 8)
Backfill Planters – SITE-W
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Hardscape – SITE-W
Heavy Equipment
Noise
Campus Drive
Fine Grade for Asphalt – SITE-CD
Heavy Equipment
Noise
Week of July 29, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Final Coat of Paint – RR-L1
NA
NA
SBB (Lot 8)
Install Roll Up Door – FR08-185
NA
NA
SBB (Lot 8)
Install Window Shades – INT-L1
NA
NA
SBB (Lot 8)
Install FF&E – INT-L1
NA
NA
SBB (Lot 8)
Install Polished Concrete – INT-L1
NA
NA
SBB (Lot 8)
Install Fixed Seating – INT-AUD
NA
NA
SBB (Lot 8)
Remove Dancefloor – INT-L2
NA
NA
SBB (Lot 8)
Install Window Shades – INT-L2
NA
NA
SBB (Lot 8)
Final Coat of Paint – RR-L3
NA
NA
SBB (Lot 8)
Install Window Shades – INT-L3
NA
NA
SBB (Lot 8)
Set Plumbing Finishes – INT-L3
NA
NA
SBB (Lot 8)
Install Electrical Finishes – RR-L4
NA
NA
SBB (Lot 8)
Install Window Shades – INT-L4
NA
NA
Anderson Park
Install Site Furnishings – SITE-AP
NA
NA
Anderson Park
Install Irrigation – SITE-AP
NA
NA
Anderson Park
Install Handrail/Guardrail – SITE-AP
NA
NA
SBB (Lot 8)
Backfill / Rough Grade / Cut Curbs – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Curbs – SITE-E
Heavy Equipment
Noise
SBB (Lot 8)
Fine Grade – SITE-S
Heavy Equipment
Noise
SBB (Lot 8)
Backfill & LID Planter Install – SITE-S
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Hardscape – SITE-S
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Stairs – SITE-W
Heavy Equipment
Noise
Campus Drive
Base & Pave – SITE-CD
Heavy Equipment
Noise
Week of August 5, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install Signage – INT-L1
NA
NA
SBB (Lot 8)
Final Clean / Punchlist – INT-L1
NA
NA
SBB (Lot 8)
Wood Cladding / Bench – INT-L2
NA
NA
SBB (Lot 8)
Donor Wall Signage – INT-L2
NA
NA
SBB (Lot 8)
Install Signage – INT-L2
NA
NA
SBB (Lot 8)
Install Polished Concrete – INT-L2
NA
NA
SBB (Lot 8)
Final Clean / Punchlist – INT-L2
NA
NA
SBB (Lot 8)
Install Signage – INT-L3
NA
NA
SBB (Lot 8)
Final Clean / Punchlist – INT-L3
NA
NA
SBB (Lot 8)
Final Coat of Paint – RR-L4
NA
NA
SBB (Lot 8)
Install Signage – INT-L4
NA
NA
SBB (Lot 8)
Set Plumbing Finishes – INT-L4
NA
NA
SBB (Lot 8)
Final Clean / Punchlist – INT-L4
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-AP
NA
NA
SBB (Lot 8)
Install Landscaping – SITE-AP
NA
NA
SBB (Lot 8)
Install Irrigation Mains & Sleeves – SITE-N
NA
NA
SBB (Lot 8)
Install Site Lighting Underground – SITE-N
NA
NA
SBB (Lot 8)
F/R/P Curb & Gutter – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
Fine Grade – SITE-E
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Stairs – SITE-E
Heavy Equipment
Heavy Equipment
SBB (Lot 8)
F/R/P Hardscape – SITE-E
Heavy Equipment
Heavy Equipment
SBB (Lot 8)
Install Site Furnishings – SITE-W
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-W
NA
NA
SBB (Lot 8)
Install Irrigation – SITE-W
NA
NA
SBB (Lot 8)
Base & Pave – SITE-W
Heavy Equipment
Noise
SBB (Lot 8)
Install Landscaping – SITE-W
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
South Campus Drive
South Campus Drive
6/17 – 8/9
South Campus Drive Road Closure
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #88
Week of July 15, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install Plumbing Fixtures – RR-L1
NA
NA
SBB (Lot 8)
Toilet Partitions and Accessories – RR-L1
NA
NA
SBB (Lot 8)
Seal Concrete Floor – FR08-195
NA
NA
SBB (Lot 8)
Install Cafe Equipment – FR08-165
NA
NA
SBB (Lot 8)
Install Doors & Hardware – INT-L1
NA
NA
SBB (Lot 8)
Final Coat of Paint – INT-L1
NA
NA
SBB (Lot 8)
Set Plumbing Finishes – INT-L1
NA
NA
SBB (Lot 8)
Install AV Devices – INT-AUD
NA
NA
SBB (Lot 8)
Install Wood Wall Panels – INT-AUD
NA
NA
SBB (Lot 8)
Install FF&E – INT-AUD
NA
NA
SBB (Lot 8)
Install Electrical Finishes – RR-L2
NA
NA
SBB (Lot 8)
Toilet Partitions and Accessories – RR-L3
NA
NA
SBB (Lot 8)
Install Interior Glazing Glass – INT-L3
NA
NA
SBB (Lot 8)
Install Marker Boards – INT-L3
NA
NA
SBB (Lot 8)
Install AV Devices – INT-L3
NA
NA
SBB (Lot 8)
Install Interior Glazing Glass – INT-L4
NA
NA
SBB (Lot 8)
F/R/P Wall Footings – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Seat Benches – SITE-E
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Site Walls – Amphitheater – SITE-E
Heavy Equipment
Noise
SBB (Lot 8)
Install Site Lighting Underground – SITE-S
NA
NA
SBB (Lot 8)
Install Irrigation Mains & Sleeves – SITE-S
NA
NA
SBB (Lot 8)
Install Site Lighting Underground – SITE-W
NA
NA
SBB (Lot 8)
Install Irrigation Mains & Sleeves – SITE-W
NA
NA
Campus Drive
F/R/P Curb & Gutter – SITE-CD
Heavy Equipment
Noise
Campus Drive
Grade Curb Cuts – SITE-CD
Heavy Equipment
Noise
Week of July 22, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install Electrical Finishes – RR-L1
NA
NA
SBB (Lot 8)
Install Casework / Millwork – INT-L1
NA
NA
SBB (Lot 8)
MEPF Devices at Wood Ceilings – INT-L1
NA
NA
SBB (Lot 8)
Install Interior Glazing Glass – INT-L1
NA
NA
SBB (Lot 8)
Install Wood Ceilings – INT-L1
NA
NA
SBB (Lot 8)
Install FEC's – INT-L1
NA
NA
SBB (Lot 8)
Install Operable Partition Walls – INT-L1
NA
NA
SBB (Lot 8)
Install Wall Protection – INT-L1
NA
NA
SBB (Lot 8)
Install Marker Boards – INT-L1
NA
NA
SBB (Lot 8)
Install AV Devices – INT-L1
NA
NA
SBB (Lot 8)
Install Telecom Devices – INT-L1
NA
NA
SBB (Lot 8)
Install Electrical Cover Plates – INT-L1
NA
NA
SBB (Lot 8)
Install Security Devices – INT-L1
NA
NA
SBB (Lot 8)
Install Carpet & Base – INT-L1
NA
NA
SBB (Lot 8)
Install Security Devices – INT-AUD
NA
NA
SBB (Lot 8)
Install Polished Concrete – INT-AUD
NA
NA
SBB (Lot 8)
Install Marker Boards – INT-AUD
NA
NA
SBB (Lot 8)
Install Telecom Devices – INT-AUD
NA
NA
SBB (Lot 8)
Install Electrical Cover Plates – INT-AUD
NA
NA
SBB (Lot 8)
Final Coat of Paint – RR-L2
NA
NA
SBB (Lot 8)
MEPF Devices at Wood Ceiling – INT-L2
NA
NA
SBB (Lot 8)
Install Wood Ceilings – INT-L2
NA
NA
SBB (Lot 8)
Install Casework / Millwork – INT-L2
NA
NA
SBB (Lot 8)
Set Plumbing Finishes – INT-L2
NA
NA
SBB (Lot 8)
Install Electrical Finishes – RR-L3
NA
NA
SBB (Lot 8)
Install Casework / Millwork – INT-L3
NA
NA
SBB (Lot 8)
Toilet Partitions and Accessories – RR-L4
NA
NA
SBB (Lot 8)
Install Casework / Millwork – INT-L4
NA
NA
SBB (Lot 8)
Install Marker Boards – INT-L4
NA
NA
SBB (Lot 8)
Install AV Devices – INT-L4
NA
NA
SBB (Lot 8)
Install FF&E – INT-L4
NA
NA
SBB (Lot 8)
Remove Protection & Install Finishes – ELEV-295
NA
NA
Anderson Park
F/R/P Remaining Hardscape Along Campus Drive – SITE-AP
Heavy Equipment
Noise
SBB (Lot 8)
Backfill / Rough Grade / Cut Curbs – SITE-E
Heavy Equipment
Noise
SBB (Lot 8)
Install Irrigation Mains & Sleeves – SITE-E
NA
NA
SBB (Lot 8)
Install Site Lighting Underground – SITE-E
NA
NA
SBB (Lot 8)
F/R/P Curb & Gutter – SITE-S
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Curb & Gutter – SITE-W
Heavy Equipment
Noise
SBB (Lot 8)
Fine Grade – SITE-W
Heavy Equipment
Noise
SBB (Lot 8)
Backfill Planters – SITE-W
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Hardscape – SITE-W
Heavy Equipment
Noise
Campus Drive
Fine Grade for Asphalt – SITE-CD
Heavy Equipment
Noise
Week of July 29, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Final Coat of Paint – RR-L1
NA
NA
SBB (Lot 8)
Install Roll Up Door – FR08-185
NA
NA
SBB (Lot 8)
Install Window Shades – INT-L1
NA
NA
SBB (Lot 8)
Install FF&E – INT-L1
NA
NA
SBB (Lot 8)
Install Polished Concrete – INT-L1
NA
NA
SBB (Lot 8)
Install Fixed Seating – INT-AUD
NA
NA
SBB (Lot 8)
Remove Dancefloor – INT-L2
NA
NA
SBB (Lot 8)
Install Window Shades – INT-L2
NA
NA
SBB (Lot 8)
Final Coat of Paint – RR-L3
NA
NA
SBB (Lot 8)
Install Window Shades – INT-L3
NA
NA
SBB (Lot 8)
Set Plumbing Finishes – INT-L3
NA
NA
SBB (Lot 8)
Install Electrical Finishes – RR-L4
NA
NA
SBB (Lot 8)
Install Window Shades – INT-L4
NA
NA
Anderson Park
Install Site Furnishings – SITE-AP
NA
NA
Anderson Park
Install Irrigation – SITE-AP
NA
NA
Anderson Park
Install Handrail/Guardrail – SITE-AP
NA
NA
SBB (Lot 8)
Backfill / Rough Grade / Cut Curbs – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Curbs – SITE-E
Heavy Equipment
Noise
SBB (Lot 8)
Fine Grade – SITE-S
Heavy Equipment
Noise
SBB (Lot 8)
Backfill & LID Planter Install – SITE-S
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Hardscape – SITE-S
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Stairs – SITE-W
Heavy Equipment
Noise
Campus Drive
Base & Pave – SITE-CD
Heavy Equipment
Noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
South Campus Drive
South Campus Drive
6/17 – 8/9
South Campus Drive Road Closure
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #87
Week of July 8, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB Site (Lot 8)
Toilet Partitions and Accessories - RR-L1
NA
NA
SBB Site (Lot 8)
Install Cafe Equipment – INT-L1
NA
NA
SBB Site (Lot 8)
Install FEC's - INT-L1
NA
NA
SBB Site (Lot 8)
Install Operable Partition Walls – INT-L1
NA
NA
SBB Site (Lot 8)
Install Wall Protection – INT-L1
NA
NA
SBB Site (Lot 8)
Install Marker Boards – INT-L1
NA
NA
SBB Site (Lot 8)
Install AV Devices – INT-L1
NA
NA
SBB Site (Lot 8)
Install Telecom Devices – INT-L1
NA
NA
SBB Site (Lot 8)
Install Electrical Cover Plates – INT-L1
NA
NA
SBB Site (Lot 8)
Install Security Devices – INT-L1
NA
NA
SBB Site (Lot 8)
Install Casework / Millwork (Remaining) – INT-L1
NA
NA
SBB Site (Lot 8)
Install Carpet & Base – INT-L1
NA
NA
SBB Site (Lot 8)
Install AV Devices – INT-AUD
NA
NA
SBB Site (Lot 8)
Install Handrail – INT-AUD
NA
NA
SBB Site (Lot 8)
Install Operable Partition Walls – INT-L2
NA
NA
SBB Site (Lot 8)
Final Coat of Paint – RR-L3
NA
NA
SBB Site (Lot 8)
Install Electrical Finishes – RR-L4
NA
NA
SBB Site (Lot 8)
Measure / Fab / Install Countertops (Remaining) – INT-L4
NA
NA
SBB Site (Lot 8)
Schedule State Elevator Inspection - ELEV
NA
NA
Anderson Park
Install Handrail / Guardrail - SITE
NA
NA
SBB Site (Lot 8)
F/R/P Curb & Gutter – SITE-N
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Stairs – SITE-E
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Hardscape – SITE-E
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Hardscape – SITE-S
Heavy Equipment
Noise
SBB Site (Lot 8)
Fine Grade – SITE-W
Heavy Equipment
Noise
SBB Site (Lot 8)
Backfill Planters – SITE-W
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Stairs – SITE-W
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Hardscape – SITE-W
Heavy Equipment
Noise
SBB Site (Lot 8)
Fine Grade for Asphalt – SITE-CD
Heavy Equipment
Noise
Week of July 15, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Complete Landscape Finish Site Work at Manlift Leaveout – ML
NA
NA
SBB (Lot 8)
Install Electrical Finishes – RR-L1
NA
NA
SBB (Lot 8)
Final Coat of Paint – RR-L1
NA
NA
SBB (Lot 8)
Install FF&E – INT-L1
NA
NA
SBB (Lot 8)
Install Marker Boards – INT-AUD
NA
NA
SBB (Lot 8)
Install Polished Concrete – INT-AUD
NA
NA
SBB (Lot 8)
Install Security Devices – INT-AUD
NA
NA
SBB (Lot 8)
Install Telecom Devices – INT-AUD
NA
NA
SBB (Lot 8)
Install Electrical Cover Plates – INT-AUD
NA
NA
SBB (Lot 8)
Final Coat of Paint – INT-L2
NA
NA
SBB (Lot 8)
Final Coat of Paint – INT-L3
NA
NA
SBB (Lot 8)
Final Coat of Paint – RR-L4
NA
NA
SBB (Lot 8)
Install FF&E – INT-L4
NA
NA
Anderson Park
Install Site Furnishings – SITE-AP
NA
NA
Anderson Park
Install Irrigation – SITE-AP
NA
NA
SBB (Lot 8)
Fine Grade – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
Backfill Planters – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Stairs – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Hardscape – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
Field Measure and Procure Handrail / Guardrail – SITE-E
NA
NA
SBB (Lot 8)
Field Measure and Procure Handrail / Guardrail – SITE-W
NA
NA
Campus Drive
Base & Pave – SITE-CD
Heavy Equipment
Noise
Campus Drive
Demo – SITE-CD
Heavy Equipment
Noise
Campus Drive
Rough Grade – SITE-CD
Heavy Equipment
Noise
Week of July 22, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
MEPF Devices at Wood Ceiling – INT-L2
NA
NA
SBB (Lot 8)
Measure / Fab / Install Countertops (Remaining) – INT-L2
NA
NA
SBB (Lot 8)
Install Wood Ceilings – INT-L2
NA
NA
SBB (Lot 8)
Install Fixed Seating – INT-L2
NA
NA
SBB (Lot 8)
MEPF Devices at Wood Ceiling – INT-L2
NA
NA
SBB (Lot 8)
Install Wood Ceilings – INT-L2
NA
NA
SBB (Lot 8)
Install Wall Protection – INT-L2
NA
NA
SBB (Lot 8)
Install Marker Boards – INT-L2
NA
NA
SBB (Lot 8)
Install Wall Protection – INT-L3
NA
NA
SBB (Lot 8)
Final Coat of Paint – INT-L4
NA
NA
SBB (Lot 8)
Field Measure and Procure Handrail / Guardrail – SITE-N
NA
NA
SBB (Lot 8)
Install Site Furnishings – SITE-E
NA
NA
SBB (Lot 8)
Install Irrigation – SITE-E
NA
NA
Campus Drive
Grade Curb Cuts – SITE-CD
Heavy Equipment
Noise
Campus Drive
F/R/P Curb & Gutter – SITE-CD
Heavy Equipment
Noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
South Campus Drive
South Campus Drive
6/17 – 7/26
South Campus Drive Road Closure
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #86
Week of July 1, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB Site (Lot 8)
Complete Hardscape Finish Site Work at Manlift Leaveout – EXT-ML
NA
NA
SBB Site (Lot 8)
Seal Concrete Floor – INT-L1
NA
NA
SBB Site (Lot 8)
Install Doors & Hardware – INT-L1
NA
NA
SBB Site (Lot 8)
Set Plumbing Finishes – INT-L1
NA
NA
SBB Site (Lot 8)
Final Coat of Paint – INT-L1
NA
NA
SBB Site (Lot 8)
Install Linoleum Flooring – INT-L1
NA
NA
SBB Site (Lot 8)
Install Signage – INT-AUD
NA
NA
SBB Site (Lot 8)
Install FEC's – INT-AUD
NA
NA
SBB Site (Lot 8)
Install Doors & Hardware – INT-AUD
NA
NA
SBB Site (Lot 8)
Install Wall Protection – INT-AUD
NA
NA
SBB Site (Lot 8)
Install Wood Wall Panels – INT-AUD
NA
NA
SBB Site (Lot 8)
Install FF&E – INT-AUD
NA
NA
SBB Site (Lot 8)
Acoustical Wall Panels – INT-AUD
NA
NA
SBB Site (Lot 8)
Final Coat of Paint – RR-L2
NA
NA
SBB Site (Lot 8)
Install FEC's – INT-L2
NA
NA
SBB Site (Lot 8)
Set Plumbing Finishes – INT-L2
NA
NA
SBB Site (Lot 8)
Install Electrical Finishes – RR-L3
NA
NA
SBB Site (Lot 8)
Install FEC's – INT-L3
NA
NA
SBB Site (Lot 8)
Set Plumbing Finishes – INT-L3
NA
NA
SBB Site (Lot 8)
Measure / Fab / Install Countertops (Remaining) – INT-L3
NA
NA
SBB Site (Lot 8)
Install FF&E – INT-L3
NA
NA
SBB Site (Lot 8)
Toilet Partitions and Accessories – RR-L4
NA
NA
SBB Site (Lot 8)
Install FEC's – INT-L4
NA
NA
SBB Site (Lot 8)
Set Plumbing Finishes – INT-L4
NA
NA
SBB Site (Lot 8)
Install Casework / Millwork (Remaining) – INT-L4
NA
NA
SBB Site (Lot 8)
Fine Grade – SITE-E
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Curb & Gutter – SITE-W
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Curb & Gutter – SITE-CD
Heavy Equipment
Noise
SBB (Lot 8)
Air Balance - Level 3 – SU-TB
NA
NA
Week of July 8, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB Site (Lot 8)
Toilet Partitions and Accessories - RR-L1
NA
NA
SBB Site (Lot 8)
Install Cafe Equipment – INT-L1
NA
NA
SBB Site (Lot 8)
Install FEC's - INT-L1
NA
NA
SBB Site (Lot 8)
Install Operable Partition Walls – INT-L1
NA
NA
SBB Site (Lot 8)
Install Wall Protection – INT-L1
NA
NA
SBB Site (Lot 8)
Install Marker Boards – INT-L1
NA
NA
SBB Site (Lot 8)
Install AV Devices – INT-L1
NA
NA
SBB Site (Lot 8)
Install Telecom Devices – INT-L1
NA
NA
SBB Site (Lot 8)
Install Electrical Cover Plates – INT-L1
NA
NA
SBB Site (Lot 8)
Install Security Devices – INT-L1
NA
NA
SBB Site (Lot 8)
Install Casework / Millwork (Remaining) – INT-L1
NA
NA
SBB Site (Lot 8)
Install Carpet & Base – INT-L1
NA
NA
SBB Site (Lot 8)
Install AV Devices – INT-AUD
NA
NA
SBB Site (Lot 8)
Install Handrail – INT-AUD
NA
NA
SBB Site (Lot 8)
Install Operable Partition Walls – INT-L2
NA
NA
SBB Site (Lot 8)
Final Coat of Paint – RR-L3
NA
NA
SBB Site (Lot 8)
Install Electrical Finishes – RR-L4
NA
NA
SBB Site (Lot 8)
Measure / Fab / Install Countertops (Remaining) – INT-L4
NA
NA
SBB Site (Lot 8)
Schedule State Elevator Inspection - ELEV
NA
NA
Anderson Park
Install Handrail / Guardrail - SITE
NA
NA
SBB Site (Lot 8)
F/R/P Curb & Gutter – SITE-N
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Stairs – SITE-E
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Hardscape – SITE-E
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Hardscape – SITE-S
Heavy Equipment
Noise
SBB Site (Lot 8)
Fine Grade – SITE-W
Heavy Equipment
Noise
SBB Site (Lot 8)
Backfill Planters – SITE-W
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Stairs – SITE-W
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Hardscape – SITE-W
Heavy Equipment
Noise
SBB Site (Lot 8)
Fine Grade for Asphalt – SITE-CD
Heavy Equipment
Noise
Week of July 15, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Complete Landscape Finish Site Work at Manlift Leaveout – ML
NA
NA
SBB (Lot 8)
Install Electrical Finishes – RR-L1
NA
NA
SBB (Lot 8)
Final Coat of Paint – RR-L1
NA
NA
SBB (Lot 8)
Install FF&E – INT-L1
NA
NA
SBB (Lot 8)
Install Marker Boards – INT-AUD
NA
NA
SBB (Lot 8)
Install Polished Concrete – INT-AUD
NA
NA
SBB (Lot 8)
Install Security Devices – INT-AUD
NA
NA
SBB (Lot 8)
Install Telecom Devices – INT-AUD
NA
NA
SBB (Lot 8)
Install Electrical Cover Plates – INT-AUD
NA
NA
SBB (Lot 8)
Final Coat of Paint – INT-L2
NA
NA
SBB (Lot 8)
Final Coat of Paint – INT-L3
NA
NA
SBB (Lot 8)
Final Coat of Paint – RR-L4
NA
NA
SBB (Lot 8)
Install FF&E – INT-L4
NA
NA
Anderson Park
Install Site Furnishings – SITE-AP
NA
NA
Anderson Park
Install Irrigation – SITE-AP
NA
NA
SBB (Lot 8)
Fine Grade – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
Backfill Planters – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Stairs – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Hardscape – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
Field Measure and Procure Handrail / Guardrail – SITE-E
NA
NA
SBB (Lot 8)
Field Measure and Procure Handrail / Guardrail – SITE-W
NA
NA
Campus Drive
Base & Pave – SITE-CD
Heavy Equipment
Noise
Campus Drive
Demo – SITE-CD
Heavy Equipment
Noise
Campus Drive
Rough Grade – SITE-CD
Heavy Equipment
Noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
South Campus Drive
South Campus Drive
6/17 – 7/26
South Campus Drive Road Closure
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #85
Week of June 24, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install Permanent Roofing - RF
NA
NA
SBB (Lot 8)
Install Countertops – RR-L1
NA
NA
SBB (Lot 8)
Install Lights and Egress Lighting – INT-L1
NA
NA
SBB (Lot 8)
Install HVAC Grills & Diffusers – INT-L1
NA
NA
SBB (Lot 8)
Install Fire Sprinkler Drops / Heads – INT-L1
NA
NA
SBB (Lot 8)
Install Fire Alarm Devices – INT-L1
NA
NA
SBB (Lot 8)
Wood Ceiling Hangers / Grid Supports – INT-L1
NA
NA
SBB (Lot 8)
Install Casework / Millwork (Wet) – INT-L1
NA
NA
SBB (Lot 8)
Install Fire Sprinkler Drops / Heads – INT-AUD
NA
NA
SBB (Lot 8)
Install Fire Alarm Devices – INT-AUD
NA
NA
SBB (Lot 8)
Install Lights and Egress Lighting – INT-AUD
NA
NA
SBB (Lot 8)
Install HVAC Grills & Diffusers – INT-AUD
NA
NA
SBB (Lot 8)
Final Overhead Inspections and Sign-off for Ceiling Tile – INT-AUD
NA
NA
SBB (Lot 8)
Install Tile – RR-L2
NA
NA
SBB (Lot 8)
Wood Ceiling Hangers / Grid Supports – INT-L2
NA
NA
SBB (Lot 8)
Install Casework / Millwork (Remaining and Wet) – INT-L2
NA
NA
SBB (Lot 8)
Install Carpet & Base – INT-L2
NA
NA
SBB (Lot 8)
Install AV Devices – INT-L2
NA
NA
SBB (Lot 8)
Install Tile – RR-L3
NA
NA
SBB (Lot 8)
Install Linoleum Flooring – INT-L3
NA
NA
SBB (Lot 8)
Install Lockers – INT-L3
NA
NA
SBB (Lot 8)
Install Casework / Millwork (Wet) – INT-L3
NA
NA
SBB (Lot 8)
Install Tile – RR-L4
NA
NA
SBB (Lot 8)
Install Telecom Devices – INT-L4
NA
NA
SBB (Lot 8)
Install Electrical Cover Plates – INT-L4
NA
NA
SBB (Lot 8)
Install Security Devices – INT-L4
NA
NA
Anderson Park
Install Interior Glazing – INT-L4
NA
NA
SBB Site (Lot 8)
Install Acoustical Ceiling Tile – INT-L4
NA
NA
SBB Site (Lot 8)
Install Casework / Millwork (Wet) – INT-L4
NA
NA
SBB Site (Lot 8)
Install Site Furnishings – SITE-AP
Heavy Equipment
Noise
Anderson Park
Install Irrigation Sleeves – SITE-N
Heavy Equipment
Noise
SBB Site (Lot 8)
Install Site Lighting Underground – SITE-N
Heavy Equipment
Noise
SBB Site (Lot 8)
Install Site Lighting Underground – SITE-E
Heavy Equipment
Noise
SBB Site (Lot 8)
Install Site Lighting Underground – SITE-S
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Curb & Gutter – SITE-S
Heavy Equipment
Noise
SBB Site (Lot 8)
Rough Grade / Cut Curbs – SITE-W
Heavy Equipment
Noise
SBB Site (Lot 8)
Install Irrigation Sleeves – SITE-W
Heavy Equipment
Noise
SBB Site (Lot 8)
Install Site Lighting Underground – SITE-W
Heavy Equipment
Noise
Week of July 1, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB Site (Lot 8)
Complete Hardscape Finish Site Work at Manlift Leaveout – EXT-ML
NA
NA
SBB Site (Lot 8)
Seal Concrete Floor – INT-L1
NA
NA
SBB Site (Lot 8)
Install Doors & Hardware – INT-L1
NA
NA
SBB Site (Lot 8)
Set Plumbing Finishes – INT-L1
NA
NA
SBB Site (Lot 8)
Final Coat of Paint – INT-L1
NA
NA
SBB Site (Lot 8)
Install Linoleum Flooring – INT-L1
NA
NA
SBB Site (Lot 8)
Install Signage – INT-AUD
NA
NA
SBB Site (Lot 8)
Install FEC's – INT-AUD
NA
NA
SBB Site (Lot 8)
Install Doors & Hardware – INT-AUD
NA
NA
SBB Site (Lot 8)
Install Wall Protection – INT-AUD
NA
NA
SBB Site (Lot 8)
Install Wood Wall Panels – INT-AUD
NA
NA
SBB Site (Lot 8)
Install FF&E – INT-AUD
NA
NA
SBB Site (Lot 8)
Acoustical Wall Panels – INT-AUD
NA
NA
SBB Site (Lot 8)
Final Coat of Paint – RR-L2
NA
NA
SBB Site (Lot 8)
Install FEC's – INT-L2
NA
NA
SBB Site (Lot 8)
Set Plumbing Finishes – INT-L2
NA
NA
SBB Site (Lot 8)
Install Electrical Finishes – RR-L3
NA
NA
SBB Site (Lot 8)
Install FEC's – INT-L3
NA
NA
SBB Site (Lot 8)
Set Plumbing Finishes – INT-L3
NA
NA
SBB Site (Lot 8)
Measure / Fab / Install Countertops (Remaining) – INT-L3
NA
NA
SBB Site (Lot 8)
Install FF&E – INT-L3
NA
NA
SBB Site (Lot 8)
Toilet Partitions and Accessories – RR-L4
NA
NA
SBB Site (Lot 8)
Install FEC's – INT-L4
NA
NA
SBB Site (Lot 8)
Set Plumbing Finishes – INT-L4
NA
NA
SBB Site (Lot 8)
Install Casework / Millwork (Remaining) – INT-L4
NA
NA
SBB Site (Lot 8)
Fine Grade – SITE-E
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Curb & Gutter – SITE-W
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Curb & Gutter – SITE-CD
Heavy Equipment
Noise
SBB (Lot 8)
Air Balance - Level 3 – SU-TB
NA
NA
Week of July 8, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB Site (Lot 8)
Toilet Partitions and Accessories - RR-L1
NA
NA
SBB Site (Lot 8)
Install Cafe Equipment – INT-L1
NA
NA
SBB Site (Lot 8)
Install FEC's - INT-L1
NA
NA
SBB Site (Lot 8)
Install Operable Partition Walls – INT-L1
NA
NA
SBB Site (Lot 8)
Install Wall Protection – INT-L1
NA
NA
SBB Site (Lot 8)
Install Marker Boards – INT-L1
NA
NA
SBB Site (Lot 8)
Install AV Devices – INT-L1
NA
NA
SBB Site (Lot 8)
Install Telecom Devices – INT-L1
NA
NA
SBB Site (Lot 8)
Install Electrical Cover Plates – INT-L1
NA
NA
SBB Site (Lot 8)
Install Security Devices – INT-L1
NA
NA
SBB Site (Lot 8)
Install Casework / Millwork (Remaining) – INT-L1
NA
NA
SBB Site (Lot 8)
Install Carpet & Base – INT-L1
NA
NA
SBB Site (Lot 8)
Install AV Devices – INT-AUD
NA
NA
SBB Site (Lot 8)
Install Handrail – INT-AUD
NA
NA
SBB Site (Lot 8)
Install Operable Partition Walls – INT-L2
NA
NA
SBB Site (Lot 8)
Final Coat of Paint – RR-L3
NA
NA
SBB Site (Lot 8)
Install Electrical Finishes – RR-L4
NA
NA
SBB Site (Lot 8)
Measure / Fab / Install Countertops (Remaining) – INT-L4
NA
NA
SBB Site (Lot 8)
Schedule State Elevator Inspection - ELEV
NA
NA
Anderson Park
Install Handrail / Guardrail - SITE
NA
NA
SBB Site (Lot 8)
F/R/P Curb & Gutter – SITE-N
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Stairs – SITE-E
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Hardscape – SITE-E
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Hardscape – SITE-S
Heavy Equipment
Noise
SBB Site (Lot 8)
Fine Grade – SITE-W
Heavy Equipment
Noise
SBB Site (Lot 8)
Backfill Planters – SITE-W
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Stairs – SITE-W
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Hardscape – SITE-W
Heavy Equipment
Noise
SBB Site (Lot 8)
Fine Grade for Asphalt – SITE-CD
Heavy Equipment
Noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
South Campus Drive
South Campus Drive
6/17 – 7/19
South Campus Drive Road Closure
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #84
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB Site (Lot 8)
Install Parapet Cap - RF
NA
NA
SBB Site (Lot 8)
Deck Edge Metal Panels at Windows – EXT-SW
NA
NA
SBB Site (Lot 8)
Install Window Shades – EXT-NE
NA
NA
SBB Site (Lot 8)
Deck Edge Metal Panels at Windows – EXT-NE
NA
NA
SBB Site (Lot 8)
Curtain Wall - Frames & Glass – Manlift Leavout
NA
NA
SBB Site (Lot 8)
Install Window Shades – Manlift Leavout
NA
NA
SBB Site (Lot 8)
Install Tile – RR-L1
NA
NA
SBB Site (Lot 8)
Install Cafe Equipment
NA
NA
SBB Site (Lot 8)
Install Lights and Egress Lighting – INT-L1
NA
NA
SBB Site (Lot 8)
Install HVAC Grills & Diffusers – INT-L1
NA
NA
SBB Site (Lot 8)
Install Casework / Millwork (Wet) – INT-L1
NA
NA
SBB Site (Lot 8)
Final Overhead Inspections and Sign-off for Ceiling Tile – INT-L1
NA
NA
SBB Site (Lot 8)
Prime & Paint Walls – INT-AUD
NA
NA
SBB Site (Lot 8)
Toilet Partitions and Accessories – RR-L2
NA
NA
SBB Site (Lot 8)
Install Casework / Millwork (Remaining) – INT-L2
NA
NA
SBB Site (Lot 8)
Install Carpet & Base – INT-L2
NA
NA
SBB Site (Lot 8)
Install Doors & Hardware – INT-L2
NA
NA
SBB Site (Lot 8)
Install Tile – RR-L3
NA
NA
SBB Site (Lot 8)
Install Plumbing Fixtures – RR-L3
NA
NA
SBB Site (Lot 8)
Install Linoleum Flooring – INT-L3
NA
NA
SBB Site (Lot 8)
Install Doors & Hardware – INT-L3
NA
NA
SBB Site (Lot 8)
Install AV Devices – INT-L3
NA
NA
SBB Site (Lot 8)
Install Tile – RR-L4
NA
NA
SBB Site (Lot 8)
Install Acoustical Ceiling Tile – INT-L4
NA
NA
SBB Site (Lot 8)
Install Casework / Millwork (Wet) – INT-L4
NA
NA
SBB Site (Lot 8)
Install Doors & Hardware – INT-L4
NA
NA
Anderson Park
Install landscaping – SITE-AP
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Site Walls – SITE-N
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Curbs – SITE-E
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Seat Wall – SITE-E
Heavy Equipment
Noise
SBB Site (Lot 8)
Backfill & LID Planter Install – SITE-S
Heavy Equipment
Noise
Week of June 24, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB Site (Lot 8)
Install Permanent Roofing - RF
NA
NA
SBB Site (Lot 8)
Install Countertops – RR-L1
NA
NA
SBB Site (Lot 8)
Install Lights and Egress Lighting – INT-L1
NA
NA
SBB Site (Lot 8)
Install HVAC Grills & Diffusers – INT-L1
NA
NA
SBB Site (Lot 8)
Install Fire Sprinkler Drops / Heads – INT-L1
NA
NA
SBB Site (Lot 8)
Install Fire Alarm Devices – INT-L1
NA
NA
SBB Site (Lot 8)
Wood Ceiling Hangers / Grid Supports – INT-L1
NA
NA
SBB Site (Lot 8)
Install Casework / Millwork (Wet) – INT-L1
NA
NA
SBB Site (Lot 8)
Install Fire Sprinkler Drops / Heads – INT-AUD
NA
NA
SBB Site (Lot 8)
Install Fire Alarm Devices – INT-AUD
NA
NA
SBB Site (Lot 8)
Install Lights and Egress Lighting – INT-AUD
NA
NA
SBB Site (Lot 8)
Install HVAC Grills & Diffusers – INT-AUD
NA
NA
SBB Site (Lot 8)
Final Overhead Inspections and Sign-off for Ceiling Tile – INT-AUD
NA
NA
SBB Site (Lot 8)
Install Tile – RR-L2
NA
NA
SBB Site (Lot 8)
Wood Ceiling Hangers / Grid Supports – INT-L2
NA
NA
SBB Site (Lot 8)
Install Casework / Millwork (Remaining and Wet) – INT-L2
NA
NA
SBB Site (Lot 8)
Install Carpet & Base – INT-L2
NA
NA
SBB Site (Lot 8)
Install AV Devices – INT-L2
NA
NA
SBB Site (Lot 8)
Install Tile – RR-L3
NA
NA
SBB Site (Lot 8)
Install Linoleum Flooring – INT-L3
NA
NA
SBB Site (Lot 8)
Install Lockers – INT-L3
NA
NA
SBB Site (Lot 8)
Install Casework / Millwork (Wet) – INT-L3
NA
NA
SBB Site (Lot 8)
Install Tile – RR-L4
NA
NA
SBB Site (Lot 8)
Install Telecom Devices – INT-L4
NA
NA
SBB Site (Lot 8)
Install Electrical Cover Plates – INT-L4
NA
NA
SBB Site (Lot 8)
Install Security Devices – INT-L4
NA
NA
Anderson Park
Install Interior Glazing – INT-L4
NA
NA
SBB Site (Lot 8)
Install Acoustical Ceiling Tile – INT-L4
NA
NA
SBB Site (Lot 8)
Install Casework / Millwork (Wet) – INT-L4
NA
NA
SBB Site (Lot 8)
Install Site Furnishings – SITE-AP
Heavy Equipment
Noise
Anderson Park
Install Irrigation Sleeves – SITE-N
Heavy Equipment
Noise
SBB Site (Lot 8)
Install Site Lighting Underground – SITE-N
Heavy Equipment
Noise
SBB Site (Lot 8)
Install Site Lighting Underground – SITE-E
Heavy Equipment
Noise
SBB Site (Lot 8)
Install Site Lighting Underground – SITE-S
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Curb & Gutter – SITE-S
Heavy Equipment
Noise
SBB Site (Lot 8)
Rough Grade / Cut Curbs – SITE-W
Heavy Equipment
Noise
SBB Site (Lot 8)
Install Irrigation Sleeves – SITE-W
Heavy Equipment
Noise
SBB Site (Lot 8)
Install Site Lighting Underground – SITE-W
Heavy Equipment
Noise
Week of July 1, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB Site (Lot 8)
Complete Hardscape Finish Site Work at Manlift Leaveout – EXT-ML
NA
NA
SBB Site (Lot 8)
Seal Concrete Floor – INT-L1
NA
NA
SBB Site (Lot 8)
Install Doors & Hardware – INT-L1
NA
NA
SBB Site (Lot 8)
Set Plumbing Finishes – INT-L1
NA
NA
SBB Site (Lot 8)
Final Coat of Paint – INT-L1
NA
NA
SBB Site (Lot 8)
Install Linoleum Flooring – INT-L1
NA
NA
SBB Site (Lot 8)
Install Signage – INT-AUD
NA
NA
SBB Site (Lot 8)
Install FEC's – INT-AUD
NA
NA
SBB Site (Lot 8)
Install Doors & Hardware – INT-AUD
NA
NA
SBB Site (Lot 8)
Install Wall Protection – INT-AUD
NA
NA
SBB Site (Lot 8)
Install Wood Wall Panels – INT-AUD
NA
NA
SBB Site (Lot 8)
Install FF&E – INT-AUD
NA
NA
SBB Site (Lot 8)
Acoustical Wall Panels – INT-AUD
NA
NA
SBB Site (Lot 8)
Final Coat of Paint – RR-L2
NA
NA
SBB Site (Lot 8)
Install FEC's – INT-L2
NA
NA
SBB Site (Lot 8)
Set Plumbing Finishes – INT-L2
NA
NA
SBB Site (Lot 8)
Install Electrical Finishes – RR-L3
NA
NA
SBB Site (Lot 8)
Install FEC's – INT-L3
NA
NA
SBB Site (Lot 8)
Set Plumbing Finishes – INT-L3
NA
NA
SBB Site (Lot 8)
Measure / Fab / Install Countertops (Remaining) – INT-L3
NA
NA
SBB Site (Lot 8)
Install FF&E – INT-L3
NA
NA
SBB Site (Lot 8)
Toilet Partitions and Accessories – RR-L4
NA
NA
SBB Site (Lot 8)
Install FEC's – INT-L4
NA
NA
SBB Site (Lot 8)
Set Plumbing Finishes – INT-L4
NA
NA
SBB Site (Lot 8)
Install Casework / Millwork (Remaining) – INT-L4
NA
NA
SBB Site (Lot 8)
Fine Grade – SITE-E
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Curb & Gutter – SITE-W
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Curb & Gutter – SITE-CD
Heavy Equipment
Noise
SBB (Lot 8)
Air Balance - Level 3 – SU-TB
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
South Campus Drive
South Campus Drive
6/17 – 7/19
South Campus Drive Road Closure
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #83
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install Permanent Roofing - Roof
NA
NA
SBB (Lot 8)
Boardroom Curtain Wall – EXT-SW
NA
NA
SBB (Lot 8)
Install Window Shades – EXT-NE
NA
NA
SBB (Lot 8)
Demo Manlift Pad and Grade
NA
NA
SBB (Lot 8)
Curtain Wall frames and Glass at Manlift Leave out
NA
NA
SBB (Lot 8)
Install Countertops – RR
NA
NA
SBB (Lot 8)
Install Tile – RR
NA
NA
SBB (Lot 8)
Install café Equipment
NA
NA
SBB (Lot 8)
Install Lights and Egress Lighting – INT-L1
NA
NA
SBB (Lot 8)
Install HVAC Grills & Diffusers – INT-L1
NA
NA
SBB (Lot 8)
Install Fire Sprinkler Drops / Heads – INT-L1
NA
NA
SBB (Lot 8)
Install Fire Alarm Devices – INT-L1
NA
NA
SBB (Lot 8)
Wood Ceiling Hangers / Grid Supports – INT-L1
NA
NA
SBB (Lot 8)
Install Casework / Millwork (Wet) – INT-L1
NA
NA
SBB (Lot 8)
Install Acoustical Ceiling Tile – AUD
NA
NA
SBB (Lot 8)
Remove Dancefloor - AUD
NA
NA
SBB (Lot 8)
Install Plumbing Fixtures – RR-L2
NA
NA
SBB (Lot 8)
Install AV Devics – INT-L2
NA
NA
SBB (Lot 8)
Install Casework / Millwork (Remaining) – INT-L2
NA
NA
SBB (Lot 8)
Install Casework / Millwork (Wet) – INT-L2
NA
NA
SBB (Lot 8)
Install Carpet & Base – INT-L2
NA
NA
SBB (Lot 8)
Install Tile – RR-L3
NA
NA
SBB (Lot 8)
Install Linoleum - INT-L3
NA
NA
SBB (Lot 8)
Install Lockers – INT-L3
NA
NA
SBB (Lot 8)
Insall Casework / Millwork (Wet) – INT – L3
NA
NA
SBB (Lot 8)
Install Tile – RR-L4
NA
NA
SBB (Lot 8)
Install Telecom Devices – INT-L4
NA
NA
SBB (Lot 8)
Install Electrical Cover Plates – INT-L4
NA
NA
SBB (Lot 8)
Install Security Devices– INT-L4
NA
NA
SBB (Lot 8)
Install Interior Glazing– INT-L4
NA
NA
SBB (Lot 8)
Install Acoustical Ceiling Tile– INT-L4
NA
NA
SBB (Lot 8)
Install Casework / Millwork (Wet) – INT-L4
NA
NA
Anderson Park
Install Irrigation – SITE-AP
Heavy Equipment
Noise
Anderson Park
Rough Grade / Cut Curbs – SITE-East & South
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Site Walls – SITE-N
Heavy Equipment
Noise
SBB Site (Lot 8)
Install Site Lighting Underground – SITE-E
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Curb & Gutter – SITE-S
Heavy Equipment
Noise
Week of June 17, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install Parapet Cap - RF
NA
NA
SBB (Lot 8)
Deck Edge Metal Panels at Windows – EXT-SW
NA
NA
SBB (Lot 8)
Install Window Shades – EXT-NE
NA
NA
SBB (Lot 8)
Deck Edge Metal Panels at Windows – EXT-NE
NA
NA
SBB (Lot 8)
Curtain Wall - Frames & Glass – Manlift Leavout
NA
NA
SBB (Lot 8)
Install Window Shades – Manlift Leavout
NA
NA
SBB (Lot 8)
Install Tile – RR-L1
NA
NA
SBB (Lot 8)
Install Cafe Equipment
NA
NA
SBB (Lot 8)
Install Lights and Egress Lighting – INT-L1
NA
NA
SBB (Lot 8)
Install HVAC Grills & Diffusers – INT-L1
NA
NA
SBB (Lot 8)
Install Casework / Millwork (Wet) – INT-L1
NA
NA
SBB (Lot 8)
Final Overhead Inspections and Sign-off for Ceiling Tile – INT-L1
NA
NA
SBB (Lot 8)
Prime & Paint Walls – INT-AUD
NA
NA
SBB (Lot 8)
Toilet Partitions and Accessories – RR-L2
NA
NA
SBB (Lot 8)
Install Casework / Millwork (Remaining) – INT-L2
NA
NA
SBB (Lot 8)
Install Carpet & Base – INT-L2
NA
NA
SBB (Lot 8)
Install Doors & Hardware – INT-L2
NA
NA
SBB (Lot 8)
Install Tile – RR-L3
NA
NA
SBB (Lot 8)
Install Plumbing Fixtures – RR-L3
NA
NA
SBB (Lot 8)
Install Linoleum Flooring – INT-L3
NA
NA
SBB (Lot 8)
Install Doors & Hardware – INT-L3
NA
NA
SBB (Lot 8)
Install AV Devices – INT-L3
NA
NA
SBB (Lot 8)
Install Tile – RR-L4
NA
NA
SBB (Lot 8)
Install Acoustical Ceiling Tile – INT-L4
NA
NA
SBB (Lot 8)
Install Casework / Millwork (Wet) – INT-L4
NA
NA
SBB (Lot 8)
Install Doors & Hardware – INT-L4
NA
NA
Anderson Park
Install landscaping – SITE-AP
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Site Walls – SITE-N
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Curbs – SITE-E
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Seat Wall – SITE-E
Heavy Equipment
Noise
SBB Site (Lot 8)
Backfill & LID Planter Install – SITE-S
Heavy Equipment
Noise
Week of June 24, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install Permanent Roofing - RF
NA
NA
SBB (Lot 8)
Install Countertops – RR-L1
NA
NA
SBB (Lot 8)
Install Lights and Egress Lighting – INT-L1
NA
NA
SBB (Lot 8)
Install HVAC Grills & Diffusers – INT-L1
NA
NA
SBB (Lot 8)
Install Fire Sprinkler Drops / Heads – INT-L1
NA
NA
SBB (Lot 8)
Install Fire Alarm Devices – INT-L1
NA
NA
SBB (Lot 8)
Wood Ceiling Hangers / Grid Supports – INT-L1
NA
NA
SBB (Lot 8)
Install Casework / Millwork (Wet) – INT-L1
NA
NA
SBB (Lot 8)
Install Fire Sprinkler Drops / Heads – INT-AUD
NA
NA
SBB (Lot 8)
Install Fire Alarm Devices – INT-AUD
NA
NA
SBB (Lot 8)
Install Lights and Egress Lighting – INT-AUD
NA
NA
SBB (Lot 8)
Install HVAC Grills & Diffusers – INT-AUD
NA
NA
SBB (Lot 8)
Final Overhead Inspections and Sign-off for Ceiling Tile – INT-AUD
NA
NA
SBB (Lot 8)
Install Tile – RR-L2
NA
NA
SBB (Lot 8)
Wood Ceiling Hangers / Grid Supports – INT-L2
NA
NA
SBB (Lot 8)
Install Casework / Millwork (Remaining and Wet) – INT-L2
NA
NA
SBB (Lot 8)
Install Carpet & Base – INT-L2
NA
NA
SBB (Lot 8)
Install AV Devices – INT-L2
NA
NA
SBB (Lot 8)
Install Tile – RR-L3
NA
NA
SBB (Lot 8)
Install Linoleum Flooring – INT-L3
NA
NA
SBB (Lot 8)
Install Lockers – INT-L3
NA
NA
SBB (Lot 8)
Install Casework / Millwork (Wet) – INT-L3
NA
NA
SBB (Lot 8)
Install Tile – RR-L4
NA
NA
SBB (Lot 8)
Install Telecom Devices – INT-L4
NA
NA
SBB (Lot 8)
Install Electrical Cover Plates – INT-L4
NA
NA
SBB (Lot 8)
Install Security Devices – INT-L4
NA
NA
Anderson Park
Install Interior Glazing – INT-L4
NA
NA
SBB Site (Lot 8)
Install Acoustical Ceiling Tile – INT-L4
NA
NA
SBB Site (Lot 8)
Install Casework / Millwork (Wet) – INT-L4
NA
NA
SBB Site (Lot 8)
Install Site Furnishings – SITE-AP
Heavy Equipment
Noise
Anderson Park
Install Irrigation Sleeves – SITE-N
Heavy Equipment
Noise
SBB Site (Lot 8)
Install Site Lighting Underground – SITE-N
Heavy Equipment
Noise
SBB Site (Lot 8)
Install Site Lighting Underground – SITE-E
Heavy Equipment
Noise
SBB Site (Lot 8)
Install Site Lighting Underground – SITE-S
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Curb & Gutter – SITE-S
Heavy Equipment
Noise
SBB Site (Lot 8)
Rough Grade / Cut Curbs – SITE-W
Heavy Equipment
Noise
SBB Site (Lot 8)
Install Irrigation Sleeves – SITE-W
Heavy Equipment
Noise
SBB Site (Lot 8)
Install Site Lighting Underground – SITE-W
Heavy Equipment
Noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
South Campus Drive
South Campus Drive
6/17 – 7/19
South Campus Drive Road Closure
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #82
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install Permanent Roofing – Low Roof
NA
NA
SBB (Lot 8)
Curtain Wall – Frames and Glass
NA
NA
SBB (Lot 8)
Precast Panels – EXT-L1
NA
NA
SBB (Lot 8)
Set and Grout Thin Brick – Manlift Leavout
NA
NA
SBB (Lot 8)
Caulking – Manlift Leavout
NA
NA
SBB (Lot 8)
Remove Scaffold – Manlift Leavout
NA
NA
SBB (Lot 8)
Seal Concrete Floor – Café
NA
NA
SBB (Lot 8)
Install Lights and Egress Lighting – INT-L1
NA
NA
SBB (Lot 8)
Install HVAC Grills & Diffusers – INT-L1
NA
NA
SBB (Lot 8)
Final Overhead Inspections and Sign-off for Ceiling Tile – INT-AUD
NA
NA
SBB (Lot 8)
Install Tile – RR-L2
NA
NA
SBB (Lot 8)
Install Countertops – RR-L3
NA
NA
SBB (Lot 8)
Install Interior Glazing – INT-L3
NA
NA
SBB (Lot 8)
Install Acoustical Ceiling Tile – INT-L3
NA
NA
SBB (Lot 8)
Prime & 1st Coat of Paint, Walls & Ceilings – RR-L4
NA
NA
SBB (Lot 8)
Install Countertops – RR-L4
NA
NA
Anderson Park
Install Site Furnishings – SITE-AP
Heavy Equipment
Noise
Anderson Park
Install Irrigation – SITE-AP
Heavy Equipment
Noise
SBB (Lot 8)
Rough Grade / Cut Curbs – SITE-East & South
Heavy Equipment
Noise
Week of June 10, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install Permanent Roofing - Roof
NA
NA
SBB (Lot 8)
Boardroom Curtain Wall – EXT-SW
NA
NA
SBB (Lot 8)
Install Window Shades – EXT-NE
NA
NA
SBB (Lot 8)
Demo Manlift Pad and Grade
NA
NA
SBB (Lot 8)
Curtain Wall frames and Glass at Manlift Leave out
NA
NA
SBB (Lot 8)
Install Countertops – RR
NA
NA
SBB (Lot 8)
Install Tile – RR
NA
NA
SBB (Lot 8)
Install café Equipment
NA
NA
SBB (Lot 8)
Install Lights and Egress Lighting – INT-L1
NA
NA
SBB (Lot 8)
Install HVAC Grills & Diffusers – INT-L1
NA
NA
SBB (Lot 8)
Install Fire Sprinkler Drops / Heads – INT-L1
NA
NA
SBB (Lot 8)
Install Fire Alarm Devices – INT-L1
NA
NA
SBB (Lot 8)
Wood Ceiling Hangers / Grid Supports – INT-L1
NA
NA
SBB (Lot 8)
Install Casework / Millwork (Wet) – INT-L1
NA
NA
SBB (Lot 8)
Install Acoustical Ceiling Tile – AUD
NA
NA
SBB (Lot 8)
Remove Dancefloor - AUD
NA
NA
SBB (Lot 8)
Install Plumbing Fixtures – RR-L2
NA
NA
SBB (Lot 8)
Install AV Devics – INT-L2
NA
NA
SBB (Lot 8)
Install Casework / Millwork (Remaining) – INT-L2
NA
NA
SBB (Lot 8)
Install Casework / Millwork (Wet) – INT-L2
NA
NA
SBB (Lot 8)
Install Carpet & Base – INT-L2
NA
NA
SBB (Lot 8)
Install Tile – RR-L3
NA
NA
SBB (Lot 8)
Install Linoleum - INT-L3
NA
NA
SBB (Lot 8)
Install Lockers – INT-L3
NA
NA
SBB (Lot 8)
Insall Casework / Millwork (Wet) – INT – L3
NA
NA
SBB (Lot 8)
Install Tile – RR-L4
NA
NA
SBB (Lot 8)
Install Telecom Devices – INT-L4
NA
NA
SBB (Lot 8)
Install Electrical Cover Plates – INT-L4
NA
NA
SBB (Lot 8)
Install Security Devices– INT-L4
NA
NA
SBB (Lot 8)
Install Interior Glazing– INT-L4
NA
NA
SBB (Lot 8)
Install Acoustical Ceiling Tile– INT-L4
NA
NA
SBB (Lot 8)
Install Casework / Millwork (Wet) – INT-L4
NA
NA
Anderson Park
Install Irrigation – SITE-AP
Heavy Equipment
Noise
Anderson Park
Rough Grade / Cut Curbs – SITE-East & South
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Site Walls – SITE-N
Heavy Equipment
Noise
SBB Site (Lot 8)
Install Site Lighting Underground – SITE-E
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Curb & Gutter – SITE-S
Heavy Equipment
Noise
Week of June 17, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install Parapet Cap - RF
NA
NA
SBB (Lot 8)
Deck Edge Metal Panels at Windows – EXT-SW
NA
NA
SBB (Lot 8)
Install Window Shades – EXT-NE
NA
NA
SBB (Lot 8)
Deck Edge Metal Panels at Windows – EXT-NE
NA
NA
SBB (Lot 8)
Curtain Wall - Frames & Glass – Manlift Leavout
NA
NA
SBB (Lot 8)
Install Window Shades – Manlift Leavout
NA
NA
SBB (Lot 8)
Install Tile – RR-L1
NA
NA
SBB (Lot 8)
Install Cafe Equipment
NA
NA
SBB (Lot 8)
Install Lights and Egress Lighting – INT-L1
NA
NA
SBB (Lot 8)
Install HVAC Grills & Diffusers – INT-L1
NA
NA
SBB (Lot 8)
Install Casework / Millwork (Wet) – INT-L1
NA
NA
SBB (Lot 8)
Final Overhead Inspections and Sign-off for Ceiling Tile – INT-L1
NA
NA
SBB (Lot 8)
Prime & Paint Walls – INT-AUD
NA
NA
SBB (Lot 8)
Toilet Partitions and Accessories – RR-L2
NA
NA
SBB (Lot 8)
Install Casework / Millwork (Remaining) – INT-L2
NA
NA
SBB (Lot 8)
Install Carpet & Base – INT-L2
NA
NA
SBB (Lot 8)
Install Doors & Hardware – INT-L2
NA
NA
SBB (Lot 8)
Install Tile – RR-L3
NA
NA
SBB (Lot 8)
Install Plumbing Fixtures – RR-L3
NA
NA
SBB (Lot 8)
Install Linoleum Flooring – INT-L3
NA
NA
SBB (Lot 8)
Install Doors & Hardware – INT-L3
NA
NA
SBB (Lot 8)
Install AV Devices – INT-L3
NA
NA
SBB (Lot 8)
Install Tile – RR-L4
NA
NA
SBB (Lot 8)
Install Acoustical Ceiling Tile – INT-L4
NA
NA
SBB (Lot 8)
Install Casework / Millwork (Wet) – INT-L4
NA
NA
SBB (Lot 8)
Install Doors & Hardware – INT-L4
NA
NA
Anderson Park
Install landscaping – SITE-AP
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Site Walls – SITE-N
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Curbs – SITE-E
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Seat Wall – SITE-E
Heavy Equipment
Noise
SBB Site (Lot 8)
Backfill & LID Planter Install – SITE-S
Heavy Equipment
Noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
South Campus Drive
South Campus Drive
6/17 – 7/19
South Campus Drive Road Closure
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #81
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Precast Panels – EXT-L1
NA
NA
SBB (Lot 8)
Curtain Wall - Frames & Glass CW25-26, 28-31 (L3/L4) – EXT-NE
NA
NA
SBB (Lot 8)
Set & Grout Thin Brick – Manlift Leaveout
NA
NA
SBB (Lot 8)
Prime & 1st Coat of Paint, Walls & Ceilings – RR-L1
NA
NA
SBB (Lot 8)
Install Acoustical Grid – INT-L1
NA
NA
SBB (Lot 8)
Prime & Paint Hardlids at Fixture Leaveout
NA
NA
SBB (Lot 8)
Install Fire Sprinkler Drops / Heads
NA
NA
SBB (Lot 8)
Install Fire Alarm Devices
NA
NA
SBB (Lot 8)
Install Lights and Egress Lighting
NA
NA
SBB (Lot 8)
Install HVAC Grills & Diffusers
NA
NA
SBB (Lot 8)
Install Countertops – RR-L2
NA
NA
SBB (Lot 8)
Install Tile – RR-L2
NA
NA
SBB (Lot 8)
Prime & 1st Coat of Paint, Walls & Ceilings – RR-L3
NA
NA
SBB (Lot 8)
Install Telecom Devices – INT-L3
NA
NA
SBB (Lot 8)
Install Electrical Cover Plates – INT-L3
NA
NA
SBB (Lot 8)
Install Security Devices – INT-L3
NA
NA
SBB (Lot 8)
Install Interior Glazing – INT-L3
NA
NA
SBB (Lot 8)
Install Acoustical Ceiling Tile – INT-L3
NA
NA
SBB (Lot 8)
Prime & Paint Hardlids at Fixture Leaveout – INT-L4
NA
NA
SBB (Lot 8)
Prime & 1st Coat of Paint, Walls & Ceilings – RR-L4
NA
NA
Anderson Park
Field Measure and Procure Handrail / Guardrail – SITE-AP
NA
NA
Anderson Park
Fine Grade Hardscape / Stairs – SITE-AP
Heavy Equipment
Noise
Week of June 3, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install Permanent Roofing – Low Roof
NA
NA
SBB (Lot 8)
Curtain Wall – Frames and Glass
NA
NA
SBB (Lot 8)
Precast Panels – EXT-L1
NA
NA
SBB (Lot 8)
Set and Grout Thin Brick – Manlift Leavout
NA
NA
SBB (Lot 8)
Caulking – Manlift Leavout
NA
NA
SBB (Lot 8)
Remove Scaffold – Manlift Leavout
NA
NA
SBB (Lot 8)
Seal Concrete Floor – Café
NA
NA
SBB (Lot 8)
Install Lights and Egress Lighting – INT-L1
NA
NA
SBB (Lot 8)
Install HVAC Grills & Diffusers – INT-L1
NA
NA
SBB (Lot 8)
Final Overhead Inspections and Sign-off for Ceiling Tile – INT-AUD
NA
NA
SBB (Lot 8)
Install Tile – RR-L2
NA
NA
SBB (Lot 8)
Install Countertops – RR-L3
NA
NA
SBB (Lot 8)
Install Interior Glazing – INT-L3
NA
NA
SBB (Lot 8)
Install Acoustical Ceiling Tile – INT-L3
NA
NA
SBB (Lot 8)
Prime & 1st Coat of Paint, Walls & Ceilings – RR-L4
NA
NA
SBB (Lot 8)
Install Countertops – RR-L4
NA
NA
Anderson Park
Install Site Furnishings – SITE-AP
Heavy Equipment
Noise
Anderson Park
Install Irrigation – SITE-AP
Heavy Equipment
Noise
SBB (Lot 8)
Rough Grade / Cut Curbs – SITE-East & South
Heavy Equipment
Noise
Week of June 10, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install Permanent Roofing - Roof
NA
NA
SBB (Lot 8)
Boardroom Curtain Wall – EXT-SW
NA
NA
SBB (Lot 8)
Install Window Shades – EXT-NE
NA
NA
SBB (Lot 8)
Demo Manlift Pad and Grade
NA
NA
SBB (Lot 8)
Curtain Wall frames and Glass at Manlift Leave out
NA
NA
SBB (Lot 8)
Install Countertops – RR
NA
NA
SBB (Lot 8)
Install Tile – RR
NA
NA
SBB (Lot 8)
Install café Equipment
NA
NA
SBB (Lot 8)
Install Lights and Egress Lighting – INT-L1
NA
NA
SBB (Lot 8)
Install HVAC Grills & Diffusers – INT-L1
NA
NA
SBB (Lot 8)
Install Fire Sprinkler Drops / Heads – INT-L1
NA
NA
SBB (Lot 8)
Install Fire Alarm Devices – INT-L1
NA
NA
SBB (Lot 8)
Wood Ceiling Hangers / Grid Supports – INT-L1
NA
NA
SBB (Lot 8)
Install Casework / Millwork (Wet) – INT-L1
NA
NA
SBB (Lot 8)
Install Acoustical Ceiling Tile – AUD
NA
NA
SBB (Lot 8)
Remove Dancefloor - AUD
NA
NA
SBB (Lot 8)
Install Plumbing Fixtures – RR-L2
NA
NA
SBB (Lot 8)
Install AV Devics – INT-L2
NA
NA
SBB (Lot 8)
Install Casework / Millwork (Remaining) – INT-L2
NA
NA
SBB (Lot 8)
Install Casework / Millwork (Wet) – INT-L2
NA
NA
SBB (Lot 8)
Install Carpet & Base – INT-L2
NA
NA
SBB (Lot 8)
Install Tile – RR-L3
NA
NA
SBB (Lot 8)
Install Linoleum - INT-L3
NA
NA
SBB (Lot 8)
Install Lockers – INT-L3
NA
NA
SBB (Lot 8)
Insall Casework / Millwork (Wet) – INT – L3
NA
NA
SBB (Lot 8)
Install Tile – RR-L4
NA
NA
SBB (Lot 8)
Install Telecom Devices – INT-L4
NA
NA
SBB (Lot 8)
Install Electrical Cover Plates – INT-L4
NA
NA
SBB (Lot 8)
Install Security Devices– INT-L4
NA
NA
SBB (Lot 8)
Install Interior Glazing– INT-L4
NA
NA
SBB (Lot 8)
Install Acoustical Ceiling Tile– INT-L4
NA
NA
SBB (Lot 8)
Install Casework / Millwork (Wet) – INT-L4
NA
NA
Anderson Park
Install Irrigation – SITE-AP
Heavy Equipment
Noise
Anderson Park
Rough Grade / Cut Curbs – SITE-East & South
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Site Walls – SITE-N
Heavy Equipment
Noise
SBB Site (Lot 8)
Install Site Lighting Underground – SITE-E
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Curb & Gutter – SITE-S
Heavy Equipment
Noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #80
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install Parapet Cap - Roof
NA
NA
SBB (Lot 8)
Finish Coat Plaster – EXT-L1
NA
NA
SBB (Lot 8)
Remove Scaffold – EXT-L1
NA
NA
SBB (Lot 8)
Remove Scaffold – EXT-NE
NA
NA
SBB (Lot 8)
Set & Grout Thin Brick – Manlift Leaveout
NA
NA
SBB (Lot 8)
Prime & 1st Coat of Paint, Walls, Hard lids & Exposed Ceilings – INT-L1
NA
NA
SBB (Lot 8)
Install Acoustical Grid – INT-AUD
NA
NA
SBB (Lot 8)
Wood Ceiling Hangers / Grid Supports – INT-L2
NA
NA
SBB (Lot 8)
Install Security Devices – INT-L2
NA
NA
SBB (Lot 8)
Prime & Paint Hardlids at Fixture Leaveout – INT-L3
NA
NA
SBB (Lot 8)
Final Overhead Inspections and Sign-off for Ceiling Tile – INT-L3
NA
NA
SBB (Lot 8)
Tape Walls & Ceilings – RR-L4
NA
NA
SBB (Lot 8)
Install Lights and Egress Lighting – INT-L4
NA
NA
Anderson Park
F/R/P Hardscape – SITE-AP
Heavy Equipment
Noise
Anderson Park
Install Irrigation Sleeves – SITE-AP
Heavy Equipment
Noise
Anderson Park
Install Site Lighting Underground – SITE-AP
Heavy Equipment
Noise
Week of May 27, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Precast Panels – EXT-L1
NA
NA
SBB (Lot 8)
Curtain Wall - Frames & Glass CW25-26, 28-31 (L3/L4) – EXT-NE
NA
NA
SBB (Lot 8)
Set & Grout Thin Brick – Manlift Leaveout
NA
NA
SBB (Lot 8)
Prime & 1st Coat of Paint, Walls & Ceilings – RR-L1
NA
NA
SBB (Lot 8)
Install Acoustical Grid – INT-L1
NA
NA
SBB (Lot 8)
Prime & Paint Hardlids at Fixture Leaveout
NA
NA
SBB (Lot 8)
Install Fire Sprinkler Drops / Heads
NA
NA
SBB (Lot 8)
Install Fire Alarm Devices
NA
NA
SBB (Lot 8)
Install Lights and Egress Lighting
NA
NA
SBB (Lot 8)
Install HVAC Grills & Diffusers
NA
NA
SBB (Lot 8)
Install Countertops – RR-L2
NA
NA
SBB (Lot 8)
Install Tile – RR-L2
NA
NA
SBB (Lot 8)
Prime & 1st Coat of Paint, Walls & Ceilings – RR-L3
NA
NA
SBB (Lot 8)
Install Telecom Devices – INT-L3
NA
NA
SBB (Lot 8)
Install Electrical Cover Plates – INT-L3
NA
NA
SBB (Lot 8)
Install Security Devices – INT-L3
NA
NA
SBB (Lot 8)
Install Interior Glazing – INT-L3
NA
NA
SBB (Lot 8)
Install Acoustical Ceiling Tile – INT-L3
NA
NA
SBB (Lot 8)
Prime & Paint Hardlids at Fixture Leaveout – INT-L4
NA
NA
SBB (Lot 8)
Prime & 1st Coat of Paint, Walls & Ceilings – RR-L4
NA
NA
Anderson Park
Field Measure and Procure Handrail / Guardrail – SITE-AP
NA
NA
Anderson Park
Fine Grade Hardscape / Stairs – SITE-AP
Heavy Equipment
Noise
Week of June 3, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install Permanent Roofing – Low Roof
NA
NA
SBB (Lot 8)
Curtain Wall – Frames and Glass
NA
NA
SBB (Lot 8)
Precast Panels – EXT-L1
NA
NA
SBB (Lot 8)
Set and Grout Thin Brick – Manlift Leavout
NA
NA
SBB (Lot 8)
Caulking – Manlift Leavout
NA
NA
SBB (Lot 8)
Remove Scaffold – Manlift Leavout
NA
NA
SBB (Lot 8)
Seal Concrete Floor – Café
NA
NA
SBB (Lot 8)
Install Lights and Egress Lighting – INT-L1
NA
NA
SBB (Lot 8)
Install HVAC Grills & Diffusers – INT-L1
NA
NA
SBB (Lot 8)
Final Overhead Inspections and Sign-off for Ceiling Tile – INT-AUD
NA
NA
SBB (Lot 8)
Install Tile – RR-L2
NA
NA
SBB (Lot 8)
Install Countertops – RR-L3
NA
NA
SBB (Lot 8)
Install Interior Glazing – INT-L3
NA
NA
SBB (Lot 8)
Install Acoustical Ceiling Tile – INT-L3
NA
NA
SBB (Lot 8)
Prime & 1st Coat of Paint, Walls & Ceilings – RR-L4
NA
NA
SBB (Lot 8)
Install Countertops – RR-L4
NA
NA
Anderson Park
Install Site Furnishings – SITE-AP
Heavy Equipment
Noise
Anderson Park
Install Irrigation – SITE-AP
Heavy Equipment
Noise
SBB (Lot 8)
Rough Grade / Cut Curbs – SITE-East & South
Heavy Equipment
Noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #79
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install Roofing System - North of E Line
NA
NA
SBB (Lot 8)
Metal Panels at Stairs - EXT-SW
NA
NA
SBB (Lot 8)
Remove Scaffold - EXT-SW
NA
NA
SBB (Lot 8)
Curtain Wall - Frames & Glass CW8-11, 12-15, 1-3 (L2/L1) - EXT-SW
NA
NA
SBB (Lot 8)
Scratch Coat Plaster – EXT-L1
NA
NA
SBB (Lot 8)
Brown Coat Plaster – EXT-L1
NA
NA
SBB (Lot 8)
Set & Grout Thin Brick – EXT-NE
NA
NA
SBB (Lot 8)
Caulking – EXT-NE
NA
NA
SBB (Lot 8)
Metal Panels at Stairs – EXT-NE
NA
NA
SBB (Lot 8)
Cement Board – Manlift Leavout
NA
NA
SBB (Lot 8)
Secondary Air Barrier – Manlift Leavout
NA
NA
SBB (Lot 8)
Punched Openings – Manlift Leavout
NA
NA
SBB (Lot 8)
Tape Walls Soffits & Hard lids – INT-L1
NA
NA
SBB (Lot 8)
Tape Walls & Ceilings – RR-L1
NA
NA
SBB (Lot 8)
Hang, Tape & Finish Drywall at Hardlid Fixture Leaveouts – INT-AUD
NA
NA
SBB (Lot 8)
Prime & Paint Hardlids at Fixture Leaveout – INT-L2
NA
NA
SBB (Lot 8)
Tape Walls & Ceilings – RR-L2
NA
NA
SBB (Lot 8)
Prime & 1st Coat of Paint, Walls & Ceilings – RR-L2
NA
NA
SBB (Lot 8)
Erect Dancefloor – INT-L2
NA
NA
SBB (Lot 8)
Overhead MEPF – INT-L2
NA
NA
SBB (Lot 8)
Final Overhead Inspections and Sign-off for Ceiling Tile – INT-L2
NA
NA
SBB (Lot 8)
Install Telecom Devices – INT-L2
NA
NA
SBB (Lot 8)
Install Electrical Cover Plates – INT-L2
NA
NA
SBB (Lot 8)
Install Interior Glazing – INT-L2
NA
NA
SBB (Lot 8)
Install Acoustical Ceiling Tile – INT-L2
NA
NA
SBB (Lot 8)
Hang, Tape & Finish Drywall at Hardlid Fixture Leaveouts – INT-L3
NA
NA
SBB (Lot 8)
Hang Drywall & Inspect – RR-L3
NA
NA
SBB (Lot 8)
Tape Walls & Ceilings – RR-L3
NA
NA
SBB (Lot 8)
Install Lights and Egress Lighting– INT-L3
NA
NA
SBB (Lot 8)
Install HVAC Grills & Diffusers– INT-L3
NA
NA
SBB (Lot 8)
Install Fire Sprinkler Drops / Heads– INT-L3
NA
NA
SBB (Lot 8)
Install Fire Alarm Devices – INT-L3
NA
NA
SBB (Lot 8)
Pull Electrical– INT-L4
NA
NA
SBB (Lot 8)
Hang, Tape & Finish Drywall at Hardlid Fixture Leaveouts– INT-L4
NA
NA
SBB (Lot 8)
Hang Drywall & Inspect – RR-L4
NA
NA
SBB (Lot 8)
Prime & 1st Coat of Paint, Walls, Hard lids & Exposed Ceilings – INT-L4
NA
NA
SBB (Lot 8)
Install Acoustical Grid – INT-L4
NA
NA
Anderson Park
Fine Grade – SITE-AP
Heavy Equipment
Noise
Anderson Park
Rough Grade / Cut Curbs – SITE-N
Heavy Equipment
Noise
Week of May 20, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install Parapet Cap - Roof
NA
NA
SBB (Lot 8)
Finish Coat Plaster – EXT-L1
NA
NA
SBB (Lot 8)
Remove Scaffold – EXT-L1
NA
NA
SBB (Lot 8)
Remove Scaffold – EXT-NE
NA
NA
SBB (Lot 8)
Set & Grout Thin Brick – Manlift Leaveout
NA
NA
SBB (Lot 8)
Prime & 1st Coat of Paint, Walls, Hard lids & Exposed Ceilings – INT-L1
NA
NA
SBB (Lot 8)
Install Acoustical Grid – INT-AUD
NA
NA
SBB (Lot 8)
Wood Ceiling Hangers / Grid Supports – INT-L2
NA
NA
SBB (Lot 8)
Install Security Devices – INT-L2
NA
NA
SBB (Lot 8)
Prime & Paint Hardlids at Fixture Leaveout – INT-L3
NA
NA
SBB (Lot 8)
Final Overhead Inspections and Sign-off for Ceiling Tile – INT-L3
NA
NA
SBB (Lot 8)
Tape Walls & Ceilings – RR-L4
NA
NA
SBB (Lot 8)
Install Lights and Egress Lighting – INT-L4
NA
NA
Anderson Park
F/R/P Hardscape – SITE-AP
Heavy Equipment
Noise
Anderson Park
Install Irrigation Sleeves – SITE-AP
Heavy Equipment
Noise
Anderson Park
Install Site Lighting Underground – SITE-AP
Heavy Equipment
Noise
Week of May 27, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Precast Panels – EXT-L1
NA
NA
SBB (Lot 8)
Curtain Wall - Frames & Glass CW25-26, 28-31 (L3/L4) – EXT-NE
NA
NA
SBB (Lot 8)
Set & Grout Thin Brick – Manlift Leaveout
NA
NA
SBB (Lot 8)
Prime & 1st Coat of Paint, Walls & Ceilings – RR-L1
NA
NA
SBB (Lot 8)
Install Acoustical Grid – INT-L1
NA
NA
SBB (Lot 8)
Prime & Paint Hardlids at Fixture Leaveout
NA
NA
SBB (Lot 8)
Install Fire Sprinkler Drops / Heads
NA
NA
SBB (Lot 8)
Install Fire Alarm Devices
NA
NA
SBB (Lot 8)
Install Lights and Egress Lighting
NA
NA
SBB (Lot 8)
Install HVAC Grills & Diffusers
NA
NA
SBB (Lot 8)
Install Countertops – RR-L2
NA
NA
SBB (Lot 8)
Install Tile – RR-L2
NA
NA
SBB (Lot 8)
Prime & 1st Coat of Paint, Walls & Ceilings – RR-L3
NA
NA
SBB (Lot 8)
Install Telecom Devices – INT-L3
NA
NA
SBB (Lot 8)
Install Electrical Cover Plates – INT-L3
NA
NA
SBB (Lot 8)
Install Security Devices – INT-L3
NA
NA
SBB (Lot 8)
Install Interior Glazing – INT-L3
NA
NA
SBB (Lot 8)
Install Acoustical Ceiling Tile – INT-L3
NA
NA
SBB (Lot 8)
Prime & Paint Hardlids at Fixture Leaveout – INT-L4
NA
NA
SBB (Lot 8)
Prime & 1st Coat of Paint, Walls & Ceilings – RR-L4
NA
NA
Anderson Park
Field Measure and Procure Handrail / Guardrail – SITE-AP
Heavy Equipment
Noise
Anderson Park
Fine Grade Hardscape / Stairs – SITE-AP
Heavy Equipment
Noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #78
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Set & Grout Thin Brick – EXT-SW
NA
NA
SBB (Lot 8)
Curtain Wall - Frames & Glass – EXT-SW
NA
NA
SBB (Lot 8)
Lath & Trims – EXT-L1
NA
NA
SBB (Lot 8)
Curtain Wall - Frames & Glass – EXT-NE
NA
NA
SBB (Lot 8)
Set & Grout Thin Brick – EXT-NE
NA
NA
SBB (Lot 8)
Install Communications Racks/Equipment – ELEC-L1
NA
NA
SBB (Lot 8)
Tape Walls Soffits & Hard lids – INT-L1
NA
NA
SBB (Lot 8)
Hang Drywall & Inspect – RR-L1
NA
NA
SBB (Lot 8)
Tape Walls – INT-AUD
NA
NA
SBB (Lot 8)
Install Lights and Egress Lighting – INT-L2
NA
NA
SBB (Lot 8)
Install HVAC Grills & Diffusers – INT-L2
NA
NA
SBB (Lot 8)
Prime & Paint Hardlids at Fixture Leave out – INT-L3
NA
NA
SBB (Lot 8)
Hang Drywall & Inspect – RR-L3
NA
NA
SBB (Lot 8)
Tape Walls Soffits & Hard lids – INT-L4
NA
NA
SBB (Lot 8)
Schedule State Elevator Inspection – ELEV
NA
NA
Anderson Park
F/R/P Site Walls - Loading Dock – SITE AP
Heavy Equipment
Noise
Week of May 13, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Caulking – EXT-SW
NA
NA
SBB (Lot 8)
Curtain Wall - Frames & Glass – EXT-SW
NA
NA
SBB (Lot 8)
Set & Grout Thin Brick – EXT-NE
NA
NA
SBB (Lot 8)
Tape Walls & Ceilings – RR-L1
NA
NA
SBB (Lot 8)
Prime & Paint Hardlids at Fixture Leaveout – INT-L2
NA
NA
SBB (Lot 8)
Install Interior Glazing – INT-L2
NA
NA
SBB (Lot 8)
Prime & Paint Hardlids at Fixture Leaveout – INT-L3
NA
NA
SBB (Lot 8)
Hang Drywall & Inspect – RR-L3
NA
NA
SBB (Lot 8)
Install Lights and Egress Lighting – INT-L3
NA
NA
SBB (Lot 8)
Install HVAC Grills & Diffusers – INT-L3
NA
NA
SBB (Lot 8)
Install Fire Sprinkler Drops / Heads – INT-L3
NA
NA
SBB (Lot 8)
Install Fire Alarm Devices – INT-L3
NA
NA
SBB (Lot 8)
Prime & 1st Coat of Paint, Walls, Hard lids & Exposed Ceilings– INT-L4
NA
NA
Anderson Park
F/R/P Hardscape
Heavy Equipment
Noise
Anderson Park
F/R/P Site Walls - Amphitheater
Heavy Equipment
Noise
Week of May 20, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Caulking – EXT-SW
NA
NA
SBB (Lot 8)
Curtain Wall - Frames & Glass – EXT-SW
NA
NA
SBB (Lot 8)
Set & Grout Thin Brick – EXT-NE
NA
NA
SBB (Lot 8)
Install Communications Racks/Equipment – ELEC-L1
NA
NA
SBB (Lot 8)
Install Interior Glazing – INT-L2
NA
NA
SBB (Lot 8)
Install Lights and Egress Lighting – INT-L3
NA
NA
SBB (Lot 8)
Install HVAC Grills & Diffusers – INT-L3
NA
NA
SBB (Lot 8)
Schedule State Elevator Inspection - ELEV
NA
NA
Anderson Park
F/R/P Hardscape
Heavy Equipment
Noise
Anderson Park
F/R/P Site Walls - Amphitheater
Heavy Equipment
Noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #77
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Caulking – EXT-L1
NA
NA
SBB (Lot 8)
Remove Scaffold – EXT-L1
NA
NA
SBB (Lot 8)
Metal Panels – North of F Line EXT-NE
NA
NA
SBB (Lot 8)
Caulking – EXT-SW
NA
NA
SBB (Lot 8)
Exterior Framing – Manlift Layout
NA
NA
SBB (Lot 8)
Rigid Insulation and Air Water Barrier – Manlift Layout
NA
NA
SBB (Lot 8)
Tape Walls Soffits & Hard lids – INT-L1
NA
NA
SBB (Lot 8)
Hang Drywall & Inspect – RR-L1
NA
NA
SBB (Lot 8)
Tape Walls & Ceilings – RR-L1
NA
NA
SBB (Lot 8)
Install Roll Up Door - CAFE
NA
NA
SBB (Lot 8)
Prime & 1st Coat of Paint, Walls, Hard lids & Exposed Ceilings – INT-L1
NA
NA
SBB (Lot 8)
Install Acoustical Grid – INT-AUD
NA
NA
SBB (Lot 8)
Install Fire Sprinkler Drops / Heads – INT-AUD
NA
NA
SBB (Lot 8)
Install Fire Alarm Devices – INT-AUD
NA
NA
SBB (Lot 8)
Install Lights and Egress Lighting – INT-AUD
NA
NA
SBB (Lot 8)
Install HVAC Grills & Diffusers – INT-AUD
NA
NA
SBB (Lot 8)
Hang Drywall & Inspect – RR-L2
NA
NA
SBB (Lot 8)
Tape Walls & Ceilings – RR-L2
NA
NA
SBB (Lot 8)
Install HVAC Grills & Diffusers – INT-L2
NA
NA
SBB (Lot 8)
Install Fire Sprinkler Drops / Heads – INT-L2
NA
NA
SBB (Lot 8)
Install Fire Alarm Devices – INT-L2
NA
NA
SBB (Lot 8)
Install Lights and Egress Lighting – INT-L2
NA
NA
SBB (Lot 8)
Tape Walls & Ceilings – RR-L3
NA
NA
SBB (Lot 8)
Install Acoustical Grid – INT-L3
NA
NA
SBB (Lot 8)
Install Cable Tray – INT-L4
NA
NA
SBB (Lot 8)
Tape Walls Soffits & Hard lids – INT-L4
NA
NA
SBB (Lot 8)
Pull Low Voltage Cable – INT-L4
NA
NA
SBB (Lot 8)
Tap Walls and Ceilings – RR-L4
NA
NA
Anderson Park
F/R/P Hardscape – Site-AP
Heavy Equipment
Noise
SBB (Lot 8)
Install Irrigation Sleeves – Site-N
NA
NA
SBB (Lot 8)
Install Site Lighting Underground – Site-N
NA
NA
SBB (Lot 8)
Tie-in Chilled Water to Campus Loop
NA
NA
SBB (Lot 8)
Startup/Test Refrigerant Alarm System
NA
NA
Week of May 6, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Set & Grout Thin Brick – EXT-SW
NA
NA
SBB (Lot 8)
Curtain Wall - Frames & Glass – EXT-SW
NA
NA
SBB (Lot 8)
Lath & Trims – EXT-L1
NA
NA
SBB (Lot 8)
Curtain Wall - Frames & Glass – EXT-NE
NA
NA
SBB (Lot 8)
Set & Grout Thin Brick – EXT-NE
NA
NA
SBB (Lot 8)
Install Communications Racks/Equipment – ELEC-L1
NA
NA
SBB (Lot 8)
Tape Walls Soffits & Hard lids – INT-L1
NA
NA
SBB (Lot 8)
Hang Drywall & Inspect – RR-L1
NA
NA
SBB (Lot 8)
Tape Walls – INT-AUD
NA
NA
SBB (Lot 8)
Install Lights and Egress Lighting – INT-L2
NA
NA
SBB (Lot 8)
Install HVAC Grills & Diffusers – INT-L2
NA
NA
SBB (Lot 8)
Prime & Paint Hardlids at Fixture Leave out – INT-L3
NA
NA
SBB (Lot 8)
Hang Drywall & Inspect – RR-L3
NA
NA
SBB (Lot 8)
Tape Walls Soffits & Hard lids – INT-L4
NA
NA
SBB (Lot 8)
Schedule State Elevator Inspection – ELEV
NA
NA
Anderson Park
F/R/P Site Walls - Loading Dock – SITE AP
Heavy Equipment
Noise
Week of May 13, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Caulking – EXT-SW
NA
NA
SBB (Lot 8)
Curtain Wall - Frames & Glass – EXT-SW
NA
NA
SBB (Lot 8)
Set & Grout Thin Brick – EXT-NE
NA
NA
SBB (Lot 8)
Tape Walls & Ceilings – RR-L1
NA
NA
SBB (Lot 8)
Prime & Paint Hardlids at Fixture Leaveout – INT-L2
NA
NA
SBB (Lot 8)
Install Interior Glazing – INT-L2
NA
NA
SBB (Lot 8)
Prime & Paint Hardlids at Fixture Leaveout – INT-L3
NA
NA
SBB (Lot 8)
Hang Drywall & Inspect – RR-L3
NA
NA
SBB (Lot 8)
Install Lights and Egress Lighting – INT-L3
NA
NA
SBB (Lot 8)
Install HVAC Grills & Diffusers – INT-L3
NA
NA
SBB (Lot 8)
Install Fire Sprinkler Drops / Heads – INT-L3
NA
NA
SBB (Lot 8)
Install Fire Alarm Devices – INT-L3
NA
NA
SBB (Lot 8)
Prime & 1st Coat of Paint, Walls, Hard lids & Exposed Ceilings– INT-L4
NA
NA
Anderson Park
F/R/P Hardscape
Heavy Equipment
Noise
Anderson Park
F/R/P Site Walls - Amphitheater
Heavy Equipment
Noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #76
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Metal Panels – EXT-L1 NA
NA
SBB (Lot 8)
Punched Openings – Glass – EXT-NE NA
NA
SBB (Lot 8)
Curtain Wall – Glass – EXT-NE NA
NA
SBB (Lot 8)
Grout Thin Brick – EXT-NE NA
NA
SBB (Lot 8)
Tape Walls Soffits & Hard lids – INT-L1 NA
NA
SBB (Lot 8)
Install Roll Up Door - Cafe NA
NA
SBB (Lot 8)
Install Acoustical Grid – INT-AUD NA
NA
SBB (Lot 8)
Install Backing – RR-L2 NA
NA
SBB (Lot 8)
Install Backing – RR-L3 NA
NA
SBB (Lot 8)
Install Backing – RR-L4 NA
NA
SBB (Lot 8)
Install Acoustical Grid – INT-L2 NA
NA
SBB (Lot 8)
Tape Walls Soffits & Hard lids – INT-L3 NA
NA
SBB (Lot 8)
Install Ductwork Insulation – INT-L4 NA
NA
SBB (Lot 8)
Hang 2nd Side Drywall & Inspect – INT-L4 NA
NA
SBB (Lot 8)
Remove Protection & Install Finishes - ELEV NA
NA
Anderson Park
Backfill Planters – SITE-AP Heavy Equipment
Noise
Anderson Park
F/R/P Seat Benches Heavy Equipment
Noise
Week of April 29, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Caulking – EXT-L1
NA
NA
SBB (Lot 8)
Remove Scaffold – EXT-L1
NA
NA
SBB (Lot 8)
Metal Panels – North of F Line EXT-NE
NA
NA
SBB (Lot 8)
Caulking – EXT-SW
NA
NA
SBB (Lot 8)
Exterior Framing – Manlift Layout
NA
NA
SBB (Lot 8)
Rigid Insulation and Air Water Barrier – Manlift Layout
NA
NA
SBB (Lot 8)
Tape Walls Soffits & Hard lids – INT-L1
NA
NA
SBB (Lot 8)
Hang Drywall & Inspect – RR-L1
NA
NA
SBB (Lot 8)
Tape Walls & Ceilings – RR-L1
NA
NA
SBB (Lot 8)
Install Roll Up Door - CAFE
NA
NA
SBB (Lot 8)
Prime & 1st Coat of Paint, Walls, Hard lids & Exposed Ceilings – INT-L1
NA
NA
SBB (Lot 8)
Install Acoustical Grid – INT-AUD
NA
NA
SBB (Lot 8)
Install Fire Sprinkler Drops / Heads – INT-AUD
NA
NA
SBB (Lot 8)
Install Fire Alarm Devices – INT-AUD
NA
NA
SBB (Lot 8)
Install Lights and Egress Lighting – INT-AUD
NA
NA
SBB (Lot 8)
Install HVAC Grills & Diffusers – INT-AUD
NA
NA
SBB (Lot 8)
Hang Drywall & Inspect – RR-L2
NA
NA
SBB (Lot 8)
Tape Walls & Ceilings – RR-L2
NA
NA
SBB (Lot 8)
Install HVAC Grills & Diffusers – INT-L2
NA
NA
SBB (Lot 8)
Install Fire Sprinkler Drops / Heads – INT-L2
NA
NA
SBB (Lot 8)
Install Fire Alarm Devices – INT-L2
NA
NA
SBB (Lot 8)
Install Lights and Egress Lighting – INT-L2
NA
NA
SBB (Lot 8)
Tape Walls & Ceilings – RR-L3
NA
NA
SBB (Lot 8)
Install Acoustical Grid – INT-L3
NA
NA
SBB (Lot 8)
Install Cable Tray – INT-L4
NA
NA
SBB (Lot 8)
Tape Walls Soffits & Hard lids – INT-L4
NA
NA
SBB (Lot 8)
Pull Low Voltage Cable – INT-L4
NA
NA
SBB (Lot 8)
Tap Walls and Ceilings – RR-L4
NA
NA
Anderson Park
F/R/P Hardscape – Site-AP
Heavy Equipment
Noise
SBB (Lot 8)
Install Irrigation Sleeves – Site-N
NA
NA
SBB (Lot 8)
Install Site Lighting Underground – Site-N
NA
NA
SBB (Lot 8)
Tie-in Chilled Water to Campus Loop
NA
NA
SBB (Lot 8)
Startup/Test Refrigerant Alarm System
NA
NA
Week of May 6, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Set & Grout Thin Brick – EXT-SW
NA
NA
SBB (Lot 8)
Curtain Wall - Frames & Glass – EXT-SW
NA
NA
SBB (Lot 8)
Lath & Trims – EXT-L1
NA
NA
SBB (Lot 8)
Curtain Wall - Frames & Glass – EXT-NE
NA
NA
SBB (Lot 8)
Set & Grout Thin Brick – EXT-NE
NA
NA
SBB (Lot 8)
Install Communications Racks/Equipment – ELEC-L1
NA
NA
SBB (Lot 8)
Tape Walls Soffits & Hard lids – INT-L1
NA
NA
SBB (Lot 8)
Hang Drywall & Inspect – RR-L1
NA
NA
SBB (Lot 8)
Tape Walls – INT-AUD
NA
NA
SBB (Lot 8)
Install Lights and Egress Lighting – INT-L2
NA
NA
SBB (Lot 8)
Install HVAC Grills & Diffusers – INT-L2
NA
NA
SBB (Lot 8)
Prime & Paint Hardlids at Fixture Leave out – INT-L3
NA
NA
SBB (Lot 8)
Hang Drywall & Inspect – RR-L3
NA
NA
SBB (Lot 8)
Tape Walls Soffits & Hard lids – INT-L4
NA
NA
SBB (Lot 8)
Schedule State Elevator Inspection – ELEV
NA
NA
Anderson Park
F/R/P Site Walls - Loading Dock – SITE AP
Heavy Equipment
Noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #75
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install Roofing System - North of E Line
NA
NA
SBB (Lot 8)
Caulking – EXT-SW
NA
NA
SBB (Lot 8)
Set & Grout Thin Brick – EXT-SW
NA
NA
SBB (Lot 8)
Punched Openings - Frames & Glass – EXT-SW
NA
NA
SBB (Lot 8)
Curtain Wall - Frames & Glass – EXT-SW
NA
NA
SBB (Lot 8)
Punched Openings - Frames & Glass – EXT-NE
NA
NA
SBB (Lot 8)
Curtain Wall - Frames & Glass – EXT-NE
NA
NA
SBB (Lot 8)
Set & Grout Thin Brick – EXT-NE
NA
NA
SBB (Lot 8)
Plumbing Piping, Hook-up & Insulation – MECH-L1
NA
NA
SBB (Lot 8)
Set Distribution Board HDP-1A – MECH-L1
NA
NA
SBB (Lot 8)
Pull Low Voltage Cable – INT-L1
NA
NA
SBB (Lot 8)
Pull Electrical – INT-L1
NA
NA
SBB (Lot 8)
Install In-Wall & Hard lid Electrical – RR-L1
NA
NA
SBB (Lot 8)
Tape Walls – INT-AUD
NA
NA
SBB (Lot 8)
Install Conduit to Switchgear – ELEC-L1
NA
NA
SBB (Lot 8)
Install Feeder Cable / Home Runs – ELEC-AUD
NA
NA
SBB (Lot 8)
Fab/Deliver Ceiling Light Fixtures – RR-L2
NA
NA
SBB (Lot 8)
Prime & 1st Coat of Paint, Walls, Hard lids & Exposed Ceilings – INT-L2
NA
NA
SBB (Lot 8)
Install Operable Partition Track – INT-L2
NA
NA
SBB (Lot 8)
Install Acoustical Grid – INT-L2
NA
NA
SBB (Lot 8)
Install In-Wall & Hard lid Electrical – RR-L3
NA
NA
SBB (Lot 8)
Install O/H Supply & Return Ductwork Branch & Seismic – INT-L4
NA
NA
SBB (Lot 8)
Set Remaining Equipment / Install Feeder Cable / Home Runs – ELEC-L4
NA
NA
SBB (Lot 8)
Hang 2nd Side Drywall & Inspect – INT-L4
NA
NA
SBB (Lot 8)
Install In-Wall & Hard lid Electrical – RR-L4
NA
NA
SBB (Lot 8)
Set, Hook-up & Terminate MTS - ELEC
NA
NA
Anderson Park
Backfill Planters – SITE AP
Heavy Equipment
Noise
Week of April 22, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Metal Panels – EXT-L1 NA
NA
SBB (Lot 8)
Punched Openings – Glass – EXT-NE NA
NA
SBB (Lot 8)
Curtain Wall – Glass – EXT-NE NA
NA
SBB (Lot 8)
Grout Thin Brick – EXT-NE NA
NA
SBB (Lot 8)
Tape Walls Soffits & Hard lids – INT-L1 NA
NA
SBB (Lot 8)
Install Roll Up Door - Cafe NA
NA
SBB (Lot 8)
Install Acoustical Grid – INT-AUD NA
NA
SBB (Lot 8)
Install Backing – RR-L2 NA
NA
SBB (Lot 8)
Install Backing – RR-L3 NA
NA
SBB (Lot 8)
Install Backing – RR-L4 NA
NA
SBB (Lot 8)
Install Acoustical Grid – INT-L2 NA
NA
SBB (Lot 8)
Tape Walls Soffits & Hard lids – INT-L3 NA
NA
SBB (Lot 8)
Install Ductwork Insulation – INT-L4 NA
NA
SBB (Lot 8)
Hang 2nd Side Drywall & Inspect – INT-L4 NA
NA
SBB (Lot 8)
Remove Protection & Install Finishes - ELEV NA
NA
Anderson Park
Backfill Planters – SITE-AP Heavy Equipment
Noise
Anderson Park
F/R/P Seat Benches Heavy Equipment
Noise
Week of April 29, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Caulking – EXT-L1
NA
NA
SBB (Lot 8)
Remove Scaffold – EXT-L1
NA
NA
SBB (Lot 8)
Metal Panels – North of F Line EXT-NE
NA
NA
SBB (Lot 8)
Caulking – EXT-SW
NA
NA
SBB (Lot 8)
Exterior Framing – Manlift Leavout
NA
NA
SBB (Lot 8)
Rigid Insulation and Air Water Barrier – Manlift Leavout
NA
NA
SBB (Lot 8)
Tape Walls Soffits & Hard lids – INT-L1
NA
NA
SBB (Lot 8)
Hang Drywall & Inspect – RR-L1
NA
NA
SBB (Lot 8)
Tape Walls & Ceilings – RR-L1
NA
NA
SBB (Lot 8)
Install Roll Up Door - CAFE
NA
NA
SBB (Lot 8)
Prime & 1st Coat of Paint, Walls, Hard lids & Exposed Ceilings – INT-L1
NA
NA
SBB (Lot 8)
Install Acoustical Grid – INT-AUD
NA
NA
SBB (Lot 8)
Install Fire Sprinkler Drops / Heads – INT-AUD
NA
NA
SBB (Lot 8)
Install Fire Alarm Devices – INT-AUD
NA
NA
SBB (Lot 8)
Install Lights and Egress Lighting – INT-AUD
NA
NA
SBB (Lot 8)
Install HVAC Grills & Diffusers – INT-AUD
NA
NA
SBB (Lot 8)
Hang Drywall & Inspect – RR-L2
NA
NA
SBB (Lot 8)
Tape Walls & Ceilings – RR-L2
NA
NA
SBB (Lot 8)
Install HVAC Grills & Diffusers – INT-L2
NA
NA
SBB (Lot 8)
Install Fire Sprinkler Drops / Heads – INT-L2
NA
NA
SBB (Lot 8)
Install Fire Alarm Devices – INT-L2
NA
NA
SBB (Lot 8)
Install Lights and Egress Lighting – INT-L2
NA
NA
SBB (Lot 8)
Tape Walls & Ceilings – RR-L3
NA
NA
SBB (Lot 8)
Install Acoustical Grid – INT-L3
NA
NA
SBB (Lot 8)
Install Cable Tray – INT-L4
NA
NA
SBB (Lot 8)
Tape Walls Soffits & Hard lids – INT-L4
NA
NA
SBB (Lot 8)
Pull Low Voltage Cable – INT-L4
NA
NA
SBB (Lot 8)
Tap Walls and Ceilings – RR-L4
NA
NA
Anderson Park
F/R/P Hardscape – Site-AP
Heavy Equipment
Noise
SBB (Lot 8)
Install Irrigation Sleeves – Site-N
NA
NA
SBB (Lot 8)
Install Site Lighting Underground – Site-N
NA
NA
SBB (Lot 8)
Tie-in Chilled Water to Campus Loop
NA
NA
SBB (Lot 8)
Startup/Test Refrigerant Alarm System
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #74
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install Roofing System - South of E Line
NA
NA
SBB (Lot 8)
Curtain Wall – Frames – EXT-L1
NA
NA
SBB (Lot 8)
Set Thin Brick – EXT-L1
NA
NA
SBB (Lot 8)
Punched Openings - Glass – EXT-SW
NA
NA
SBB (Lot 8)
Curtain Wall - Glass – EXT-SW
NA
NA
SBB (Lot 8)
Grout Thin Brick – EXT-SW
NA
NA
SBB (Lot 8)
Install Hardlid Electrical – INT-L1
NA
NA
SBB (Lot 8)
Install In-Wall Plumbing – INT-L1
NA
NA
SBB (Lot 8)
Install Cable Tray – INT-L1
NA
NA
SBB (Lot 8)
O/H MEP Rough-in - Cafe
NA
NA
SBB (Lot 8)
Tape Walls – INT-AUD
NA
NA
SBB (Lot 8)
Hang 1st Side Drywall – INT-L3
NA
NA
SBB (Lot 8)
Install Cable Tray – INT-L3
NA
NA
SBB (Lot 8)
Install Insulation & Inspect – INT-L3
NA
NA
SBB (Lot 8)
Fire Tape – INT-L3
NA
NA
SBB (Lot 8)
Install O/H Supply & Return Ductwork Branch & Seismic – INT-L4
NA
NA
SBB (Lot 8)
Frame Ceiling – RR-L4
NA
NA
SBB (Lot 8)
Hang, Tape and Finish Elevator Fronts - ELEV
NA
NA
Anderson Park
F/R/P Site Walls – SITE-AP
Heavy Equipment
Noise
Week of April 15, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install Roofing System - North of E Line NA
NA
SBB (Lot 8)
Caulking – EXT-SW NA
NA
SBB (Lot 8)
Set & Grout Thin Brick – EXT-SW NA
NA
SBB (Lot 8)
Punched Openings - Frames & Glass – EXT-SW NA
NA
SBB (Lot 8)
Curtain Wall - Frames & Glass – EXT-SW NA
NA
SBB (Lot 8)
Punched Openings - Frames & Glass – EXT-NE NA
NA
SBB (Lot 8)
Curtain Wall - Frames & Glass – EXT-NE NA
NA
SBB (Lot 8)
Set & Grout Thin Brick – EXT-NE NA
NA
SBB (Lot 8)
Plumbing Piping, Hook-up & Insulation – MECH-L1 NA
NA
SBB (Lot 8)
Set Distribution Board HDP-1A – MECH-L1 NA
NA
SBB (Lot 8)
Pull Low Voltage Cable – INT-L1 NA
NA
SBB (Lot 8)
Pull Electrical – INT-L1 NA
NA
SBB (Lot 8)
Install In-Wall & Hard lid Electrical – RR-L1 NA
NA
SBB (Lot 8)
Tape Walls – INT-AUD NA
NA
SBB (Lot 8)
Install Conduit to Switchgear – ELEC-L1 NA
NA
SBB (Lot 8)
Install Feeder Cable / Home Runs – ELEC-AUD NA
NA
SBB (Lot 8)
Fab/Deliver Ceiling Light Fixtures – RR-L2 NA
NA
SBB (Lot 8)
Prime & 1st Coat of Paint, Walls, Hard lids & Exposed Ceilings – INT-L2 NA
NA
SBB (Lot 8)
Install Operable Partition Track – INT-L2 NA
NA
SBB (Lot 8)
Install Acoustical Grid – INT-L2 NA
NA
SBB (Lot 8)
Install In-Wall & Hard lid Electrical – RR-L3 NA
NA
SBB (Lot 8)
Install O/H Supply & Return Ductwork Branch & Seismic – INT-L4 NA
NA
SBB (Lot 8)
Set Remaining Equipment / Install Feeder Cable / Home Runs – ELEC-L4 NA
NA
SBB (Lot 8)
Hang 2nd Side Drywall & Inspect – INT-L4 NA
NA
SBB (Lot 8)
Install In-Wall & Hard lid Electrical – RR-L4 NA
NA
SBB (Lot 8)
Set, Hook-up & Terminate MTS - ELEC NA
NA
Anderson Park
Backfill Planters – SITE AP Heavy Equipment
Noise
Week of April 22, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Metal Panels – EXT-L1
NA
NA
SBB (Lot 8)
Punched Openings – Glass – EXT-NE
NA
NA
SBB (Lot 8)
Curtain Wall – Glass – EXT-NE
NA
NA
SBB (Lot 8)
Grout Thin Brick – EXT-NE
NA
NA
SBB (Lot 8)
Tape Walls Soffits & Hard lids – INT-L1
NA
NA
SBB (Lot 8)
Install Roll Up Door - Cafe
NA
NA
SBB (Lot 8)
Install Acoustical Grid – INT-AUD
NA
NA
SBB (Lot 8)
Install Backing – RR-L2
NA
NA
SBB (Lot 8)
Install Backing – RR-L3
NA
NA
SBB (Lot 8)
Install Backing – RR-L4
NA
NA
SBB (Lot 8)
Install Acoustical Grid – INT-L2
NA
NA
SBB (Lot 8)
Tape Walls Soffits & Hard lids – INT-L3
NA
NA
SBB (Lot 8)
Install Ductwork Insulation – INT-L4
NA
NA
SBB (Lot 8)
Hang 2nd Side Drywall & Inspect – INT-L4
NA
NA
SBB (Lot 8)
Remove Protection & Install Finishes - ELEV
NA
NA
Anderson Park
Backfill Planters – SITE-AP
Heavy Equipment
Noise
Anderson Park
F/R/P Seat Benches
Heavy Equipment
Noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #73
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install Roofing System - South of E Line
NA
NA
SBB (Lot 8)
Curtain Wall – Frames – EXT-L1
NA
NA
SBB (Lot 8)
Set Thin Brick – EXT-L1
NA
NA
SBB (Lot 8)
Set Thin Brick – EXT-SW
NA
NA
SBB (Lot 8)
Punched Openings - Frames – EXT-SW
NA
NA
SBB (Lot 8)
Curtain Wall - Frames – EXT-SW
NA
NA
SBB (Lot 8)
F/R/P Stair Treads/Landings – EXT-SW
NA
NA
SBB (Lot 8)
Cement Board – EXT-NE
NA
NA
SBB (Lot 8)
Secondary Air Barrier – EXT-NE
NA
NA
SBB (Lot 8)
Install Feeder Cable / Home Runs – ELEC-L1
NA
NA
SBB (Lot 8)
Controls Hook-up Equipment (Incl. Refrigerant Alarm) – MECH-L1
NA
NA
SBB (Lot 8)
Plumbing Piping, Hook-up & Insulation – MECH-L1
NA
NA
SBB (Lot 8)
Set Distribution Board HDP-1A – MECH-L1
NA
NA
SBB (Lot 8)
Install Feeder Cable from MSB – MECH-L1
NA
NA
SBB (Lot 8)
Electrical Hook-up Equipment – MECH-L1
NA
NA
SBB (Lot 8)
Install In-Wall & Branch Electrical – INT-L1
NA
NA
SBB (Lot 8)
Install In-Wall Low Voltage – INT-L1
NA
NA
SBB (Lot 8)
Top Down Drywall / Fire Tape / TOW - Cafe
NA
NA
SBB (Lot 8)
Fire Tape – INT-AUD
NA
NA
SBB (Lot 8)
Hang 2nd Side Drywall & Inspect – INT-AUD
NA
NA
SBB (Lot 8)
Install Ductwork Insulation – INT-AUD
NA
NA
SBB (Lot 8)
Pull Low Voltage Cable – INT-L2
NA
NA
SBB (Lot 8)
Install Corner Bead – INT-L2
NA
NA
SBB (Lot 8)
Pull Electrical – INT-L3
NA
NA
SBB (Lot 8)
Install O/H Mechanical Equipment & Ductwork Mains & Seismic – INT-L4
NA
NA
SBB (Lot 8)
Pull Electrical – INT-L4
NA
NA
SBB (Lot 8)
Fire Tape – RR-L4
NA
NA
SBB (Lot 8)
Fire Caulk Head of Wall – RR-L4
NA
NA
SBB (Lot 8)
Frame Ceiling – RR-L4
NA
NA
SBB (Lot 8)
Frame Elevator Fronts - ELEV
NA
NA
SBB (Lot 8)
Install Hoistway Wiring - ELEV
NA
NA
Anderson Park
F/R/P Site Walls – SITE-AP
Heavy Equipment
Noise
Anderson Park
F/R/P Seat Benches – SITE-EAST
Heavy Equipment
Noise
Week of April 8, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install Roofing System - South of E Line NA
NA
SBB (Lot 8)
Curtain Wall – Frames – EXT-L1 NA
NA
SBB (Lot 8)
Set Thin Brick – EXT-L1 NA
NA
SBB (Lot 8)
Punched Openings - Glass – EXT-SW NA
NA
SBB (Lot 8)
Curtain Wall - Glass – EXT-SW NA
NA
SBB (Lot 8)
Grout Thin Brick – EXT-SW NA
NA
SBB (Lot 8)
Install Hardlid Electrical – INT-L1 NA
NA
SBB (Lot 8)
Install In-Wall Plumbing – INT-L1 NA
NA
SBB (Lot 8)
Install Cable Tray – INT-L1 NA
NA
SBB (Lot 8)
O/H MEP Rough-in - Cafe NA
NA
SBB (Lot 8)
Tape Walls – INT-AUD NA
NA
SBB (Lot 8)
Hang 1st Side Drywall – INT-L3 NA
NA
SBB (Lot 8)
Install Cable Tray – INT-L3 NA
NA
SBB (Lot 8)
Install Insulation & Inspect – INT-L3 NA
NA
SBB (Lot 8)
Fire Tape – INT-L3 NA
NA
SBB (Lot 8)
Install O/H Supply & Return Ductwork Branch & Seismic – INT-L4 NA
NA
SBB (Lot 8)
Frame Ceiling – RR-L4 NA
NA
SBB (Lot 8)
Hang, Tape and Finish Elevator Fronts - ELEV NA
NA
Anderson Park
F/R/P Site Walls – SITE-AP Heavy Equipment
Noise
Week of April 15, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install Roofing System - North of E Line
NA
NA
SBB (Lot 8)
Caulking – EXT-SW
NA
NA
SBB (Lot 8)
Set & Grout Thin Brick – EXT-SW
NA
NA
SBB (Lot 8)
Punched Openings - Frames & Glass – EXT-SW
NA
NA
SBB (Lot 8)
Curtain Wall - Frames & Glass – EXT-SW
NA
NA
SBB (Lot 8)
Punched Openings - Frames & Glass – EXT-NE
NA
NA
SBB (Lot 8)
Curtain Wall - Frames & Glass – EXT-NE
NA
NA
SBB (Lot 8)
Set & Grout Thin Brick – EXT-NE
NA
NA
SBB (Lot 8)
Plumbing Piping, Hook-up & Insulation – MECH-L1
NA
NA
SBB (Lot 8)
Set Distribution Board HDP-1A – MECH-L1
NA
NA
SBB (Lot 8)
Pull Low Voltage Cable – INT-L1
NA
NA
SBB (Lot 8)
Pull Electrical – INT-L1
NA
NA
SBB (Lot 8)
Install In-Wall & Hard lid Electrical – RR-L1
NA
NA
SBB (Lot 8)
Tape Walls – INT-AUD
NA
NA
SBB (Lot 8)
Install Conduit to Switchgear – ELEC-L1
NA
NA
SBB (Lot 8)
Install Feeder Cable / Home Runs – ELEC-AUD
NA
NA
SBB (Lot 8)
Fab/Deliver Ceiling Light Fixtures – RR-L2
NA
NA
SBB (Lot 8)
Prime & 1st Coat of Paint, Walls, Hard lids & Exposed Ceilings – INT-L2
NA
NA
SBB (Lot 8)
Install Operable Partition Track – INT-L2
NA
NA
SBB (Lot 8)
Install Acoustical Grid – INT-L2
NA
NA
SBB (Lot 8)
Install In-Wall & Hard lid Electrical – RR-L3
NA
NA
SBB (Lot 8)
Install O/H Supply & Return Ductwork Branch & Seismic – INT-L4
NA
NA
SBB (Lot 8)
Set Remaining Equipment / Install Feeder Cable / Home Runs – ELEC-L4
NA
NA
SBB (Lot 8)
Hang 2nd Side Drywall & Inspect – INT-L4
NA
NA
SBB (Lot 8)
Install In-Wall & Hard lid Electrical – RR-L4
NA
NA
SBB (Lot 8)
Set, Hook-up & Terminate MTS - ELEC
NA
NA
Anderson Park
Backfill Planters – SITE AP
Heavy Equipment
Noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #72
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Controls Hook-up Equipment - RF
NA
NA
SBB (Lot 8)
Secondary Air Barrier – EXT-L1
NA
NA
SBB (Lot 8)
Secondary Air Barrier – EXT-SW
NA
NA
SBB (Lot 8)
Set Thin Brick – EXT-SW
NA
NA
SBB (Lot 8)
Punched Openings - Frames – EXT-SW
NA
NA
SBB (Lot 8)
Curtain Wall - Frames – EXT-SW
NA
NA
SBB (Lot 8)
F/R/P Stair Treads/Landings – EXT-SW
NA
NA
SBB (Lot 8)
Drainage Layer – EXT-NE
NA
NA
SBB (Lot 8)
Install Electrical Gear ELEC-L1
NA
NA
SBB (Lot 8)
Controls Hook-up Equipment (Incl. Refrigerant Alarm) – MECH-L1
NA
NA
SBB (Lot 8)
Plumbing Piping, Hook-up & Insulation – MECH-L1
NA
NA
SBB (Lot 8)
Frame Remaining Walls, Soffits & Hard lids – INT-L1
NA
NA
SBB (Lot 8)
In-Wall MEP Rough-in - Cafe
NA
NA
SBB (Lot 8)
Hang Drywall – INT-AUD
NA
NA
SBB (Lot 8)
Pull Low Voltage Cable – INT-AUD
NA
NA
SBB (Lot 8)
Pressure Test Ductwork – INT-AUD
NA
NA
SBB (Lot 8)
Install Ductwork Insulation – INT-AUD
NA
NA
SBB (Lot 8)
Install Feeder Cable / Home Runs – ELEC-AUD
NA
NA
SBB (Lot 8)
Install Switchgear MSB – ELEC-L1
NA
NA
SBB (Lot 8)
Hang 2nd Side Drywall & Inspect – INT-L2
NA
NA
SBB (Lot 8)
Pull Low Voltage Cable – INT-L2
NA
NA
SBB (Lot 8)
Install Ductwork Insulation – INT-L3
NA
NA
SBB (Lot 8)
Pressure Test Ductwork – INT-L3
NA
NA
SBB (Lot 8)
Install Feeder Cable / Home Runs – ELEC-L3
NA
NA
SBB (Lot 8)
Install In-Wall & Branch Electrical – INT-L3
NA
NA
SBB (Lot 8)
Install In-Wall Low Voltage – INT-L3
NA
NA
SBB (Lot 8)
Install Hardlid Electrical – INT-L3
NA
NA
SBB (Lot 8)
Install In-Wall Plumbing – INT-L3
NA
NA
SBB (Lot 8)
Fire Tape – INT-L4
NA
NA
SBB (Lot 8)
Fire Caulk Head of Wall – INT-L4
NA
NA
SBB (Lot 8)
Install Feeder Cable / Home Run – INT-L4
NA
NA
SBB (Lot 8)
Hang Top Down Drywall – RR-L4
NA
NA
SBB (Lot 8)
Complete Install Guide Rails - ELEV
NA
NA
SBB (Lot 8)
Install Entrances and Doors - ELEV
NA
NA
SBB (Lot 8)
Install Site Lighting Underground – SITE-AP
NA
NA
SBB (Lot 8)
F/R/P Site Walls – SITE-AP
NA
NA
Week of April 1, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install Roofing System - South of E Line NA
NA
SBB (Lot 8)
Curtain Wall – Frames – EXT-L1 NA
NA
SBB (Lot 8)
Set Thin Brick – EXT-L1 NA
NA
SBB (Lot 8)
Set Thin Brick – EXT-SW NA
NA
SBB (Lot 8)
Punched Openings - Frames – EXT-SW NA
NA
SBB (Lot 8)
Curtain Wall - Frames – EXT-SW NA
NA
SBB (Lot 8)
F/R/P Stair Treads/Landings – EXT-SW NA
NA
SBB (Lot 8)
Cement Board – EXT-NE NA
NA
SBB (Lot 8)
Secondary Air Barrier – EXT-NE NA
NA
SBB (Lot 8)
Install Feeder Cable / Home Runs – ELEC-L1 NA
NA
SBB (Lot 8)
Controls Hook-up Equipment (Incl. Refrigerant Alarm) – MECH-L1 NA
NA
SBB (Lot 8)
Plumbing Piping, Hook-up & Insulation – MECH-L1 NA
NA
SBB (Lot 8)
Set Distribution Board HDP-1A – MECH-L1 NA
NA
SBB (Lot 8)
Install Feeder Cable from MSB – MECH-L1 NA
NA
SBB (Lot 8)
Electrical Hook-up Equipment – MECH-L1 NA
NA
SBB (Lot 8)
Install In-Wall & Branch Electrical – INT-L1 NA
NA
SBB (Lot 8)
Install In-Wall Low Voltage – INT-L1 NA
NA
SBB (Lot 8)
Top Down Drywall / Fire Tape / TOW - Cafe NA
NA
SBB (Lot 8)
Fire Tape – INT-AUD NA
NA
SBB (Lot 8)
Hang 2nd Side Drywall & Inspect – INT-AUD NA
NA
SBB (Lot 8)
Install Ductwork Insulation – INT-AUD NA
NA
SBB (Lot 8)
Pull Low Voltage Cable – INT-L2 NA
NA
SBB (Lot 8)
Install Corner Bead – INT-L2 NA
NA
SBB (Lot 8)
Pull Electrical – INT-L3 NA
NA
SBB (Lot 8)
Install O/H Mechanical Equipment & Ductwork Mains & Seismic – INT-L4 NA
NA
SBB (Lot 8)
Pull Electrical – INT-L4 NA
NA
SBB (Lot 8)
Fire Tape – RR-L4 NA
NA
SBB (Lot 8)
Fire Caulk Head of Wall – RR-L4 NA
NA
SBB (Lot 8)
Frame Ceiling – RR-L4 NA
NA
SBB (Lot 8)
Frame Elevator Fronts - ELEV NA
NA
SBB (Lot 8)
Install Hoistway Wiring - ELEV NA
NA
SBB (Lot 8)
F/R/P Site Walls – SITE-AP NA
NA
SBB (Lot 8)
F/R/P Seat Benches – SITE-EAST NA
NA
Week of April 8, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install Roofing System - South of E Line
NA
NA
SBB (Lot 8)
Curtain Wall – Frames – EXT-L1
NA
NA
SBB (Lot 8)
Set Thin Brick – EXT-L1
NA
NA
SBB (Lot 8)
Punched Openings - Glass – EXT-SW
NA
NA
SBB (Lot 8)
Curtain Wall - Glass – EXT-SW
NA
NA
SBB (Lot 8)
Grout Thin Brick – EXT-SW
NA
NA
SBB (Lot 8)
Install Hardlid Electrical – INT-L1
NA
NA
SBB (Lot 8)
Install In-Wall Plumbing – INT-L1
NA
NA
SBB (Lot 8)
Install Cable Tray – INT-L1
NA
NA
SBB (Lot 8)
O/H MEP Rough-in - Cafe
NA
NA
SBB (Lot 8)
Tape Walls – INT-AUD
NA
NA
SBB (Lot 8)
Hang 1st Side Drywall – INT-L3
NA
NA
SBB (Lot 8)
Install Cable Tray – INT-L3
NA
NA
SBB (Lot 8)
Install Insulation & Inspect – INT-L3
NA
NA
SBB (Lot 8)
Fire Tape – INT-L3
NA
NA
SBB (Lot 8)
Install O/H Supply & Return Ductwork Branch & Seismic – INT-L4
NA
NA
SBB (Lot 8)
Frame Ceiling – RR-L4
NA
NA
SBB (Lot 8)
Hang, Tape and Finish Elevator Fronts - ELEV
NA
NA
SBB (Lot 8)
F/R/P Site Walls – SITE-AP
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #71
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install PV Panel System - North of E Line
NA
NA
SBB (Lot 8)
Cement Board – EXT-L1
NA
NA
SBB (Lot 8)
Secondary Air Barrier– EXT-L1
NA
NA
SBB (Lot 8)
Drainage Layer– EXT-NE
NA
NA
SBB (Lot 8)
Cement Board– EXT-NE
NA
NA
SBB (Lot 8)
Secondary Air Barrier– EXT-SW
NA
NA
SBB (Lot 8)
Erect Stairs– EXT-SW
NA
NA
SBB (Lot 8)
Install Communications Racks/Equipment -ELEC-L1
NA
NA
SBB (Lot 8)
Controls Hook-up Equipment (Incl. Refrigerant Alarm) – MECH-L1
NA
NA
SBB (Lot 8)
Plumbing Piping, Hook-up & Insulation– MECH-L1
NA
NA
SBB (Lot 8)
Frame Remaining Walls, Soffits & Hard lids – INT-L1
NA
NA
SBB (Lot 8)
Install O/H Supply & Return Ductwork Branch & Seismic – INT-AUD
NA
NA
SBB (Lot 8)
Pull Electrical – INT-AUD
NA
NA
SBB (Lot 8)
Pull Low Voltage Cable – INT-AUD
NA
NA
SBB (Lot 8)
Install Conduit – ELEC-AUD
NA
NA
SBB (Lot 8)
Install Conduit – ELEC-L2
NA
NA
SBB (Lot 8)
Hang 2nd Side Drywall & Inspect - INT-L2
NA
NA
SBB (Lot 8)
Pull Low Voltage Cable- INT-L2
NA
NA
SBB (Lot 8)
Install Backing – RR-L2
NA
NA
SBB (Lot 8)
Install Insulation and Inspect – RR-L2
NA
NA
SBB (Lot 8)
Hang Drywall & Inspect– RR-L2
NA
NA
SBB (Lot 8)
Install Conduit – ELEC-L3
NA
NA
SBB (Lot 8)
Install Hardlid Electrical – INT-L3
NA
NA
SBB (Lot 8)
Install In-Wall Plumbing – INT-L3
NA
NA
SBB (Lot 8)
Install In-Wall & Hard lid Electrical– RR-L3
NA
NA
SBB (Lot 8)
Install Backing– RR-L3
NA
NA
SBB (Lot 8)
Install O/H Mechanical Equipment & Ductwork Mains & Seismic – INT-L4
NA
NA
SBB (Lot 8)
Install Conduit – ELEC-L4
NA
NA
SBB (Lot 8)
Install In-Wall & Branch Electrical – INT-L4
NA
NA
SBB (Lot 8)
Install In-Wall Low Voltage – INT-L4
NA
NA
SBB (Lot 8)
Install Hardlid Electrical – INT-L4
NA
NA
SBB (Lot 8)
Machine Room Wiring, Start-up, Running Platform - ELEV
NA
NA
SBB (Lot 8)
F/R/P Site Walls – SITE-AP
NA
NA
SBB (Lot 8)
Install Site Lighting Underground – SITE-AP
NA
NA
Week of March 25, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Curtain Wall – Frames – EXT-L1 NA
NA
SBB (Lot 8)
Set Thin Brick – EXT-L1 NA
NA
SBB (Lot 8)
Cement Board – EXT-NE NA
NA
SBB (Lot 8)
Secondary Air Barrier – EXT-NE NA
NA
SBB (Lot 8)
Set Thin Brick – EXT-SW NA
NA
SBB (Lot 8)
Punched Openings – Frames – EXT-SW NA
NA
SBB (Lot 8)
Curtain Wall – Frames – EXT-SW NA
NA
SBB (Lot 8)
Install In-Wall & Branch Electrical - INT-L1 NA
NA
SBB (Lot 8)
Install In-Wall Low Voltage - INT-L1 NA
NA
SBB (Lot 8)
Hang Drywall – INT-AUD NA
NA
SBB (Lot 8)
Pressure Test Ductwork – INT-AUD NA
NA
SBB (Lot 8)
Install Ductwork Insulation – INT-AUD NA
NA
SBB (Lot 8)
Install Feeder Cable / Home Runs – ELEC-AUD NA
NA
SBB (Lot 8)
Install Switchgear MSB – ELEC-L1 NA
NA
SBB (Lot 8)
Install Feeder Cable / Home Runs – ELEC-L2 NA
NA
SBB (Lot 8)
Tape Walls Soffits & Hard lids – RR-L2 NA
NA
SBB (Lot 8)
Install Feeder Cable / Home Runs – ELEC-L3 NA
NA
SBB (Lot 8)
Hang 1st Side Drywall – INT-L3 NA
NA
SBB (Lot 8)
Install Cable Tray– INT-L3 NA
NA
SBB (Lot 8)
Pull Electrical– INT-L3 NA
NA
SBB (Lot 8)
Install Insulation & Inspect– INT-L3 NA
NA
SBB (Lot 8)
Fire Tape– INT-L3 NA
NA
SBB (Lot 8)
Install Insulation & Inspect – RR-L3 NA
NA
SBB (Lot 8)
Hang Drywall & Inspect – RR-L3 NA
NA
SBB (Lot 8)
Install O/H Mechanical Equipment & Ductwork Mains & Seismic – INT-L4 NA
NA
SBB (Lot 8)
Install O/H Supply & Return Ductwork Branch & Seismic – INT-L4 NA
NA
SBB (Lot 8)
Pull Electrical – INT-L4 NA
NA
SBB (Lot 8)
Hang Top Down Drywall – RR-L4 NA
NA
SBB (Lot 8)
Fire Tape – RR-L4 NA
NA
SBB (Lot 8)
Fire Caulk Head of Wall – RR-L4 NA
NA
SBB (Lot 8)
Complete Install Guide Rails - ELEV NA
NA
Week of April 1, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install Roofing System - South of E Line
NA
NA
SBB (Lot 8)
Curtain Wall – Frames – EXT-L1
NA
NA
SBB (Lot 8)
Set Thin Brick – EXT-L1
NA
NA
SBB (Lot 8)
Punched Openings – Frames – EXT-NE
NA
NA
SBB (Lot 8)
Curtain Wall – Frames – EXT-NE
NA
NA
SBB (Lot 8)
Set Thin Brick – EXT-NE
NA
NA
SBB (Lot 8)
Set Thin Brick – EXT-SW
NA
NA
SBB (Lot 8)
Punched Openings – Frames – EXT-SW
NA
NA
SBB (Lot 8)
Curtain Wall – Frames – EXT-SW
NA
NA
SBB (Lot 8)
F/R/P Stair Treads/Landings – EXT-SW
NA
NA
SBB (Lot 8)
Install Feeder Cable / Home Runs – ELEC-L1
NA
NA
SBB (Lot 8)
Set Distribution Board HDP-1A - MECH-L1
NA
NA
SBB (Lot 8)
Install Feeder Cable from MSB - MECH-L1
NA
NA
SBB (Lot 8)
Install In-Wall & Branch Electrical – INT-L1
NA
NA
SBB (Lot 8)
Install In-Wall Low Voltage – INT-L1
NA
NA
SBB (Lot 8)
Install Hardlid Electrical – INT-L1
NA
NA
SBB (Lot 8)
Install In-Wall Plumbing – INT-L1
NA
NA
SBB (Lot 8)
Install Cable Tray – INT-L1
NA
NA
SBB (Lot 8)
Frame Ceiling – RR-L1
NA
NA
SBB (Lot 8)
Fire Tape - INT-AUD
NA
NA
SBB (Lot 8)
Hang 2nd Side Drywall & Inspect - INT-AUD
NA
NA
SBB (Lot 8)
Install Ductwork Insulation – INT-AUD
NA
NA
SBB (Lot 8)
Install Conduit to Switchgear – ELEC-L1
NA
NA
SBB (Lot 8)
Tape Walls Soffits & Hard lids – INT-L2
NA
NA
SBB (Lot 8)
Hang 1st Side Drywall – INT-L3
NA
NA
SBB (Lot 8)
Pull Low Voltage Cable – INT-L3
NA
NA
SBB (Lot 8)
Pull Electrical – INT-L3
NA
NA
SBB (Lot 8)
Install Insulation & Inspect – INT-L3
NA
NA
SBB (Lot 8)
Install O/H Mechanical Equipment & Ductwork Mains & Seismic – INT-L4
NA
NA
SBB (Lot 8)
Install O/H Supply & Return Ductwork Branch & Seismic – INT-L4
NA
NA
SBB (Lot 8)
Pull Electrical – INT-L4
NA
NA
SBB (Lot 8)
Fire Tape – RR-L4
NA
NA
SBB (Lot 8)
Fire Caulk Head of Wall – RR-L4
NA
NA
SBB (Lot 8)
Frame Ceiling – RR-L4
NA
NA
SBB (Lot 8)
Install Entrances and Doors - ELEV
NA
NA
SBB (Lot 8)
Frame Elevator Fronts - ELEV
NA
NA
SBB (Lot 8)
Install Hoistway Wiring - ELEV
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #70
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Controls Hook-up Equipment
NA
NA
SBB (Lot 8)
Coordinate Drainage Layer Install – EXT-L1
NA
NA
SBB (Lot 8)
Drainage Layer – EXT-L1
NA
NA
SBB (Lot 8)
Flashings / Window Surrounds – EXT-NE
NA
NA
SBB (Lot 8)
Erect Steel Structure for Stairs - EXT-SW
NA
NA
SBB (Lot 8)
Drainage Layer - EXT-SW
NA
NA
SBB (Lot 8)
Install Conduit – ELEC-L1
NA
NA
SBB (Lot 8)
HVAC Ductwork, Hook-up & Insulation – MECH-L1
NA
NA
SBB (Lot 8)
HVAC Piping, Hook-up & Insulation – MECH-L1
NA
NA
SBB (Lot 8)
Set Plumbing Equipment – MECH-L1
NA
NA
SBB (Lot 8)
Install Operable Partition Track -INT-L1
NA
NA
SBB (Lot 8)
Install In-Wall & Branch Electrical – INT-AUD
NA
NA
SBB (Lot 8)
Install In-Wall Low Voltage – INT-AUD
NA
NA
SBB (Lot 8)
Frame Soffit – INT-AUD
NA
NA
SBB (Lot 8)
Install O/H Supply & Return Ductwork Branch & Seismic – INT-AUD
NA
NA
SBB (Lot 8)
Hang 1st Side Drywall – INT-L2
NA
NA
SBB (Lot 8)
Pull Electrical– INT-L2
NA
NA
SBB (Lot 8)
Install Insulation & Inspect– INT-L2
NA
NA
SBB (Lot 8)
Install Cable Tray– INT-L2
NA
NA
SBB (Lot 8)
Install In-Wall & Hard lid Electrical – RR-L2
NA
NA
SBB (Lot 8)
Install Ductwork Insulation – INT-L3
NA
NA
SBB (Lot 8)
Pressure Test Ductwork – INT-L3
NA
NA
SBB (Lot 8)
Install Conduit – ELEC-L3
NA
NA
SBB (Lot 8)
Install In-Wall & Branch Electrical – INT-L3
NA
NA
SBB (Lot 8)
Install In-Wall Low Voltage – INT-L3
NA
NA
SBB (Lot 8)
Frame Ceiling – RR-L3
NA
NA
SBB (Lot 8)
Hang 1st Side Top Down Drywall – INT-L4
NA
NA
SBB (Lot 8)
Install Insulation & Inspect – INT-L4
NA
NA
SBB (Lot 8)
Hang 2nd Side Top Down Drywall & Inspect – INT-L4
NA
NA
SBB (Lot 8)
Insulate Test Hot/Cold Supply & Return Mech Lines – INT-L4
NA
NA
SBB (Lot 8)
Install Mechanical / FSD's – ELEC-L4
NA
NA
SBB (Lot 8)
Frame Remaining Walls, Soffits & Hard lids – INT-L4
NA
NA
SBB (Lot 8)
Install In-Wall Plumbing
NA
NA
SBB (Lot 8)
Install In-Wall & Branch Electrical
NA
NA
SBB (Lot 8)
Install In-Wall Low Voltage
NA
NA
SBB (Lot 8)
Install Hardlid Electrical
NA
NA
SBB (Lot 8)
Install Irrigation Sleeves – SITE-AP
NA
NA
SBB (Lot 8)
Install Site Lighting Underground – SITE-AP
NA
NA
Week of March 18, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install PV Panel System - North of E Line
NA
NA
SBB (Lot 8)
Cement Board – EXT-L1
NA
NA
SBB (Lot 8)
Secondary Air Barrier– EXT-L1
NA
NA
SBB (Lot 8)
Drainage Layer– EXT-NE
NA
NA
SBB (Lot 8)
Cement Board– EXT-NE
NA
NA
SBB (Lot 8)
Secondary Air Barrier– EXT-SW
NA
NA
SBB (Lot 8)
Erect Stairs– EXT-SW
NA
NA
SBB (Lot 8)
Install Communications Racks/Equipment -ELEC-L1
NA
NA
SBB (Lot 8)
Controls Hook-up Equipment (Incl. Refrigerant Alarm) – MECH-L1
NA
NA
SBB (Lot 8)
Plumbing Piping, Hook-up & Insulation– MECH-L1
NA
NA
SBB (Lot 8)
Frame Remaining Walls, Soffits & Hard lids – INT-L1
NA
NA
SBB (Lot 8)
Install O/H Supply & Return Ductwork Branch & Seismic – INT-AUD
NA
NA
SBB (Lot 8)
Pull Electrical – INT-AUD
NA
NA
SBB (Lot 8)
Pull Low Voltage Cable – INT-AUD
NA
NA
SBB (Lot 8)
Install Conduit – ELEC-AUD
NA
NA
SBB (Lot 8)
Install Conduit – ELEC-L2
NA
NA
SBB (Lot 8)
Hang 2nd Side Drywall & Inspect - INT-L2
NA
NA
SBB (Lot 8)
Pull Low Voltage Cable- INT-L2
NA
NA
SBB (Lot 8)
Install Backing – RR-L2
NA
NA
SBB (Lot 8)
Install Insulation and Inspect – RR-L2
NA
NA
SBB (Lot 8)
Hang Drywall & Inspect– RR-L2
NA
NA
SBB (Lot 8)
Install Conduit – ELEC-L3
NA
NA
SBB (Lot 8)
Install Hardlid Electrical – INT-L3
NA
NA
SBB (Lot 8)
Install In-Wall Plumbing – INT-L3
NA
NA
SBB (Lot 8)
Install In-Wall & Hard lid Electrical– RR-L3
NA
NA
SBB (Lot 8)
Install Backing– RR-L3
NA
NA
SBB (Lot 8)
Install O/H Mechanical Equipment & Ductwork Mains & Seismic – INT-L4
NA
NA
SBB (Lot 8)
Install Conduit – ELEC-L4
NA
NA
SBB (Lot 8)
Install In-Wall & Branch Electrical – INT-L4
NA
NA
SBB (Lot 8)
Install In-Wall Low Voltage – INT-L4
NA
NA
SBB (Lot 8)
Install Hardlid Electrical – INT-L4
NA
NA
SBB (Lot 8)
Machine Room Wiring, Start-up, Running Platform - ELEV
NA
NA
SBB (Lot 8)
F/R/P Site Walls – SITE-AP
NA
NA
SBB (Lot 8)
Install Site Lighting Underground – SITE-AP
NA
NA
Week of March 25, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Curtain Wall – Frames – EXT-L1
NA
NA
SBB (Lot 8)
Set Thin Brick – EXT-L1
NA
NA
SBB (Lot 8)
Cement Board – EXT-NE
NA
NA
SBB (Lot 8)
Secondary Air Barrier – EXT-NE
NA
NA
SBB (Lot 8)
Set Thin Brick – EXT-SW
NA
NA
SBB (Lot 8)
Punched Openings – Frames – EXT-SW
NA
NA
SBB (Lot 8)
Curtain Wall – Frames – EXT-SW
NA
NA
SBB (Lot 8)
Install In-Wall & Branch Electrical - INT-L1
NA
NA
SBB (Lot 8)
Install In-Wall Low Voltage - INT-L1
NA
NA
SBB (Lot 8)
Hang Drywall – INT-AUD
NA
NA
SBB (Lot 8)
Pressure Test Ductwork – INT-AUD
NA
NA
SBB (Lot 8)
Install Ductwork Insulation – INT-AUD
NA
NA
SBB (Lot 8)
Install Feeder Cable / Home Runs – ELEC-AUD
NA
NA
SBB (Lot 8)
Install Switchgear MSB – ELEC-L1
NA
NA
SBB (Lot 8)
Install Feeder Cable / Home Runs – ELEC-L2
NA
NA
SBB (Lot 8)
Tape Walls Soffits & Hard lids – RR-L2
NA
NA
SBB (Lot 8)
Install Feeder Cable / Home Runs – ELEC-L3
NA
NA
SBB (Lot 8)
Hang 1st Side Drywall – INT-L3
NA
NA
SBB (Lot 8)
Install Cable Tray– INT-L3
NA
NA
SBB (Lot 8)
Pull Electrical– INT-L3
NA
NA
SBB (Lot 8)
Install Insulation & Inspect– INT-L3
NA
NA
SBB (Lot 8)
Fire Tape– INT-L3
NA
NA
SBB (Lot 8)
Install Insulation & Inspect – RR-L3
NA
NA
SBB (Lot 8)
Hang Drywall & Inspect – RR-L3
NA
NA
SBB (Lot 8)
Install O/H Mechanical Equipment & Ductwork Mains & Seismic – INT-L4
NA
NA
SBB (Lot 8)
Install O/H Supply & Return Ductwork Branch & Seismic – INT-L4
NA
NA
SBB (Lot 8)
Pull Electrical – INT-L4
NA
NA
SBB (Lot 8)
Hang Top Down Drywall – RR-L4
NA
NA
SBB (Lot 8)
Fire Tape – RR-L4
NA
NA
SBB (Lot 8)
Fire Caulk Head of Wall – RR-L4
NA
NA
SBB (Lot 8)
Complete Install Guide Rails - ELEV
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #69
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
HVAC Ductwork, Hook-up & Insulation
NA
NA
SBB (Lot 8)
Stuff & Spray Deck Edge
NA
NA
SBB (Lot 8)
Install PV Panel System - South of E Line
NA
NA
SBB (Lot 8)
Curtain Wall – Frames – EXT-L1
NA
NA
SBB (Lot 8)
Set Thin Brick – EXT-L1
NA
NA
SBB (Lot 8)
Curtain Wall – Frames – EXT-NE
NA
NA
SBB (Lot 8)
Punched Openings – Glass – EXT-NE
NA
NA
SBB (Lot 8)
Secondary Air Barrier – EXT-SW
NA
NA
SBB (Lot 8)
F/R/P Stair Treads/Landings – EXT-SW
NA
NA
SBB (Lot 8)
HVAC Piping, Hook-up & Insulation – MECH-L1
NA
NA
SBB (Lot 8)
Plumbing Piping, Hook-up & Insulation – MECH-L1
NA
NA
SBB (Lot 8)
Pull Low Voltage Cable – INT-L1
NA
NA
SBB (Lot 8)
Pull Electrical – INT-L1
NA
NA
SBB (Lot 8)
Install O/H Mechanical Equipment & Ductwork Mains & Seismic – INT-AUD
NA
NA
SBB (Lot 8)
Install Conduit – ELEC-AUD
NA
NA
SBB (Lot 8)
Install O/H Electrical Home Runs – INT-L2
NA
NA
SBB (Lot 8)
Insulate Test Hot/Cold Supply & Return Mech Lines – INT-L2
NA
NA
SBB (Lot 8)
Install Conduit – ELEC-L2
NA
NA
SBB (Lot 8)
Install O/H Hot/Cold Supply & Return Branch Mech Lines & Seismic – INT-L3
NA
NA
SBB (Lot 8)
Install O/H Electrical Home Runs – INT-L3
NA
NA
SBB (Lot 8)
Install Ductwork Insulation – INT-L3
NA
NA
SBB (Lot 8)
Install O/H Supply & Return Ductwork Branch & Seismic – INT-L4
NA
NA
SBB (Lot 8)
Install Lights and Receptacles - ELEV
NA
NA
SBB (Lot 8)
F/R/P Site Walls – Anderson Park
NA
NA
Week of March 11, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install PV Panel System - South of E Line
NA
NA
SBB (Lot 8)
Curtain Wall – Frames – EXT-L1
NA
NA
SBB (Lot 8)
Set Thin Brick – EXT-L1
NA
NA
SBB (Lot 8)
Punched Openings – Glass – EXT-NE
NA
NA
SBB (Lot 8)
Set Thin Brick – EXT-NE
NA
NA
SBB (Lot 8)
Punched Openings – Frames - EXT-SW
NA
NA
SBB (Lot 8)
F/R/P Stair Treads/Landings - EXT-SW
NA
NA
SBB (Lot 8)
Set Thin Brick - EXT-SW
NA
NA
SBB (Lot 8)
Hang 1st Side Drywall – INT-L1
NA
NA
SBB (Lot 8)
Pull Low Voltage Cable – INT-L1
NA
NA
SBB (Lot 8)
Pull Electrical – INT-L1
NA
NA
SBB (Lot 8)
Install Fire Sprinkler Mains, Branches & Seismic – INT-AUD
NA
NA
SBB (Lot 8)
Install O/H Waste & Vent – INT-AUD
NA
NA
SBB (Lot 8)
Install Conduit – ELEC-AUD
NA
NA
SBB (Lot 8)
Frame Remaining Walls, Soffits & Hard lids – INT-L2
NA
NA
SBB (Lot 8)
Install O/H Hot/Cold Supply & Return Branch Mech Lines & Seismic – INT-L3
NA
NA
SBB (Lot 8)
Install O/H Electrical Home Runs – INT-L3
NA
NA
SBB (Lot 8)
Install O/H Supply & Return Ductwork Branch & Seismic – INT-L4
NA
NA
SBB (Lot 8)
Set, Hook-up & Terminate MTS – Electrical
NA
NA
Week of March 18, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install PV Panel System - North of E Line
NA
NA
SBB (Lot 8)
Cement Board – EXT-L1
NA
NA
SBB (Lot 8)
Secondary Air Barrier– EXT-L1
NA
NA
SBB (Lot 8)
Drainage Layer– EXT-NE
NA
NA
SBB (Lot 8)
Cement Board– EXT-NE
NA
NA
SBB (Lot 8)
Secondary Air Barrier– EXT-SW
NA
NA
SBB (Lot 8)
Erect Stairs– EXT-SW
NA
NA
SBB (Lot 8)
Install Communications Racks/Equipment -ELEC-L1
NA
NA
SBB (Lot 8)
Controls Hook-up Equipment (Incl. Refrigerant Alarm) – MECH-L1
NA
NA
SBB (Lot 8)
Plumbing Piping, Hook-up & Insulation– MECH-L1
NA
NA
SBB (Lot 8)
Frame Remaining Walls, Soffits & Hard lids – INT-L1
NA
NA
SBB (Lot 8)
Install O/H Supply & Return Ductwork Branch & Seismic – INT-AUD
NA
NA
SBB (Lot 8)
Pull Electrical – INT-AUD
NA
NA
SBB (Lot 8)
Pull Low Voltage Cable – INT-AUD
NA
NA
SBB (Lot 8)
Install Conduit – ELEC-AUD
NA
NA
SBB (Lot 8)
Install Conduit – ELEC-L2
NA
NA
SBB (Lot 8)
Hang 2nd Side Drywall & Inspect - INT-L2
NA
NA
SBB (Lot 8)
Pull Low Voltage Cable- INT-L2
NA
NA
SBB (Lot 8)
Install Backing – RR-L2
NA
NA
SBB (Lot 8)
Install Insulation and Inspect – RR-L2
NA
NA
SBB (Lot 8)
Hang Drywall & Inspect– RR-L2
NA
NA
SBB (Lot 8)
Install Conduit – ELEC-L3
NA
NA
SBB (Lot 8)
Install Hardlid Electrical – INT-L3
NA
NA
SBB (Lot 8)
Install In-Wall Plumbing – INT-L3
NA
NA
SBB (Lot 8)
Install In-Wall & Hard lid Electrical– RR-L3
NA
NA
SBB (Lot 8)
Install Backing– RR-L3
NA
NA
SBB (Lot 8)
Install O/H Mechanical Equipment & Ductwork Mains & Seismic – INT-L4
NA
NA
SBB (Lot 8)
Install Conduit – ELEC-L4
NA
NA
SBB (Lot 8)
Install In-Wall & Branch Electrical – INT-L4
NA
NA
SBB (Lot 8)
Install In-Wall Low Voltage – INT-L4
NA
NA
SBB (Lot 8)
Install Hardlid Electrical – INT-L4
NA
NA
SBB (Lot 8)
Machine Room Wiring, Start-up, Running Platform - ELEV
NA
NA
SBB (Lot 8)
F/R/P Site Walls – SITE-AP
NA
NA
SBB (Lot 8)
Install Site Lighting Underground – SITE-AP
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #68
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Electrical Hook-up Equipment
NA
NA
SBB (Lot 8)
Install PV Panel Secondary Framing - North of E Line
Crane
Noise Due to Equipment
SBB (Lot 8)
HVAC Piping, Hook-up & Insulation
NA
NA
SBB (Lot 8)
Flashings / Window Surrounds – EXT-L1
NA
NA
SBB (Lot 8)
Drainage Layer – EXT-L1
NA
NA
SBB (Lot 8)
Cement Board – EXT-L1
NA
NA
SBB (Lot 8)
Rigid Insulation & Air Water Barrier – EXT-NE
NA
NA
SBB (Lot 8)
Field Measure for Curtain Wall – EXT-NE
NA
NA
SBB (Lot 8)
Flashings / Window Surrounds – EXT-SW
NA
NA
SBB (Lot 8)
Drainage Layer – EXT-SW
NA
NA
SBB (Lot 8)
Install O/H Electrical Home Runs – INT-L1
NA
NA
SBB (Lot 8)
Install Ductwork Insulation – INT-L1
NA
NA
SBB (Lot 8)
HVAC Ductwork, Hook-up & Insulation – MECH-L1
NA
NA
SBB (Lot 8)
Controls Hook-up Equipment – MECH-L1
NA
NA
SBB (Lot 8)
HVAC Piping, Hook-up & Insulation – MECH-L1
NA
NA
SBB (Lot 8)
Plumbing Piping, Hook-up & Insulation – MECH-L1
NA
NA
SBB (Lot 8)
Install Hot/Cold Domestic Water Lines & Seismic – MECH-L1
NA
NA
SBB (Lot 8)
Tape Walls – MECH-L1
NA
NA
SBB (Lot 8)
Install O/H Supply & Return Ductwork Branch & Seismic – INT-L2
NA
NA
SBB (Lot 8)
Install Hot/Cold Domestic Water Lines & Seismic – INT-L3
NA
NA
SBB (Lot 8)
Install O/H Waste & Vent – INT-L3
NA
NA
SBB (Lot 8)
Install O/H Mechanical Equipment & Ductwork Mains & Seismic – INT-L3
NA
NA
SBB (Lot 8)
Tape Walls – ELEC-L3
NA
NA
Week of March 4, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
HVAC Ductwork, Hook-up & Insulation
NA
NA
SBB (Lot 8)
Stuff & Spray Deck Edge
NA
NA
SBB (Lot 8)
Install PV Panel System - South of E Line
Crane
Noise Due to Equipment
SBB (Lot 8)
Curtain Wall – Frames – EXT-L1
NA
NA
SBB (Lot 8)
Set Thin Brick – EXT-L1
NA
NA
SBB (Lot 8)
Curtain Wall – Frames – EXT-NE
NA
NA
SBB (Lot 8)
Punched Openings – Glass – EXT-NE
NA
NA
SBB (Lot 8)
Secondary Air Barrier – EXT-SW
NA
NA
SBB (Lot 8)
F/R/P Stair Treads/Landings – EXT-SW
NA
NA
SBB (Lot 8)
HVAC Piping, Hook-up & Insulation – MECH-L1
NA
NA
SBB (Lot 8)
Plumbing Piping, Hook-up & Insulation – MECH-L1
NA
NA
SBB (Lot 8)
Pull Low Voltage Cable – INT-L1
NA
NA
SBB (Lot 8)
Pull Electrical – INT-L1
NA
NA
SBB (Lot 8)
Install O/H Mechanical Equipment & Ductwork Mains & Seismic – INT-AUD
NA
NA
SBB (Lot 8)
Install Conduit – ELEC-AUD
NA
NA
SBB (Lot 8)
Install O/H Electrical Home Runs – INT-L2
NA
NA
SBB (Lot 8)
Insulate Test Hot/Cold Supply & Return Mech Lines – INT-L2
NA
NA
SBB (Lot 8)
Install Conduit – ELEC-L2
NA
NA
SBB (Lot 8)
Install O/H Hot/Cold Supply & Return Branch Mech Lines & Seismic – INT-L3
NA
NA
SBB (Lot 8)
Install O/H Electrical Home Runs – INT-L3
NA
NA
SBB (Lot 8)
Install Ductwork Insulation – INT-L3
NA
NA
SBB (Lot 8)
Install O/H Supply & Return Ductwork Branch & Seismic – INT-L4
NA
NA
SBB (Lot 8)
Install Lights and Receptacles - ELEV
NA
NA
SBB (Lot 8)
F/R/P Site Walls – Anderson Park
NA
NA
Week of March 11, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install PV Panel System - South of E Line
Crane
Noise Due to Equipment
SBB (Lot 8)
Curtain Wall – Frames – EXT-L1
NA
NA
SBB (Lot 8)
Set Thin Brick – EXT-L1
NA
NA
SBB (Lot 8)
Punched Openings – Glass – EXT-NE
NA
NA
SBB (Lot 8)
Set Thin Brick – EXT-NE
NA
NA
SBB (Lot 8)
Punched Openings – Frames - EXT-SW
NA
NA
SBB (Lot 8)
F/R/P Stair Treads/Landings - EXT-SW
NA
NA
SBB (Lot 8)
Set Thin Brick - EXT-SW
NA
NA
SBB (Lot 8)
Hang 1st Side Drywall – INT-L1
NA
NA
SBB (Lot 8)
Pull Low Voltage Cable – INT-L1
NA
NA
SBB (Lot 8)
Pull Electrical – INT-L1
NA
NA
SBB (Lot 8)
Install Fire Sprinkler Mains, Branches & Seismic – INT-AUD
NA
NA
SBB (Lot 8)
Install O/H Waste & Vent – INT-AUD
NA
NA
SBB (Lot 8)
Install Conduit – ELEC-AUD
NA
NA
SBB (Lot 8)
Frame Remaining Walls, Soffits & Hard lids – INT-L2
NA
NA
SBB (Lot 8)
Install O/H Hot/Cold Supply & Return Branch Mech Lines & Seismic – INT-L3
NA
NA
SBB (Lot 8)
Install O/H Electrical Home Runs – INT-L3
NA
NA
SBB (Lot 8)
Install O/H Supply & Return Ductwork Branch & Seismic – INT-L4
NA
NA
SBB (Lot 8)
Set, Hook-up & Terminate MTS – Electrical
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #67
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Exterior Framing – East Elevation
NA
NA
SBB (Lot 8)
F/R/P Stair Treads/Landings – EXT-NE
NA
NA
SBB (Lot 8)
Exterior Framing - North Elevation – EXT-NE
NA
NA
SBB (Lot 8)
Rigid Insulation & Air Water Barrier – EXT-NE
NA
NA
SBB (Lot 8)
Field Measure for Curtain Wall – EXT-NE
NA
NA
SBB (Lot 8)
Flashings / Window Surrounds – EXT-NE
NA
NA
SBB (Lot 8)
Erect Steel Structure for Stairs – EXT-SW
NA
NA
SBB (Lot 8)
Rigid Insulation & Air Water Barrier– EXT-SW
NA
NA
SBB (Lot 8)
Exterior Framing - South Elevation– EXT-SW
NA
NA
SBB (Lot 8)
Field Measure for Curtain Wall– EXT-SW
NA
NA
SBB (Lot 8)
Flashings / Window Surrounds– EXT-SW
NA
NA
SBB (Lot 8)
Drainage Layer– EXT-SW
NA
NA
SBB (Lot 8)
Cement Board– EXT-SW
NA
NA
SBB (Lot 8)
Secondary Air Barrier– EXT-SW
NA
NA
SBB (Lot 8)
Erect Stairs– EXT-SW
NA
NA
SBB (Lot 8)
Install Ductwork Insulation– INT-L1
NA
NA
SBB (Lot 8)
Pressure Test Hot/Cold Supply & Return Mech Lines– INT-L1
NA
NA
SBB (Lot 8)
Insulate Test Hot/Cold Supply & Return Mech Lines– INT-L1
NA
NA
SBB (Lot 8)
HVAC Ductwork, Hook-up & Insulation – MECH-L1
NA
NA
SBB (Lot 8)
Controls Hook-up Equipment (Incl. Refrigerant Alarm) – MECH-L1
NA
NA
SBB (Lot 8)
HVAC Piping, Hook-up & Insulation – MECH-L1
NA
NA
SBB (Lot 8)
Plumbing Piping, Hook-up & Insulation – MECH-L1
NA
NA
SBB (Lot 8)
Set Distribution Board HDP-1A – MECH-L1
NA
NA
SBB (Lot 8)
Hang Drywall – INT-AUD
NA
NA
SBB (Lot 8)
Tape Walls – ELEC-AUD
NA
NA
SBB (Lot 8)
Fire Caulk Head of Wall – ELEC-AUD
NA
NA
SBB (Lot 8)
Prime & 1st Coat of Paint, Walls & Exposed Ceilings – ELEC-AUD
NA
NA
SBB (Lot 8)
Install Hot/Cold Supply & Return Mech Lines & Seismic – INT-L2
NA
NA
SBB (Lot 8)
Pressure Test Ductwork– INT-L2
NA
NA
SBB (Lot 8)
Install O/H Electrical Home Runs – INT-L2
NA
NA
SBB (Lot 8)
Tape Walls – ELEC-L3
NA
NA
SBB (Lot 8)
Fire Caulk Head of Wall– ELEC-L3
NA
NA
SBB (Lot 8)
Fire Tape – INT-L4
NA
NA
SBB (Lot 8)
Fire Caulk Head of Wall – INT-L4
NA
NA
SBB (Lot 8)
Install O/H Waste and Vent – INT-L4
NA
NA
SBB (Lot 8)
Install Insulation and Inspect – ELEC-L4
NA
NA
SBB (Lot 8)
Hang Drywall and Inspect – ELEC-L4
NA
NA
SBB (Lot 8)
Tape Walls – ELEC-L4
NA
NA
Week of February 26, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Electrical Hook-up Equipment
NA
NA
SBB (Lot 8)
Install PV Panel Secondary Framing - North of E Line
Crane
Noise Due to Equipment
SBB (Lot 8)
HVAC Piping, Hook-up & Insulation
NA
NA
SBB (Lot 8)
Flashings / Window Surrounds – EXT-L1
NA
NA
SBB (Lot 8)
Drainage Layer – EXT-L1
NA
NA
SBB (Lot 8)
Cement Board – EXT-L1
NA
NA
SBB (Lot 8)
Rigid Insulation & Air Water Barrier – EXT-NE
NA
NA
SBB (Lot 8)
Field Measure for Curtain Wall – EXT-NE
NA
NA
SBB (Lot 8)
Flashings / Window Surrounds – EXT-SW
NA
NA
SBB (Lot 8)
Drainage Layer – EXT-SW
NA
NA
SBB (Lot 8)
Install O/H Electrical Home Runs – INT-L1
NA
NA
SBB (Lot 8)
Install Ductwork Insulation – INT-L1
NA
NA
SBB (Lot 8)
HVAC Ductwork, Hook-up & Insulation – MECH-L1
NA
NA
SBB (Lot 8)
Controls Hook-up Equipment – MECH-L1
NA
NA
SBB (Lot 8)
HVAC Piping, Hook-up & Insulation – MECH-L1
NA
NA
SBB (Lot 8)
Plumbing Piping, Hook-up & Insulation – MECH-L1
NA
NA
SBB (Lot 8)
Install Hot/Cold Domestic Water Lines & Seismic – MECH-L1
NA
NA
SBB (Lot 8)
Tape Walls – MECH-L1
NA
NA
SBB (Lot 8)
Install O/H Supply & Return Ductwork Branch & Seismic – INT-L2
NA
NA
SBB (Lot 8)
Install Hot/Cold Domestic Water Lines & Seismic – INT-L3
NA
NA
SBB (Lot 8)
Install O/H Waste & Vent – INT-L3
NA
NA
SBB (Lot 8)
Install O/H Mechanical Equipment & Ductwork Mains & Seismic – INT-L3
NA
NA
SBB (Lot 8)
Tape Walls – ELEC-L3
NA
NA
Week of March 4, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
HVAC Ductwork, Hook-up & Insulation
NA
NA
SBB (Lot 8)
Stuff & Spray Deck Edge
NA
NA
SBB (Lot 8)
Install PV Panel System - South of E Line
NA
NA
SBB (Lot 8)
Curtain Wall – Frames – EXT-L1
NA
NA
SBB (Lot 8)
Set Thin Brick – EXT-L1
NA
NA
SBB (Lot 8)
Curtain Wall – Frames – EXT-NE
NA
NA
SBB (Lot 8)
Punched Openings – Glass – EXT-NE
NA
NA
SBB (Lot 8)
Secondary Air Barrier – EXT-SW
NA
NA
SBB (Lot 8)
F/R/P Stair Treads/Landings – EXT-SW
NA
NA
SBB (Lot 8)
HVAC Piping, Hook-up & Insulation – MECH-L1
NA
NA
SBB (Lot 8)
Plumbing Piping, Hook-up & Insulation – MECH-L1
NA
NA
SBB (Lot 8)
Pull Low Voltage Cable – INT-L1
NA
NA
SBB (Lot 8)
Pull Electrical – INT-L1
NA
NA
SBB (Lot 8)
Install O/H Mechanical Equipment & Ductwork Mains & Seismic – INT-AUD
NA
NA
SBB (Lot 8)
Install Conduit – ELEC-AUD
NA
NA
SBB (Lot 8)
Install O/H Electrical Home Runs – INT-L2
NA
NA
SBB (Lot 8)
Insulate Test Hot/Cold Supply & Return Mech Lines – INT-L2
NA
NA
SBB (Lot 8)
Install Conduit – ELEC-L2
NA
NA
SBB (Lot 8)
Install O/H Hot/Cold Supply & Return Branch Mech Lines & Seismic – INT-L3
NA
NA
SBB (Lot 8)
Install O/H Electrical Home Runs – INT-L3
NA
NA
SBB (Lot 8)
Install Ductwork Insulation – INT-L3
NA
NA
SBB (Lot 8)
Install O/H Supply & Return Ductwork Branch & Seismic – INT-L4
NA
NA
SBB (Lot 8)
Install Lights and Receptacles - ELEV
NA
NA
SBB (Lot 8)
F/R/P Site Walls – Anderson Park
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #66
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install PV Panel Secondary Framing - South of E Line
Crane
Noise Due to Equipment
SBB (Lot 8)
Set Mechanical Equipment - Roof
Crane
Noise Due to Equipment
SBB (Lot 8)
Flashings / Window Surrounds – EXT-L1
NA
NA
SBB (Lot 8)
Drainage Layer – EXT-L1
NA
NA
SBB (Lot 8)
Cement Board – EXT-L1
NA
NA
SBB (Lot 8)
Exterior Framing – East Elevation
NA
NA
SBB (Lot 8)
F/R/P Stair Treads/Landings – EXT-NE
NA
NA
SBB (Lot 8)
Exterior Framing - North Elevation – EXT-NE
NA
NA
SBB (Lot 8)
Rigid Insulation & Air Water Barrier – EXT-NE
NA
NA
SBB (Lot 8)
Field Measure for Curtain Wall – EXT-NE
NA
NA
SBB (Lot 8)
Flashings / Window Surrounds – EXT-NE
NA
NA
SBB (Lot 8)
Erect Steel Structure for Stairs – EXT-SW
NA
NA
SBB (Lot 8)
Rigid Insulation & Air Water Barrier– EXT-SW
NA
NA
SBB (Lot 8)
Exterior Framing - South Elevation– EXT-SW
NA
NA
SBB (Lot 8)
Field Measure for Curtain Wall– EXT-SW
NA
NA
SBB (Lot 8)
Flashings / Window Surrounds– EXT-SW
NA
NA
SBB (Lot 8)
Drainage Layer– EXT-SW
NA
NA
SBB (Lot 8)
Cement Board– EXT-SW
NA
NA
SBB (Lot 8)
Secondary Air Barrier– EXT-SW
NA
NA
SBB (Lot 8)
Erect Stairs– EXT-SW
NA
NA
SBB (Lot 8)
Install O/H Hot/Cold Supply and Return Branch Mech Lines – INT-L1
NA
NA
SBB (Lot 8)
Install Ductwork Insulation– INT-L1
NA
NA
SBB (Lot 8)
Pressure Test Hot/Cold Supply & Return Mech Lines– INT-L1
NA
NA
SBB (Lot 8)
Insulate Test Hot/Cold Supply & Return Mech Lines– INT-L1
NA
NA
SBB (Lot 8)
HVAC Ductwork, Hook-up & Insulation – MECH-L1
NA
NA
SBB (Lot 8)
Controls Hook-up Equipment (Incl. Refrigerant Alarm) – MECH-L1
NA
NA
SBB (Lot 8)
HVAC Piping, Hook-up & Insulation – MECH-L1
NA
NA
SBB (Lot 8)
Plumbing Piping, Hook-up & Insulation – MECH-L1
NA
NA
SBB (Lot 8)
Set Distribution Board HDP-1A – MECH-L1
NA
NA
SBB (Lot 8)
Frame Remaining Walls, Soffits & Hard lids – INT-L1
NA
NA
SBB (Lot 8)
Install Insulation & Inspect - AUD
NA
NA
SBB (Lot 8)
Install Backing – ELEC-AUD
NA
NA
SBB (Lot 8)
Install Insulation & Inspect – ELEC-AUD
NA
NA
SBB (Lot 8)
Hang Drywall & Inspect – ELEC-AUD
NA
NA
SBB (Lot 8)
Install Hot/Cold Domestic Water Lines & Seismic – INT-L3
NA
NA
SBB (Lot 8)
Install O/H Waste & Vent – INT-L3
NA
NA
SBB (Lot 8)
Install O/H Mechanical Equipment & Ductwork Mains & Seismic – INT-L3
NA
NA
SBB (Lot 8)
Install Backing – ELEC-L3
NA
NA
SBB (Lot 8)
Install Insulation & Inspect – ELEC-L3
NA
NA
SBB (Lot 8)
Hang Drywall and Inspect – ELEC-L3
NA
NA
SBB (Lot 8)
Hang 1st Side Top Down Drywall – INT-L4
NA
NA
SBB (Lot 8)
Install Insulation and Inspect – INT-L4
NA
NA
SBB (Lot 8)
Hang 2nd Side Top Down Drywall & Inspect– INT-L4
NA
NA
SBB (Lot 8)
Install Mechanical / FSD's – ELEC-L4
NA
NA
SBB (Lot 8)
Install In-Wall Electrical – ELEC-L4
NA
NA
SBB (Lot 8)
Install Backing – ELEC-L4
NA
NA
Week of February 19, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Exterior Framing – East Elevation
NA
NA
SBB (Lot 8)
F/R/P Stair Treads/Landings – EXT-NE
NA
NA
SBB (Lot 8)
Exterior Framing - North Elevation – EXT-NE
NA
NA
SBB (Lot 8)
Rigid Insulation & Air Water Barrier – EXT-NE
NA
NA
SBB (Lot 8)
Field Measure for Curtain Wall – EXT-NE
NA
NA
SBB (Lot 8)
Flashings / Window Surrounds – EXT-NE
NA
NA
SBB (Lot 8)
Erect Steel Structure for Stairs – EXT-SW
NA
NA
SBB (Lot 8)
Rigid Insulation & Air Water Barrier– EXT-SW
NA
NA
SBB (Lot 8)
Exterior Framing - South Elevation– EXT-SW
NA
NA
SBB (Lot 8)
Field Measure for Curtain Wall– EXT-SW
NA
NA
SBB (Lot 8)
Flashings / Window Surrounds– EXT-SW
NA
NA
SBB (Lot 8)
Drainage Layer– EXT-SW
NA
NA
SBB (Lot 8)
Cement Board– EXT-SW
NA
NA
SBB (Lot 8)
Secondary Air Barrier– EXT-SW
NA
NA
SBB (Lot 8)
Erect Stairs– EXT-SW
NA
NA
SBB (Lot 8)
Install Ductwork Insulation– INT-L1
NA
NA
SBB (Lot 8)
Pressure Test Hot/Cold Supply & Return Mech Lines– INT-L1
NA
NA
SBB (Lot 8)
Insulate Test Hot/Cold Supply & Return Mech Lines– INT-L1
NA
NA
SBB (Lot 8)
HVAC Ductwork, Hook-up & Insulation – MECH-L1
NA
NA
SBB (Lot 8)
Controls Hook-up Equipment (Incl. Refrigerant Alarm) – MECH-L1
NA
NA
SBB (Lot 8)
HVAC Piping, Hook-up & Insulation – MECH-L1
NA
NA
SBB (Lot 8)
Plumbing Piping, Hook-up & Insulation – MECH-L1
NA
NA
SBB (Lot 8)
Set Distribution Board HDP-1A – MECH-L1
NA
NA
SBB (Lot 8)
Hang Drywall – INT-AUD
NA
NA
SBB (Lot 8)
Tape Walls – ELEC-AUD
NA
NA
SBB (Lot 8)
Fire Caulk Head of Wall – ELEC-AUD
NA
NA
SBB (Lot 8)
Prime & 1st Coat of Paint, Walls & Exposed Ceilings – ELEC-AUD
NA
NA
SBB (Lot 8)
Install Hot/Cold Supply & Return Mech Lines & Seismic – INT-L2
NA
NA
SBB (Lot 8)
Pressure Test Ductwork– INT-L2
NA
NA
SBB (Lot 8)
Install O/H Electrical Home Runs – INT-L2
NA
NA
SBB (Lot 8)
Tape Walls – ELEC-L3
NA
NA
SBB (Lot 8)
Fire Caulk Head of Wall– ELEC-L3
NA
NA
SBB (Lot 8)
Fire Tape – INT-L4
NA
NA
SBB (Lot 8)
Fire Caulk Head of Wall – INT-L4
NA
NA
SBB (Lot 8)
Install O/H Waste and Vent – INT-L4
NA
NA
SBB (Lot 8)
Install Insulation and Inspect – ELEC-L4
NA
NA
SBB (Lot 8)
Hang Drywall and Inspect – ELEC-L4
NA
NA
SBB (Lot 8)
Tape Walls – ELEC-L4
NA
NA
Week of February 26, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Electrical Hook-up Equipment
NA
NA
SBB (Lot 8)
Install PV Panel Secondary Framing - North of E Line
NA
NA
SBB (Lot 8)
HVAC Piping, Hook-up & Insulation
NA
NA
SBB (Lot 8)
Flashings / Window Surrounds – EXT-L1
NA
NA
SBB (Lot 8)
Drainage Layer – EXT-L1
NA
NA
SBB (Lot 8)
Cement Board – EXT-L1
NA
NA
SBB (Lot 8)
Rigid Insulation & Air Water Barrier – EXT-NE
NA
NA
SBB (Lot 8)
Field Measure for Curtain Wall – EXT-NE
NA
NA
SBB (Lot 8)
Flashings / Window Surrounds – EXT-SW
NA
NA
SBB (Lot 8)
Drainage Layer – EXT-SW
NA
NA
SBB (Lot 8)
Install O/H Electrical Home Runs – INT-L1
NA
NA
SBB (Lot 8)
Install Ductwork Insulation – INT-L1
NA
NA
SBB (Lot 8)
HVAC Ductwork, Hook-up & Insulation – MECH-L1
NA
NA
SBB (Lot 8)
Controls Hook-up Equipment – MECH-L1
NA
NA
SBB (Lot 8)
HVAC Piping, Hook-up & Insulation – MECH-L1
NA
NA
SBB (Lot 8)
Plumbing Piping, Hook-up & Insulation – MECH-L1
NA
NA
SBB (Lot 8)
Install Hot/Cold Domestic Water Lines & Seismic – MECH-L1
NA
NA
SBB (Lot 8)
Tape Walls – MECH-L1
NA
NA
SBB (Lot 8)
Install O/H Supply & Return Ductwork Branch & Seismic – INT-L2
NA
NA
SBB (Lot 8)
Install Hot/Cold Domestic Water Lines & Seismic – INT-L3
NA
NA
SBB (Lot 8)
Install O/H Waste & Vent – INT-L3
NA
NA
SBB (Lot 8)
Install O/H Mechanical Equipment & Ductwork Mains & Seismic – INT-L3
NA
NA
SBB (Lot 8)
Tape Walls – ELEC-L3
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #65
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install PV Panel Structural Steel
Crane
Noise Due to Equipment
SBB (Lot 8)
Erect Stairs – EXT-NE
NA
NA
SBB (Lot 8)
Install Metal Decking – EXT-SW
NA
NA
SBB (Lot 8)
Install O/H Supply and Return Ductwork – L1
NA
NA
SBB (Lot 8)
Install O/H Supply and Return Mech Lines –L1
NA
NA
SBB (Lot 8)
Pressure Test Ductwork – INT-L1
NA
NA
SBB (Lot 8)
Tape Walls – ELEC-L1
NA
NA
SBB (Lot 8)
Fire Caulk Head of Wall – ELEC-L1
NA
NA
SBB (Lot 8)
Install In-Wall Plumbing – AUD
NA
NA
SBB (Lot 8)
Install Storm, Overflow, Sewer Lines and Seismic – AUD
NA
NA
SBB (Lot 8)
Install Mechanical / FSD’s – ELEC-AUD
NA
NA
SBB (Lot 8)
Install In-Wall Electrical – ELEC-AUD
NA
NA
SBB (Lot 8)
Install O/H Waste and Vent – INT-L2
NA
NA
SBB (Lot 8)
Install O/H Supply and Return Ductwork – INT-L2
NA
NA
SBB (Lot 8)
Tape Walls – ELEC-L2
NA
NA
SBB (Lot 8)
Fire Caulk Head of Wall – ELEC-L2
NA
NA
SBB (Lot 8)
Install Early MEP to Support Top Down Drywall - INT-L3
NA
NA
SBB (Lot 8)
Hang 1st Side Top Down Drywall - INT-L3
NA
NA
SBB (Lot 8)
Install Insulation & Inspect - INT-L3
NA
NA
SBB (Lot 8)
Fire Tape - INT-L3
NA
NA
SBB (Lot 8)
Fire Caulk Head of Wall - INT-L3
NA
NA
SBB (Lot 8)
Install Mechanical / FSD's – ELEC-L3
NA
NA
SBB (Lot 8)
Install In-Wall Electrical – ELEC-L3
NA
NA
SBB (Lot 8)
Frame Interference Walls & Install Door Frames – INT-L4
NA
NA
SBB (Lot 8)
Install Early MEP to Support Top Down Drywall – INT-L4
NA
NA
Week of February 12, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install PV Panel Secondary Framing - South of E Line
Crane
Noise Due to Equipment
SBB (Lot 8)
Set Mechanical Equipment - Roof
Crane
Noise Due to Equipment
SBB (Lot 8)
Flashings / Window Surrounds – EXT-L1
NA
NA
SBB (Lot 8)
Drainage Layer – EXT-L1
NA
NA
SBB (Lot 8)
Cement Board – EXT-L1
NA
NA
SBB (Lot 8)
Exterior Framing – East Elevation
NA
NA
SBB (Lot 8)
F/R/P Stair Treads/Landings – EXT-NE
NA
NA
SBB (Lot 8)
Exterior Framing - North Elevation – EXT-NE
NA
NA
SBB (Lot 8)
Rigid Insulation & Air Water Barrier – EXT-NE
NA
NA
SBB (Lot 8)
Field Measure for Curtain Wall – EXT-NE
NA
NA
SBB (Lot 8)
Flashings / Window Surrounds – EXT-NE
NA
NA
SBB (Lot 8)
Erect Steel Structure for Stairs – EXT-SW
NA
NA
SBB (Lot 8)
Rigid Insulation & Air Water Barrier– EXT-SW
NA
NA
SBB (Lot 8)
Exterior Framing - South Elevation– EXT-SW
NA
NA
SBB (Lot 8)
Field Measure for Curtain Wall– EXT-SW
NA
NA
SBB (Lot 8)
Flashings / Window Surrounds– EXT-SW
NA
NA
SBB (Lot 8)
Drainage Layer– EXT-SW
NA
NA
SBB (Lot 8)
Cement Board– EXT-SW
NA
NA
SBB (Lot 8)
Secondary Air Barrier– EXT-SW
NA
NA
SBB (Lot 8)
Erect Stairs– EXT-SW
NA
NA
SBB (Lot 8)
Install O/H Hot/Cold Supply and Return Branch Mech Lines – INT-L1
NA
NA
SBB (Lot 8)
Install Ductwork Insulation– INT-L1
NA
NA
SBB (Lot 8)
Pressure Test Hot/Cold Supply & Return Mech Lines– INT-L1
NA
NA
SBB (Lot 8)
Insulate Test Hot/Cold Supply & Return Mech Lines– INT-L1
NA
NA
SBB (Lot 8)
HVAC Ductwork, Hook-up & Insulation – MECH-L1
NA
NA
SBB (Lot 8)
Controls Hook-up Equipment (Incl. Refrigerant Alarm) – MECH-L1
NA
NA
SBB (Lot 8)
HVAC Piping, Hook-up & Insulation – MECH-L1
NA
NA
SBB (Lot 8)
Plumbing Piping, Hook-up & Insulation – MECH-L1
NA
NA
SBB (Lot 8)
Set Distribution Board HDP-1A – MECH-L1
NA
NA
SBB (Lot 8)
Frame Remaining Walls, Soffits & Hard lids – INT-L1
NA
NA
SBB (Lot 8)
Install Insulation & Inspect - AUD
NA
NA
SBB (Lot 8)
Install Backing – ELEC-AUD
NA
NA
SBB (Lot 8)
Install Insulation & Inspect – ELEC-AUD
NA
NA
SBB (Lot 8)
Hang Drywall & Inspect – ELEC-AUD
NA
NA
SBB (Lot 8)
Install Hot/Cold Domestic Water Lines & Seismic – INT-L3
NA
NA
SBB (Lot 8)
Install O/H Waste & Vent – INT-L3
NA
NA
SBB (Lot 8)
Install O/H Mechanical Equipment & Ductwork Mains & Seismic – INT-L3
NA
NA
SBB (Lot 8)
Install Backing – ELEC-L3
NA
NA
SBB (Lot 8)
Install Insulation & Inspect – ELEC-L3
NA
NA
SBB (Lot 8)
Hang Drywall and Inspect – ELEC-L3
NA
NA
SBB (Lot 8)
Hang 1st Side Top Down Drywall – INT-L4
NA
NA
SBB (Lot 8)
Install Insulation and Inspect – INT-L4
NA
NA
SBB (Lot 8)
Hang 2nd Side Top Down Drywall & Inspect– INT-L4
NA
NA
SBB (Lot 8)
Install Mechanical / FSD's – ELEC-L4
NA
NA
SBB (Lot 8)
Install In-Wall Electrical – ELEC-L4
NA
NA
SBB (Lot 8)
Install Backing – ELEC-L4
NA
NA
Week of February 19, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Exterior Framing – East Elevation
NA
NA
SBB (Lot 8)
F/R/P Stair Treads/Landings – EXT-NE
NA
NA
SBB (Lot 8)
Exterior Framing - North Elevation – EXT-NE
NA
NA
SBB (Lot 8)
Rigid Insulation & Air Water Barrier – EXT-NE
NA
NA
SBB (Lot 8)
Field Measure for Curtain Wall – EXT-NE
NA
NA
SBB (Lot 8)
Flashings / Window Surrounds – EXT-NE
NA
NA
SBB (Lot 8)
Erect Steel Structure for Stairs – EXT-SW
NA
NA
SBB (Lot 8)
Rigid Insulation & Air Water Barrier– EXT-SW
NA
NA
SBB (Lot 8)
Exterior Framing - South Elevation– EXT-SW
NA
NA
SBB (Lot 8)
Field Measure for Curtain Wall– EXT-SW
NA
NA
SBB (Lot 8)
Flashings / Window Surrounds– EXT-SW
NA
NA
SBB (Lot 8)
Drainage Layer– EXT-SW
NA
NA
SBB (Lot 8)
Cement Board– EXT-SW
NA
NA
SBB (Lot 8)
Secondary Air Barrier– EXT-SW
NA
NA
SBB (Lot 8)
Erect Stairs– EXT-SW
NA
NA
SBB (Lot 8)
Install Ductwork Insulation– INT-L1
NA
NA
SBB (Lot 8)
Pressure Test Hot/Cold Supply & Return Mech Lines– INT-L1
NA
NA
SBB (Lot 8)
Insulate Test Hot/Cold Supply & Return Mech Lines– INT-L1
NA
NA
SBB (Lot 8)
HVAC Ductwork, Hook-up & Insulation – MECH-L1
NA
NA
SBB (Lot 8)
Controls Hook-up Equipment (Incl. Refrigerant Alarm) – MECH-L1
NA
NA
SBB (Lot 8)
HVAC Piping, Hook-up & Insulation – MECH-L1
NA
NA
SBB (Lot 8)
Plumbing Piping, Hook-up & Insulation – MECH-L1
NA
NA
SBB (Lot 8)
Set Distribution Board HDP-1A – MECH-L1
NA
NA
SBB (Lot 8)
Hang Drywall – INT-AUD
NA
NA
SBB (Lot 8)
Tape Walls – ELEC-AUD
NA
NA
SBB (Lot 8)
Fire Caulk Head of Wall – ELEC-AUD
NA
NA
SBB (Lot 8)
Prime & 1st Coat of Paint, Walls & Exposed Ceilings – ELEC-AUD
NA
NA
SBB (Lot 8)
Install Hot/Cold Supply & Return Mech Lines & Seismic – INT-L2
NA
NA
SBB (Lot 8)
Pressure Test Ductwork– INT-L2
NA
NA
SBB (Lot 8)
Install O/H Electrical Home Runs – INT-L2
NA
NA
SBB (Lot 8)
Tape Walls – ELEC-L3
NA
NA
SBB (Lot 8)
Fire Caulk Head of Wall– ELEC-L3
NA
NA
SBB (Lot 8)
Fire Tape – INT-L4
NA
NA
SBB (Lot 8)
Fire Caulk Head of Wall – INT-L4
NA
NA
SBB (Lot 8)
Install O/H Waste and Vent – INT-L4
NA
NA
SBB (Lot 8)
Install Insulation and Inspect – ELEC-L4
NA
NA
SBB (Lot 8)
Hang Drywall and Inspect – ELEC-L4
NA
NA
SBB (Lot 8)
Tape Walls – ELEC-L4
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #64
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
INSTALL PV STRUCTURAL STEEL
NA
NA
SBB (Lot 8)
PROCURE EXTERIOR FLASHINGS
NA
NA
SBB (Lot 8)
WEATHER BARRIER – EXT-NE
NA
NA
SBB (Lot 8)
ERECT STAIR – EXT-NE
NA
NA
SBB (Lot 8) Concrete
EXTERIOR FRAMING – EXT-NE
NA
NA
SBB (Lot 8)
INSTALL METAL DECKING – EXT-SW
NA
NA
SBB (Lot 8)
INSTALL HOT/COLD DOMESTIC WATER LINES AND SEISMIC – INT-L1
NA
NA
SBB (Lot 8)
INSTALL O/H SUPPLY AND RETURN DUCTWORK BRANCH AND SEISMIC – INT-L1
NA
NA
SBB (Lot 8)
PRESSURE TEST DUCTOWRK – INT-L1
NA
NA
SBB (Lot 8)
INSTALL O/H ELECTRICAL HOME RUNS – INT-L1
NA
NA
SBB (Lot 8)
FIRE CAULKING HEAD OF WALL – ELEC-L1
NA
NA
SBB (Lot 8)
INSTALL IN-WALL AND BRANCH ELECTRICAL – AUDITORIUM
NA
NA
SBB (Lot 8)
INSTALL IN-WALL LOW VOLTAGE – AUDITORIUM
NA
NA
SBB (Lot 8)
INSTALL IN-WALL PLUMBING – AUDITORIUM
NA
NA
SBB (Lot 8)
INSTALL INSULATION AND INSPECT – AUDITORIUM
NA
NA
SBB (Lot 8)
INSTALL MECHANICAL / FSD’s – AUDITORIUM
NA
NA
SBB (Lot 8)
INSTALL O/H WASTE AND VENT – ELEC-L2
NA
NA
SBB (Lot 8)
HANG DRYWALL AND INSPECT – ELEC-L2
NA
NA
SBB (Lot 8)
INSTALL INSULATION AND INSPECT – ELECT-L2
NA
NA
SBB (Lot 8)
TAPE WALLS – ELECT-L2
NA
NA
SBB (Lot 8)
INSTALL EARLY MEP TO SUPPORT TOP DOWN DRYWALL – INT-L3
NA
NA
SBB (Lot 8)
HANG 1ST SIDE TOP-DOWN DRYWALL – INT-L3
NA
NA
SBB (Lot 8)
HANG 2ND SIDE TOP-DOWN DRYWALL AND INSPECT – INT-L3
NA
NA
SBB (Lot 8)
INSTALL INSULATION AND INSPECT – INT-L3
NA
NA
SBB (Lot 8)
FIRE TAPE – INT-L3
NA
NA
SBB (Lot 8)
FIRE CAULKING HEAD OF WALL – INT-L3
NA
NA
SBB (Lot 8)
INSTALL MECHANICAL / FSD’s – ELEC-L3
NA
NA
SBB (Lot 8)
INSTALL IN-WALL ELECTRICAL – ELEC-L3
NA
NA
SBB (Lot 8)
INSTALL BACKING – ELEC-L3
NA
NA
SBB (Lot 8)
INSTALL EARLY MEP TO SUPPORT TOP-DOWN DRYWALL – INT-L4
NA
NA
SBB (Lot 8)
HANG 1ST SIDE TOP-DOWN DRYWALL – INT-L4
NA
NA
SBB (Lot 8)
INSTALL INSULATION AND INSPECT – INT-L4
NA
NA
SBB (Lot 8)
F/R/P TRANSFORMER YARD SLAB
Concrete Pump
Noise due to equipment
Week of February 5, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
INSTALL ROOFING AT MECHANICAL EQUIPMETN PAD
NA
NA
SBB (Lot 8)
INSTALL PV PANEL SECONDARY FRAMING
NA
NA
SBB (Lot 8)
FLASHING / WINDOW SURROUNDS – EXT-L1
NA
NA
SBB (Lot 8)
DRAINING LAYER – EXT-L1
NA
NA
SBB (Lot 8)
PRECAST PANELS – EXT-L1
NA
NA
SBB (Lot 8)
F/R/P TAIR TREAD/LANDINGS – EXT-NE
NA
NA
SBB (Lot 8)
EXTERIOR FRAMING – NORTH ELEVATION
NA
NA
SBB (Lot 8)
RIGID INSULATION AND AIR WATER BARRIER – EXT-NE
NA
NA
SBB (Lot 8)
ERECT STEEL STRUCTURE FOR STAIRS – EXT-SW
NA
NA
SBB (Lot 8)
INSTALL O/H HOT/COLD SUPPLY AND RETURN BRANCH MECH LINES – INT-L1
NA
NA
SBB (Lot 8)
INSTALL DUCTWORK INSULATION – INT-L1
NA
NA
SBB (Lot 8)
PRESSURE TEST HOT/COLD SUPPLY AND RETURN MECH LINES – INT-L1
NA
NA
SBB (Lot 8)
PRIME AND 1ST COAT OF PAINT, WALLS, AND EXPOSED CEILINGS – ELEC-L1
NA
NA
SBB (Lot 8)
INSTALL ELECTRICAL GEAR – ELEC-L1
NA
NA
SBB (Lot 8)
HANG DRYWALL – AUDITORIUM
NA
NA
SBB (Lot 8)
INSTALL IN-WALL ELECTRICAL – ELEC-AUD
NA
NA
SBB (Lot 8)
INSTALL BACKING – ELEC-AUD
NA
NA
SBB (Lot 8)
INSTALL INSULATION AND INSEPCT – ELEC-AUD
NA
NA
SBB (Lot 8)
HANG DRYWALL AND INSPECT – ELEC-AUD
NA
NA
SBB (Lot 8)
INSTALL O/H SUPPLY AND RETURN DUCTOWRK BRANCH AND SEISMIC – INT-L2
NA
NA
SBB (Lot 8)
FIRE CAULKING HEAD OF WALL – ELEC-L2
NA
NA
SBB (Lot 8)
PRIME AND FIRST COAT OF PAINT WALLS AND EXPOSED CEILINGS – ELEC-L2
NA
NA
SBB (Lot 8)
INSTALL HOT/COLD DOMESTIC WATER LINES – INT-L3
NA
NA
SBB (Lot 8)
INSTALL O/H WASTE AND VENT – INT-L3
NA
NA
SBB (Lot 8)
INSTALL O/H MECH EQUIPMENT AND DUCTWORK MAINS AND SEISMIC – INT-L3
NA
NA
SBB (Lot 8)
INSTALL INSULATION AND INSPECT – ELEC-L3
NA
NA
SBB (Lot 8)
HANG DRYWALL AND INSPECT – ELEC-L3
NA
NA
SBB (Lot 8)
TAPE WALLS – ELEC-L3
NA
NA
SBB (Lot 8)
HANG 2ND SIDE TOP DOWN DRYWALL AND INSPECT – INT-L4
NA
NA
SBB (Lot 8)
FIRE TAPE – INT-L4
NA
NA
SBB (Lot 8)
FIRE CAULKING HEAD OF WALL – INT-L4
NA
NA
SBB (Lot 8)
INSTALL MECHANICAL / FSD’s – ELEC-L4
NA
NA
SBB (Lot 8)
ISTALL IN-WALL ELECTRICAL – ELEC-L4
NA
NA
SBB (Lot 8)
INSTALL BACKING – ELEC-L4
NA
NA
Week of February 12, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
SET MECHANICAL EQUIPMENT – ROOF
NA
NA
SBB (Lot 8)
ELECTRICAL HOOKUP EQUPMENT – ROOF
NA
NA
SBB (Lot 8)
INSTALL PV PANEL SECONDARY FRAMING – ROOF
NA
NA
SBB (Lot 8)
FLASHING / WINDOW SURROUNDS – EXT-L1
NA
NA
SBB (Lot 8)
DRAINAGE LAYER – EXT-L1
NA
NA
SBB (Lot 8)
CEMENT BOARD – EXT-L1
NA
NA
SBB (Lot 8)
ELECRCIAL ROUGH-IN SOFFITS – EXT-L1
NA
NA
SBB (Lot 8)
SOFFIT SHEATHING – EXT-L1
NA
NA
SBB (Lot 8)
F/R/P STAIR TREADS / LANDINGS
NA
NA
SBB (Lot 8)
EXTERIOR FRAMING – NORTH ELECATION – EXT-L1
NA
NA
SBB (Lot 8)
RIGID INSULATION AND AIR WATER BARRIER – EXT-NE
NA
NA
SBB (Lot 8)
FIELD MEASURE FOR CURTAIN WALL – EXT-NE
NA
NA
SBB (Lot 8)
ERRECT STEEL STRUCTURE FOR STAIRS
NA
NA
SBB (Lot 8)
RIGID INSULATION AND AIR WATER BARRIER – EXT-SW
NA
NA
SBB (Lot 8)
EXTERIOR FRAMING – SOUTH ELEVATION
NA
NA
SBB (Lot 8)
FIELD MEASURE FOR CURTAIN WALL
NA
NA
SBB (Lot 8)
FLASHINGS / WINDOW SURROUNDS – EXT-SW
NA
NA
SBB (Lot 8)
INSTALL O/H ELECTRICAL HOME RUNS – INT-L1
NA
NA
SBB (Lot 8)
INSTALL O/H HOT/COLD SUPPLY AND RETURN BRNCH MECH LINES – INT-L1
NA
NA
SBB (Lot 8)
INSTALL DUCTWORK INSULATION – INT-L1
NA
NA
SBB (Lot 8)
PRESSURE TEST HOT/COLD SUPPLY AND RETURN MECH LINES – INT-L1
NA
NA
SBB (Lot 8)
SET MECHANICAL AND PLUMBING EQUIPMENT – MECH-L1
NA
NA
SBB (Lot 8)
HVAC DUCTWORK, HOOKUP, AND INSULATION – MECH-L1
NA
NA
SBB (Lot 8)
CONTROLS HOOK-UP EQUIPMENT – MECH-L1
NA
NA
SBB (Lot 8)
HANG DRYWALL AND INSPECT – ELEC-L3
NA
NA
SBB (Lot 8)
TAPE WALLS – ELEC-L3
NA
NA
SBB (Lot 8)
HANG 1ST SIDE TOP DOWN DRYWALL – INT-L4
NA
NA
SBB (Lot 8)
INSTALL INSULATION AND INSPECT – INT-L4
NA
NA
SBB (Lot 8)
HANG 2ND SIDE TOP DOWN DRYWALL AND INSPECT – INT-L4
NA
NA
SBB (Lot 8)
FIRE TAPE – INT-L4
NA
NA
SBB (Lot 8)
FIRE CAULK HEAD OF WALL – INT-L4
NA
NA
SBB (Lot 8)
INSTALL IN-WALL ELECTRICAL – ELEC-L4
NA
NA
SBB (Lot 8)
INSTALL BACKING – ELEC-L4
NA
NA
SBB (Lot 8)
INSTALL COMMUNICATIONS DUCTBANK AND VAULT FROM MH-14 TO SBB POC
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #63
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
INSTALL MECHANICAL DUCT / PIPE SUPPORTS - ROOF
NA
NA
SBB (Lot 8)
RIGID INSULATION AND AIR WATER BARRIER – EXT-L1
NA
NA
SBB (Lot 8)
FIELD MEASURE FOR CURTAIN WALL – EXT-L1
NA
NA
SBB (Lot 8)
SOFFIT SHEATHING – EXT-L1
NA
NA
SBB (Lot 8) Concrete
SET SCAFFOLDS FOR LEVEL TO ROOF – EXT-NE
NA
NA
SBB (Lot 8)
MISC IN-WALL STEEL FOR CANOPY – EXT-NE
NA
NA
SBB (Lot 8)
ERECT STEEL STRUCTURE FOR STAIRS – EXT-NE
NA
NA
SBB (Lot 8)
ERECT SCAFFOLD EAST ELEVATION – EXT-NE
NA
NA
SBB (Lot 8)
SET SCAFFOLD FOR LEVEL 3 TO ROOF
NA
NA
SBB (Lot 8)
INSTALL IN-WALL ELECTRICAL – ELEC-L1
NA
NA
SBB (Lot 8)
INSTALL INSULATION AND ISNEPCT – ELEC-L1
NA
NA
SBB (Lot 8)
HANG DRYWALL AND ISNTEPCT – ELEC-L1
NA
NA
SBB (Lot 8)
TAPE WALLS – ELEC-L1
NA
NA
SBB (Lot 8)
SET MECHANICAL AND PLUMBING EQUIPMENT – MECH-L1
NA
NA
SBB (Lot 8)
FRAME WALLS – AUDITORIUM
NA
NA
SBB (Lot 8)
TOP-DOWN DRYWALL AND HEAD OF WALL – AUDITORIUM
NA
NA
SBB (Lot 8)
FIRE TAPE – INT-L2
NA
NA
SBB (Lot 8)
FIRE CAULK HEAD OF WALL – INT-L2
NA
NA
SBB (Lot 8)
INSTALL HOT/COLD DOMESTIC WATER LINES AND SEISMIC – INT-L2
NA
NA
SBB (Lot 8)
INSTALL O/H MECHANICAL EQUIPMENT AND DUCTWORK MAINS AND SEISMIC – INT-L2
NA
NA
SBB (Lot 8)
INSTALL MECHANICAL / FSDs – ELEC-L2
NA
NA
SBB (Lot 8)
INSTALL BACKING – ELEC-L2
NA
NA
SBB (Lot 8)
FRAME INTERFERENCE WALLS AND INSTALL DOOR FRAMES – INT-L3
NA
NA
SBB (Lot 8)
INSTALL FIRE SPRINKLER MAINS, BRANCHES, AND SEISIC – INT-L3
NA
NA
SBB (Lot 8)
INSTALL STORM, OVERFLOW, SEWER LINES, AND SEISMIC – INT-L3
NA
NA
SBB (Lot 8)
TRANSFORMER YARD FENCE FOOTING
NA
NA
Week of January 29, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
INSTALL PV STRUCTURAL STEEL NA
NA
SBB (Lot 8)
PROCURE EXTERIOR FLASHINGS NA
NA
SBB (Lot 8)
WEATHER BARRIER – EXT-NE NA
NA
SBB (Lot 8)
ERECT STAIR – EXT-NE NA
NA
SBB (Lot 8)
EXTERIOR FRAMING – EXT-NE NA
NA
SBB (Lot 8)
INSTALL METAL DECKING – EXT-SW NA
NA
SBB (Lot 8)
INSTALL HOT/COLD DOMESTIC WATER LINES AND SEISMIC – INT-L1 NA
NA
SBB (Lot 8)
INSTALL O/H SUPPLY AND RETURN DUCTWORK BRANCH AND SEISMIC – INT-L1 NA
NA
SBB (Lot 8)
PRESSURE TEST DUCTOWRK – INT-L1 NA
NA
SBB (Lot 8)
INSTALL O/H ELECTRICAL HOME RUNS – INT-L1 NA
NA
SBB (Lot 8)
FIRE CAULKING HEAD OF WALL – ELEC-L1 NA
NA
SBB (Lot 8)
INSTALL IN-WALL AND BRANCH ELECTRICAL – AUDITORIUM NA
NA
SBB (Lot 8)
INSTALL IN-WALL LOW VOLTAGE – AUDITORIUM NA
NA
SBB (Lot 8)
INSTALL IN-WALL PLUMBING – AUDITORIUM NA
NA
SBB (Lot 8)
INSTALL INSULATION AND INSPECT – AUDITORIUM NA
NA
SBB (Lot 8)
INSTALL MECHANICAL / FSD’s – AUDITORIUM NA
NA
SBB (Lot 8)
INSTALL O/H WASTE AND VENT – ELEC-L2 NA
NA
SBB (Lot 8)
HANG DRYWALL AND INSPECT – ELEC-L2 NA
NA
SBB (Lot 8)
INSTALL INSULATION AND INSPECT – ELECT-L2 NA
NA
SBB (Lot 8)
TAPE WALLS – ELECT-L2 NA
NA
SBB (Lot 8)
INSTALL EARLY MEP TO SUPPORT TOP DOWN DRYWALL – INT-L3 NA
NA
SBB (Lot 8)
HANG 1ST SIDE TOP-DOWN DRYWALL – INT-L3 NA
NA
SBB (Lot 8)
HANG 2ND SIDE TOP-DOWN DRYWALL AND INSPECT – INT-L3 NA
NA
SBB (Lot 8)
INSTALL INSULATION AND INSPECT – INT-L3 NA
NA
SBB (Lot 8)
FIRE TAPE – INT-L3 NA
NA
SBB (Lot 8)
FIRE CAULKING HEAD OF WALL – INT-L3 NA
NA
SBB (Lot 8)
INSTALL MECHANICAL / FSD’s – ELEC-L3 NA
NA
SBB (Lot 8)
INSTALL IN-WALL ELECTRICAL – ELEC-L3 NA
NA
SBB (Lot 8)
INSTALL BACKING – ELEC-L3 NA
NA
SBB (Lot 8)
INSTALL EARLY MEP TO SUPPORT TOP-DOWN DRYWALL – INT-L4 NA
NA
SBB (Lot 8)
HANG 1ST SIDE TOP-DOWN DRYWALL – INT-L4 NA
NA
SBB (Lot 8)
INSTALL INSULATION AND INSPECT – INT-L4 NA
NA
SBB (Lot 8)
F/R/P TRANSFORMER YARD SLAB NA
NA
Week of February 5, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
INSTALL ROOFING AT MECHANICAL EQUIPMETN PAD
NA
NA
SBB (Lot 8)
INSTALL PV PANEL SECONDARY FRAMING
NA
NA
SBB (Lot 8)
FLASHING / WINDOW SURROUNDS – EXT-L1
NA
NA
SBB (Lot 8)
DRAINING LAYER – EXT-L1
NA
NA
SBB (Lot 8)
PRECAST PANELS – EXT-L1
NA
NA
SBB (Lot 8)
F/R/P TAIR TREAD/LANDINGS – EXT-NE
NA
NA
SBB (Lot 8)
EXTERIOR FRAMING – NORTH ELEVATION
NA
NA
SBB (Lot 8)
RIGID INSULATION AND AIR WATER BARRIER – EXT-NE
NA
NA
SBB (Lot 8)
ERECT STEEL STRUCTURE FOR STAIRS – EXT-SW
NA
NA
SBB (Lot 8)
INSTALL O/H HOT/COLD SUPPLY AND RETURN BRANCH MECH LINES – INT-L1
NA
NA
SBB (Lot 8)
INSTALL DUCTWORK INSULATION – INT-L1
NA
NA
SBB (Lot 8)
PRESSURE TEST HOT/COLD SUPPLY AND RETURN MECH LINES – INT-L1
NA
NA
SBB (Lot 8)
PRIME AND 1ST COAT OF PAINT, WALLS, AND EXPOSED CEILINGS – ELEC-L1
NA
NA
SBB (Lot 8)
INSTALL ELECTRICAL GEAR – ELEC-L1
NA
NA
SBB (Lot 8)
HANG DRYWALL – AUDITORIUM
NA
NA
SBB (Lot 8)
INSTALL IN-WALL ELECTRICAL – ELEC-AUD
NA
NA
SBB (Lot 8)
INSTALL BACKING – ELEC-AUD
NA
NA
SBB (Lot 8)
INSTALL INSULATION AND INSEPCT – ELEC-AUD
NA
NA
SBB (Lot 8)
HANG DRYWALL AND INSPECT – ELEC-AUD
NA
NA
SBB (Lot 8)
INSTALL O/H SUPPLY AND RETURN DUCTOWRK BRANCH AND SEISMIC – INT-L2
NA
NA
SBB (Lot 8)
FIRE CAULKING HEAD OF WALL – ELEC-L2
NA
NA
SBB (Lot 8)
PRIME AND FIRST COAT OF PAINT WALLS AND EXPOSED CEILINGS – ELEC-L2
NA
NA
SBB (Lot 8)
INSTALL HOT/COLD DOMESTIC WATER LINES – INT-L3
NA
NA
SBB (Lot 8)
INSTALL O/H WASTE AND VENT – INT-L3
NA
NA
SBB (Lot 8)
INSTALL O/H MECH EQUIPMENT AND DUCTWORK MAINS AND SEISMIC – INT-L3
NA
NA
SBB (Lot 8)
INSTALL INSULATION AND INSPECT – ELEC-L3
NA
NA
SBB (Lot 8)
HANG DRYWALL AND INSPECT – ELEC-L3
NA
NA
SBB (Lot 8)
TAPE WALLS – ELEC-L3
NA
NA
SBB (Lot 8)
HANG 2ND SIDE TOP DOWN DRYWALL AND INSPECT – INT-L4
NA
NA
SBB (Lot 8)
FIRE TAPE – INT-L4
NA
NA
SBB (Lot 8)
FIRE CAULKING HEAD OF WALL – INT-L4
NA
NA
SBB (Lot 8)
INSTALL MECHANICAL / FSD’s – ELEC-L4
NA
NA
SBB (Lot 8)
ISTALL IN-WALL ELECTRICAL – ELEC-L4
NA
NA
SBB (Lot 8)
INSTALL BACKING – ELEC-L4
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #62
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Concrete
F/R/P Walls at Transformer Yard
Crane and Concrete Pump
Noise due to equipment
SBB (Lot 8) Concrete
F/R/P Transformer Yard Slab
Crane and Concrete Pump
Noise due to equipment
SBB (Lot 8)
Vapor Retarder Sheet Air Barrier
NA
NA
SBB (Lot 8)
Flashing / Window Surrounds – Ext-L1
NA
NA
SBB (Lot 8)
Install Temp Roofing Low Roofs – Ext NE
NA
NA
SBB (Lot 8)
Erect Steel Structure for Stairs – Ext NE
NA
NA
SBB (Lot 8)
Set Scaffold to Roof – Ext NE
NA
NA
SBB (Lot 8)
Misc In-Wall Steel for Canopy – Ext NE
NA
NA
SBB (Lot 8)
Install Temp Roofing at Low Roofs– Ext SW
NA
NA
SBB (Lot 8) Concrete
Pour Grand Stair – Int-L1
Concrete Pump
Noise due to equipment
SBB (Lot 8) Concrete
Strip Grand Stair – Int-L1
NA
NA
SBB (Lot 8)
Install O/H Mechanical Equipment and Ductwork Mains and Seismic – Int-L1
NA
NA
SBB (Lot 8)
Install In-Wall Electrical – Int-L1
NA
NA
SBB (Lot 8)
Install Backing – Int-L1
NA
NA
SBB (Lot 8)
Layout Framing and Install Top Track – Int-Auditorium
NA
NA
SBB (Lot 8)
Hang 2nd Side Top Down Drywall and Inspect – Int-L2
NA
NA
SBB (Lot 8)
Fire Tape – Int-L2
NA
NA
SBB (Lot 8)
Fire Caulking Head of Wall – Int-L2
NA
NA
SBB (Lot 8)
Frame Interference Walls and Install Door Frames – Int-L3
NA
NA
SBB (Lot 8)
Concrete
Pour CIP Stair to L4
Concrete Pump
Noise due to equipment
SBB (Lot 8)
Concrete
Strip CIP Stair to L4
NA
NA
SBB (Lot 8)
Install Storm, Overflow, Sewer Lines and Seismic – Int-L4
NA
NA
Week of January 22, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install Roofing at mechanical Equipment Pad
NA
NA
SBB (Lot 8)
Drainage Layer – Ext-L1
NA
NA
SBB (Lot 8)
Cement Board – Ext-L1
NA
NA
SBB (Lot 8)
Weather Barrier – Ext-L1
NA
NA
SBB (Lot 8) Concrete
Erect Stairs – Ext-NE
NA
NA
SBB (Lot 8)
Exterior Framing – Ext-NE
NA
NA
SBB (Lot 8)
Erect Tube Steel Structure – Ext-SW
NA
NA
SBB (Lot 8)
Set Scaffold for Level 3 to Roof – Ext-SW
NA
NA
SBB (Lot 8)
Install Metal Decking – Ext-SW
NA
NA
SBB (Lot 8)
Install O/H Supply and Return Ductwork Branch and Seismic – Int-L1
NA
NA
SBB (Lot 8)
Install Hot and Cold Supply and Return Mech Lunes and Seismic – Int-L1
NA
NA
SBB (Lot 8)
Install Insulation and Inspect – Elec-L1
NA
NA
SBB (Lot 8)
Hang Drywall and Inspect – Elec-L1
NA
NA
SBB (Lot 8)
Tape Walls – Elec-L1
NA
NA
SBB (Lot 8)
Frame Walls – Int-Auditorium
NA
NA
SBB (Lot 8)
Install O/H Waste and Vent – Int-L2
NA
NA
SBB (Lot 8)
Install O/H Mechanical Equipment and Ductwork Mains and Seismic – Int-L2
NA
NA
SBB (Lot 8)
Install Mechanical / FSD’s – Elec-L2
NA
NA
SBB (Lot 8)
Install Early MEP to support Top Down Drywall – Int-L3
NA
NA
SBB (Lot 8)
Hang 1st Side Top Down Drywall – Int-L3
NA
NA
SBB (Lot 8)
Install Insulation and Inspect – Int-L3
NA
NA
SBB (Lot 8)
Hang 2nd Side Top Down Drywall and Inspect – Int-L3
NA
NA
SBB (Lot 8)
Layout Framing and Install Top Track – Second Pass – Int-L3
NA
NA
SBB (Lot 8)
Frame Interference Walls and Install Door Frames – Second Pass – Int-L3
NA
NA
SBB (Lot 8)
Install Fire Sprinkler Mains, Branches and Seismic – Int-L3
NA
NA
SBB (Lot 8)
Install Storm, Overflow, Sewer Lines and Seismic – Int-L3
NA
NA
SBB (Lot 8)
Layout Framing and Install Top Track – Int-L4
NA
NA
Week of January 29, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Drainage Layer – EXT-L1
NA
NA
SBB (Lot 8)
Cement Board – EXT-L1
NA
NA
SBB (Lot 8)
Secondary Air Barrier – EXT-L1
NA
NA
SBB (Lot 8)
Precast Panels – EXT-L1
NA
NA
SBB (Lot 8)
Exterior Framing – West Elevation
NA
NA
SBB (Lot 8)
Install Hot/Cold Supply and Return Mech Lines and Seismic
NA
NA
SBB (Lot 8)
Tape Walls – Elec-L1
NA
NA
SBB (Lot 8)
Install O/H Supply and Return Ductwork – INT-L1
SBB (Lot 8)
Install Hot/Cold Domestic Water Lines and Seismic – INT-L2
NA
NA
SBB (Lot 8)
Install Fire Sprinkler Mains branches and Seismic – INT-L4
NA
NA
SBB (Lot 8)
Install in-wall and branch electrical – Auditorium
NA
NA
SBB (Lot 8)
Install In-wall Low Voltage – Auditorium
NA
NA
SBB (Lot 8)
Install Storm overflow, sewer lines, and seismic – INT-L3
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #61
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Concrete
Cure Deck for Moisture Testing
NA
NA
SBB (Lot 8) Concrete
MEP Stub-up Penetrations
NA
NA
SBB (Lot 8)
Install Mechanical Duct Pipe Supports
NA
NA
SBB (Lot 8)
Install Roof Drains
NA
NA
SBB (Lot 8)
Soffit Framing – Ext-L1
NA
NA
SBB (Lot 8)
Rigid Insulation and Air water barrier – Ext-L1
NA
NA
SBB (Lot 8)
Electrical Rough-in Soffits – Ext-L1
NA
NA
SBB (Lot 8)
Soffit Sheathing – Ext-L1
NA
NA
SBB (Lot 8) Concrete
Rebar Grand Stair – Int-L1
NA
NA
SBB (Lot 8)
Install O/H waste and vent – Int-L1
NA
NA
SBB (Lot 8)
Install Mechanical / FSDs – Elec-L1
NA
NA
SBB (Lot 8)
Hang 1st Side Top Down Drywall – Int-L2
NA
NA
SBB (Lot 8)
Install Insulation and Inspect – Int-L2
NA
NA
SBB (Lot 8)
Install Fire Sprinkler Mains, Branch and Seismic – Int-L2
NA
NA
SBB (Lot 8) Concrete
Rebar CIP Stair to L4
NA
NA
SBB (Lot 8)
Install Fire Water – College Place to SBB POC
NA
NA
SBB (Lot 8) Concrete
F/R/P Walls at Transformer Yard
Crane and Concrete Pump
Noise due to equipment
SBB (Lot 8) Concrete
F/R/P Transformer Yard Slab
Crane and Concrete Pump
Noise due to equipment
Week of January 15, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Concrete
F/R/P Walls at Transformer Yard
Crane and Concrete Pump
Noise due to equipment
SBB (Lot 8) Concrete
F/R/P Transformer Yard Slab
Crane and Concrete Pump
Noise due to equipment
SBB (Lot 8)
Vapor Retarder Sheet Air Barrier
NA
NA
SBB (Lot 8)
Flashing / Window Surrounds – Ext-L1
NA
NA
SBB (Lot 8)
Install Temp Roofing Low Roofs – Ext NE
NA
NA
SBB (Lot 8)
Erect Steel Structure for Stairs – Ext NE
NA
NA
SBB (Lot 8)
Set Scaffold to Roof – Ext NE
NA
NA
SBB (Lot 8)
Misc In-Wall Steel for Canopy – Ext NE
NA
NA
SBB (Lot 8)
Install Temp Roofing at Low Roofs– Ext SW
NA
NA
SBB (Lot 8) Concrete
Pour Grand Stair – Int-L1
Concrete Pump
Noise due to equipment
SBB (Lot 8) Concrete
Strip Grand Stair – Int-L1
NA
NA
SBB (Lot 8)
Install O/H Mechanical Equipment and Ductwork Mains and Seismic – Int-L1
NA
NA
SBB (Lot 8)
Install In-Wall Electrical – Int-L1
NA
NA
SBB (Lot 8)
Install Backing – Int-L1
NA
NA
SBB (Lot 8)
Layout Framing and Install Top Track – Int-Auditorium
NA
NA
SBB (Lot 8)
Hang 2nd Side Top Down Drywall and Inspect – Int-L2
NA
NA
SBB (Lot 8)
Fire Tape – Int-L2
NA
NA
SBB (Lot 8)
Fire Caulking Head of Wall – Int-L2
NA
NA
SBB (Lot 8)
Frame Interference Walls and Install Door Frames – Int-L3
NA
NA
SBB (Lot 8)
Concrete
Pour CIP Stair to L4
Concrete Pump
Noise due to equipment
SBB (Lot 8)
Concrete
Strip CIP Stair to L4
NA
NA
SBB (Lot 8)
Install Storm, Overflow, Sewer Lines and Seismic – Int-L4
NA
NA
Week of January 22, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install Roofing at mechanical Equipment Pad
NA
NA
SBB (Lot 8)
Drainage Layer – Ext-L1
NA
NA
SBB (Lot 8)
Cement Board – Ext-L1
NA
NA
SBB (Lot 8)
Weather Barrier – Ext-L1
NA
NA
SBB (Lot 8) Concrete
Erect Stairs – Ext-NE
NA
NA
SBB (Lot 8)
Exterior Framing – Ext-NE
NA
NA
SBB (Lot 8)
Erect Tube Steel Structure – Ext-SW
NA
NA
SBB (Lot 8)
Set Scaffold for Level 3 to Roof – Ext-SW
NA
NA
SBB (Lot 8)
Install Metal Decking – Ext-SW
NA
NA
SBB (Lot 8)
Install O/H Supply and Return Ductwork Branch and Seismic – Int-L1
NA
NA
SBB (Lot 8)
Install Hot and Cold Supply and Return Mech Lunes and Seismic – Int-L1
NA
NA
SBB (Lot 8)
Install Insulation and Inspect – Elec-L1
NA
NA
SBB (Lot 8)
Hang Drywall and Inspect – Elec-L1
NA
NA
SBB (Lot 8)
Tape Walls – Elec-L1
NA
NA
SBB (Lot 8)
Frame Walls – Int-Auditorium
NA
NA
SBB (Lot 8)
Install O/H Waste and Vent – Int-L2
NA
NA
SBB (Lot 8)
Install O/H Mechanical Equipment and Ductwork Mains and Seismic – Int-L2
NA
NA
SBB (Lot 8)
Install Mechanical / FSD’s – Elec-L2
NA
NA
SBB (Lot 8)
Install Early MEP to support Top Down Drywall – Int-L3
NA
NA
SBB (Lot 8)
Hang 1st Side Top Down Drywall – Int-L3
NA
NA
SBB (Lot 8)
Install Insulation and Inspect – Int-L3
NA
NA
SBB (Lot 8)
Hang 2nd Side Top Down Drywall and Inspect – Int-L3
NA
NA
SBB (Lot 8)
Layout Framing and Install Top Track – Second Pass – Int-L3
NA
NA
SBB (Lot 8)
Frame Interference Walls and Install Door Frames – Second Pass – Int-L3
NA
NA
SBB (Lot 8)
Install Fire Sprinkler Mains, Branches and Seismic – Int-L3
NA
NA
SBB (Lot 8)
Install Storm, Overflow, Sewer Lines and Seismic – Int-L3
NA
NA
SBB (Lot 8)
Layout Framing and Install Top Track – Int-L4
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #60
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Concrete
Underslab Electrical Rough-in - Auditorium Steps
NA
NA
SBB (Lot 8) Concrete
Form Steps - Auditorium
NA
NA
SBB (Lot 8)
QC / Inspection – Auditorium
NA
NA
SBB (Lot 8)
Strip and Haul Off Form system
Crane
Noise due to Equipment
SBB (Lot 8)
Install Roofing at Mechanical Equipment Pad
NA
NA
SBB (Lot 8)
Install Mechanical Duct Pipe Supports – Roof
NA
NA
SBB (Lot 8)
Set Scaffold to Roof
NA
NA
SBB (Lot 8)
Install Temp Roofing at Low Roof
NA
NA
SBB (Lot 8)
Set Scaffold for level 2
NA
NA
SBB (Lot 8)
Erect Tube Steel Structure
Crane
Noise due to Equipment
SBB (Lot 8)
Form Grand Stair
NA
NA
SBB (Lot 8)
Install Mechanical / FSD’s – Electrical/BDF Room
NA
NA
SBB (Lot 8)
Install In-Wall Electrical – Electrical/BDF Room
NA
NA
SBB (Lot 8)
Hang 1st Side Top Down Drywall – INT-L2
NA
NA
SBB (Lot 8)
Install Insulation & Inspect -INT-L2
NA
NA
SBB (Lot 8)
Layout Framing and Install Top Track
NA
NA
SBB (Lot 8) Concrete
F/R/P Walls at Transformer Yard Slab
Concrete Pump
Noise due to Equipment
SBB (Lot 8) Concrete
F/R/P Transformer Yard Slab
Concrete Pump
Noise due to Equipment
SBB (Lot 8)
Drainage Layer – EXT-L1
NA
NA
Week of January 8, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Concrete
Pour Steps Auditorium
Concrete Pump
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Edge Form / Bulkhead – Auditorium Steps
NA
NA
SBB (Lot 8)
Install Roofing Mechanical Equipment Pad
NA
NA
SBB (Lot 8)
Install Mechanical Duct / Pipe Supports - Roof
Crane
Noise due to Equipment
SBB (Lot 8)
MEP Stub-up Penetration - Roof
NA
NA
SBB (Lot 8)
Drainage Layer – EXT-L1
NA
NA
SBB (Lot 8)
Cement Board – EXT-L1
NA
NA
SBB (Lot 8)
Secondary Air Barrier – EXT-L1
NA
NA
SBB (Lot 8)
Electrical Rough-in Soffits – EXT-L1
NA
NA
SBB (Lot 8)
Soffit Sheathing – EXT-L1
NA
NA
SBB (Lot 8)
Misc In-Wall Steel for canopy-EXT-NE
NA
NA
SBB (Lot 8)
Exterior Framing – East Elevation L1
NA
NA
SBB (Lot 8)
Erect Stairs – EXT-NE
NA
NA
SBB (Lot 8)
Install Temp Roofing
NA
NA
SBB (Lot 8)
Erect Tube Steel Structure-EXT SW
NA
NA
SBB (Lot 8)
Install Metal Decking – EXT SW
NA
NA
SBB (Lot 8) Concrete
Pour Grand Stair – INT-L1
Concrete Pump
Noise due to Equipment
SBB (Lot 8)
Install O/H Waste and Vent – INT-L1
NA
NA
SBB (Lot 8)
Install Hot/Cold Domestic Water Lines and Seismic – INT-L1
NA
NA
SBB (Lot 8)
Install O/H Mechanical Equipment and Ductwork Mains and Seismic – INT-L1
NA
NA
SBB (Lot 8)
Install In-Wall Electrical – Elec-L1
NA
NA
SBB (Lot 8)
Install Backing – Elec-L1
NA
NA
SBB (Lot 8)
Install Insulation and Inspect – Elect-L1
NA
NA
SBB (Lot 8)
Layout Framing and Install Top Track – Auditorium
NA
NA
SBB (Lot 8)
Fire Tape – INT-L2
NA
NA
SBB (Lot 8)
Fire Caulk Head of Wall – INT-L2
NA
NA
SBB (Lot 8)
Frame Interference Walls and Install Door Framed – INT-L3
NA
NA
SBB (Lot 8)
Install Early MEP to Support Top Down Drywall – INT-L3
NA
NA
Anderson Park
Rough Grade / Cut Curbs – Anderson Park
Loader
Noise due to Equipment
Week of January 15, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install Roof Drains
NA
NA
SBB (Lot 8)
Set Mechanical Equipment
NA
NA
SBB (Lot 8)
Moisture Test Concrete Deck
NA
NA
SBB (Lot 8)
Secondary Air Barrier – EXT-L1
SBB (Lot 8)
Soffit Sheathing – EXT-L1
NA
NA
SBB (Lot 8)
F/R/P Stair Treads/Landings
NA
NA
SBB (Lot 8)
Rigid Insulation and Air Water Barrier – EXT NW
NA
NA
SBB (Lot 8)
Exterior Framing – EXT NW
NA
NA
SBB (Lot 8)
Erect Steel Structure for Stairs-EXT SW
NA
NA
SBB (Lot 8)
Install O/H Supply & Return Ductwork Branch & Seismic – INT-L1
NA
NA
SBB (Lot 8)
Hang Drywall and Inspect – Elec/BDF L1
NA
NA
SBB (Lot 8)
Tape Walls – Elec/BDF L1
NA
NA
SBB (Lot 8)
Frame Walls – INT Auditorium
NA
NA
SBB (Lot 8)
Install O/H Mechanical Equipment and Ductwork - INT-L2
NA
NA
SBB (Lot 8)
Install In-Wall Electrical – Elec L2
NA
NA
SBB (Lot 8)
Hang 1st Side Top Down Drywall – INT-L3
NA
NA
SBB (Lot 8)
Install Insulation and Inspect – INT-L3
SBB (Lot 8)
Hang 2nd Side Top Down Drywall and Inspect – INT-L3
NA
NA
SBB (Lot 8)
Fire Tape – INT-L3
NA
NA
SBB (Lot 8)
Layout Framing and Install Top Track – INT-L4
NA
NA
SBB (Lot 8)
Frame Interference Walls and Install Foor Frames
NA
NA
SBB (Lot 8)
Install Early MEP to Support Top Down Drywall
NA
NA
SBB (Lot 8)
Install Communications Ductbank and Vault from MH-14 to SBB POC
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #59
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Concrete
Edge Form / Bulkhead SOG North – Auditorium Steps
NA
NA
SBB (Lot 8) Concrete
Rebar – Auditorium Steps
NA
NA
SBB (Lot 8) Concrete
Underslab Electrical Rough-in - Auditorium Steps
NA
NA
SBB (Lot 8) Concrete
Form Steps - Auditorium
NA
NA
SBB (Lot 8) Concrete
Close Two Side Forms – Vert L5
NA
NA
SBB (Lot 8) Concrete
Pour – Vert L5
Concrete Pump
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Walls and columns – Vert L5
NA
NA
SBB (Lot 8) Concrete
Cure for Steel Erection – Vert L5
NA
NA
SBB (Lot 8) Concrete
Strip and Haul off Form System – Deck L5
Crane
Noise due to Equipment
SBB (Lot 8)
Install Roof Drains
NA
NA
SBB (Lot 8)
Soffit Framing – EXT L1
NA
NA
SBB (Lot 8)
Flashing and Window Surrounds-EXT L1
NA
NA
SBB (Lot 8)
Rigid Insulation and Air Water Barrier – EXT L1
NA
NA
SBB (Lot 8)
Electrical Rough-in Soffits – EXT L1
NA
NA
SBB (Lot 8) Concrete
Form Grand Stair – INT L1
NA
NA
SBB (Lot 8)
Install Fire Sprinkler Mains, Branches, & Seismic
NA
NA
SBB (Lot 8) Concrete
Remove Re-Shore – INT L2
NA
NA
SBB (Lot 8)
Frame Interference Walls and Install Foor Frames – INT L2
NA
NA
SBB (Lot 8)
Install Early MEP to Support Top Drown Drywall – INT L2
NA
NA
SBB (Lot 8) Concrete
F/R/P Walls at Transformer Yard
Concrete Pump
Noise due to Equipment
SBB (Lot 8)
Install Fire Water College Place to SBB POC
NA
NA
Week of January 1, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Concrete
Underslab Electrical Rough-in - Auditorium Steps
NA
NA
SBB (Lot 8) Concrete
Form Steps - Auditorium
NA
NA
SBB (Lot 8)
QC / Inspection – Auditorium
NA
NA
SBB (Lot 8)
Strip and Haul Off Form system
Crane
Noise due to Equipment
SBB (Lot 8)
Install Roofing at Mechanical Equipment Pad
NA
NA
SBB (Lot 8)
Install Mechanical Duct Pipe Supports – Roof
NA
NA
SBB (Lot 8)
Set Scaffold to Roof
NA
NA
SBB (Lot 8)
Install Temp Roofing at Low Roof
NA
NA
SBB (Lot 8)
Set Scaffold for level 2
NA
NA
SBB (Lot 8)
Erect Tube Steel Structure
Crane
Noise due to Equipment
SBB (Lot 8)
Form Grand Stair
NA
NA
SBB (Lot 8)
Install Mechanical / FSD’s – Electrical/BDF Room
NA
NA
SBB (Lot 8)
Install In-Wall Electrical – Electrical/BDF Room
NA
NA
SBB (Lot 8)
Hang 1st Side Top Down Drywall – INT-L2
NA
NA
SBB (Lot 8)
Install Insulation & Inspect -INT-L2
NA
NA
SBB (Lot 8)
Layout Framing and Install Top Track
NA
NA
SBB (Lot 8) Concrete
F/R/P Walls at Transformer Yard Slab
Concrete Pump
Noise due to Equipment
SBB (Lot 8) Concrete
F/R/P Transformer Yard Slab
Concrete Pump
Noise due to Equipment
Week of January 8, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Concrete
Pour Steps Auditorium
Concrete Pump
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Edge Form / Bulkhead – Auditorium Steps
NA
NA
SBB (Lot 8)
Install Roofing Mechanical Equipment Pad
NA
NA
SBB (Lot 8)
Install Mechanical Duct / Pipe Supports - Roof
Crane
Noise due to Equipment
SBB (Lot 8)
MEP Stub-up Penetration - Roof
NA
NA
SBB (Lot 8)
Drainage Layer – EXT-L1
NA
NA
SBB (Lot 8)
Cement Board – EXT-L1
NA
NA
SBB (Lot 8)
Secondary Air Barrier – EXT-L1
NA
NA
SBB (Lot 8)
Electrical Rough-in Soffits – EXT-L1
NA
NA
SBB (Lot 8)
Soffit Sheathing – EXT-L1
NA
NA
SBB (Lot 8)
Misc In-Wall Steel for canopy-EXT-NE
NA
NA
SBB (Lot 8)
Exterior Framing – East Elevation L1
NA
NA
SBB (Lot 8)
Erect Stairs – EXT-NE
NA
NA
SBB (Lot 8)
Install Temp Roofing
NA
NA
SBB (Lot 8)
Erect Tube Steel Structure-EXT SW
NA
NA
SBB (Lot 8)
Install Metal Decking – EXT SW
NA
NA
SBB (Lot 8) Concrete
Pour Grand Stair – INT-L1
Concrete Pump
Noise due to Equipment
SBB (Lot 8)
Install O/H Waste and Vent – INT-L1
NA
NA
SBB (Lot 8)
Install Hot/Cold Domestic Water Lines and Seismic – INT-L1
NA
NA
SBB (Lot 8)
Install O/H Mechanical Equipment and Ductwork Mains and Seismic – INT-L1
NA
NA
SBB (Lot 8)
Install In-Wall Electrical – Elec-L1
NA
NA
SBB (Lot 8)
Install Backing – Elec-L1
NA
NA
SBB (Lot 8)
Install Insulation and Inspect – Elect-L1
NA
NA
SBB (Lot 8)
Layout Framing and Install Top Track – Auditorium
NA
NA
SBB (Lot 8)
Fire Tape – INT-L2
NA
NA
SBB (Lot 8)
Fire Caulk Head of Wall – INT-L2
NA
NA
SBB (Lot 8)
Frame Interference Walls and Install Door Framed – INT-L3
NA
NA
SBB (Lot 8)
Install Early MEP to Support Top Down Drywall – INT-L3
NA
NA
SBB (Lot 8)
Rough Grade / Cut Curbs – Anderson Park
Loader
Noise due to Equipment
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #58
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
F/R/P Transformer Yard Footings
NA
NA
SBB (Lot 8) Concrete
Pour – Deck L5
Concrete Pump
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Edge Form and Transfer Beams – Deck L5
NA
NA
SBB (Lot 8) Concrete
Cure for Stress – Deck L5
NA
NA
SBB (Lot 8) Concrete
Stress Transfer Beams – Deck L5
NA
NA
SBB (Lot 8) Concrete
One Side Form Walls and Columns – Vert L5
NA
NA
SBB (Lot 8) Concrete
Rebar – Vert L5
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Layout and Install MEPs – Vert L5
NA
NA
SBB (Lot 8) Concrete
Set Embeds – Vert L5
NA
NA
SBB (Lot 8) Concrete
QC / Inspection – Vert L5
NA
NA
SBB (Lot 8) Concrete
F/R/P Equipment Pads
Concrete Pump
Noise due to Equipment
SBB (Lot 8) Concrete
Roof Davits
NA
NA
SBB (Lot 8)
Soffit Framing – EXT L1
NA
NA
SBB (Lot 8)
Rigid Insulation and Air Water Barrier – EXT L1
NA
NA
SBB (Lot 8)
Electrical Rough-in Soffits – EXT L1
NA
NA
SBB (Lot 8)
Fire Sprinkler Rough-in Soffits – EXT L1
NA
NA
SBB (Lot 8)
Plumbing Rough-in Soffits – EXT L1
NA
NA
SBB (Lot 8)
Hang 2nd Side Top-Down Drywall and Inspect – INT L1
NA
NA
SBB (Lot 8)
Fire Tape – INT L1
NA
NA
SBB (Lot 8)
Fire Caulk Head of Wall– INT L1
NA
NA
SBB (Lot 8)
Install Elevator Guide Rail Support Steel – Level 3
NA
NA
SBB (Lot 8)
Concrete
F/R/P Walls at Transformer Yard
Concrete Pump
Noise due to Equipment
Week of December 25, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Concrete
Edge Form / Bulkhead SOG North – Auditorium Steps
NA
NA
SBB (Lot 8) Concrete
Rebar – Auditorium Steps
NA
NA
SBB (Lot 8) Concrete
Underslab Electrical Rough-in - Auditorium Steps
NA
NA
SBB (Lot 8) Concrete
Form Steps - Auditorium
NA
NA
SBB (Lot 8) Concrete
Close Two Side Forms – Vert L5
NA
NA
SBB (Lot 8) Concrete
Pour – Vert L5
Concrete Pump
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Walls and columns – Vert L5
NA
NA
SBB (Lot 8) Concrete
Cure for Steel Erection – Vert L5
NA
NA
SBB (Lot 8) Concrete
Strip and Haul off Form System – Deck L5
Crane
Noise due to Equipment
SBB (Lot 8)
Install Roof Drains
NA
NA
SBB (Lot 8)
Soffit Framing – EXT L1
NA
NA
SBB (Lot 8)
Flashing and Window Surrounds-EXT L1
NA
NA
SBB (Lot 8)
Rigid Insulation and Air Water Barrier – EXT L1
NA
NA
SBB (Lot 8)
Electrical Rough-in Soffits – EXT L1
NA
NA
SBB (Lot 8) Concrete
Form Grand Stair – INT L1
NA
NA
SBB (Lot 8)
Install Fire Sprinkler Mains, Branches, & Seismic
NA
NA
SBB (Lot 8) Concrete
Remove Re-Shore – INT L2
NA
NA
SBB (Lot 8)
Frame Interference Walls and Install Foor Frames – INT L2
NA
NA
SBB (Lot 8)
Install Early MEP to Support Top Drown Drywall – INT L2
NA
NA
SBB (Lot 8) Concrete
F/R/P Walls at Transformer Yard
Concrete Pump
Noise due to Equipment
SBB (Lot 8)
Install Fire Water College Place to SBB POC
NA
NA
Week of January 1, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Concrete
Underslab Electrical Rough-in - Auditorium Steps
NA
NA
SBB (Lot 8) Concrete
Form Steps - Auditorium
NA
NA
SBB (Lot 8)
QC / Inspection – Auditorium
NA
NA
SBB (Lot 8)
Strip and Haul Off Form system
Crane
Noise due to Equipment
SBB (Lot 8)
Install Roofing at Mechanical Equipment Pad
NA
NA
SBB (Lot 8)
Install Mechanical Duct Pipe Supports – Roof
NA
NA
SBB (Lot 8)
Set Scaffold to Roof
NA
NA
SBB (Lot 8)
Install Temp Roofing at Low Roof
NA
NA
SBB (Lot 8)
Set Scaffold for level 2
NA
NA
SBB (Lot 8)
Erect Tube Steel Structure
Crane
Noise due to Equipment
SBB (Lot 8)
Form Grand Stair
NA
NA
SBB (Lot 8)
Install Mechanical / FSD’s – Electrical/BDF Room
NA
NA
SBB (Lot 8)
Install In-Wall Electrical – Electrical/BDF Room
NA
NA
SBB (Lot 8)
Hang 1st Side Top Down Drywall – INT-L2
NA
NA
SBB (Lot 8)
Install Insulation & Inspect -INT-L2
NA
NA
SBB (Lot 8)
Layout Framing and Install Top Track
NA
NA
SBB (Lot 8) Concrete
F/R/P Walls at Transformer Yard Slab
Concrete Pump
Noise due to Equipment
SBB (Lot 8) Concrete
F/R/P Transformer Yard Slab
Concrete Pump
Noise due to Equipment
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #57
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Concrete
MEP Sleeves and Inserts – Deck L5
NA
NA
SBB (Lot 8) Concrete
Install Embeds – Deck L5
NA
NA
SBB (Lot 8) Concrete
Set Anchor Bolts – Deck L5
NA
NA
SBB (Lot 8) Concrete
Rebar / PT Cables – Deck L5
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Electrical Rough-in – Deck L5
NA
NA
SBB (Lot 8)
Install Early MEP To support Top Down Drywall – INT-L1
NA
NA
SBB (Lot 8)
Install Misc Metals Supports for Operable Partitions – INT-L1
NA
NA
SBB (Lot 8)
Hang 1st Side Top Down Drywall – INT-L1
NA
NA
SBB (Lot 8)
Install Insulation & Inspect – INT-L1
NA
NA
SBB (Lot 8)
Install Elevator Guide Rail Support Steel – Level 2
NA
NA
SBB (Lot 8)
F/R/P Transformer Yard Footings
NA
NA
Week of December 18, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Concrete
Electrical Rough-in – Deck L5
NA
NA
SBB (Lot 8) Concrete
Deck Depressions – Deck L5
NA
NA
SBB (Lot 8) Concrete
QC / Inspection – Deck L5
NA
NA
SBB (Lot 8) Concrete
Pour – Deck L5
Concrete Pump
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Edge Form and Transfer Beams – Deck L5
NA
NA
SBB (Lot 8) Concrete
Cure for Stress – Deck L5
NA
NA
SBB (Lot 8) Concrete
Stress Transfer Beams – Deck L5
NA
NA
SBB (Lot 8) Concrete
One Side Form Walls and Columns – Vert L5
NA
NA
SBB (Lot 8) Concrete
Rebar – Vert L5
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Layout and Install MEPs – Vert L5
NA
NA
SBB (Lot 8) Concrete
Set Embeds – Vert L5
NA
NA
SBB (Lot 8) Concrete
QC / Inspection – Vert L5
NA
NA
SBB (Lot 8) Concrete
F/R/P Equipment Pads
Concrete Pump
Noise due to Equipment
SBB (Lot 8) Concrete
Roof Davits
NA
NA
SBB (Lot 8)
Soffit Framing – EXT L1
NA
NA
SBB (Lot 8)
Rigid Insulation and Air Water Barrier – EXT L1
NA
NA
SBB (Lot 8)
Electrical Rough-in Soffits – EXT L1
NA
NA
SBB (Lot 8)
Fire Sprinkler Rough-in Soffits – EXT L1
NA
NA
SBB (Lot 8)
Plumbing Rough-in Soffits – EXT L1
NA
NA
SBB (Lot 8)
Hang 2nd Side Top Down Drywall and Inspect – INT L1
NA
NA
SBB (Lot 8)
Fire Tape – INT L1
NA
NA
SBB (Lot 8)
Fire Caulk Head of Wall– INT L1
NA
NA
SBB (Lot 8)
Install Elevator Guide Rail Support Steel – Level 3
NA
NA
SBB (Lot 8)
Concrete
F/R/P Walls at Transformer Yard
Concrete Pump
Noise due to Equipment
Week of December 25, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Concrete
Close Tow Side Forms – Vert L5
NA
NA
SBB (Lot 8) Concrete
Pour – Vert L5
Concrete Pump
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Walls and columns – Vert L5
NA
NA
SBB (Lot 8) Concrete
Cure for Steel Erection – Vert L5
NA
NA
SBB (Lot 8)
Soffit Framing – EXT L1
NA
NA
SBB (Lot 8)
Rigid Insulation and Air Water Barrier – EXT L1
NA
NA
SBB (Lot 8)
Electrical Rough-in Soffits – EXT L1
NA
NA
SBB (Lot 8) Concrete
Form Grand Stair – INT L1
NA
NA
SBB (Lot 8)
Install Storm, Overflow, Sewer Lines, and Seismic
NA
NA
SBB (Lot 8)
Install Mechanical / FSD’s
NA
NA
SBB (Lot 8) Concrete
Remove Re-Shore – INT L2
NA
NA
SBB (Lot 8)
Frame Interference Walls and Install Foor Frames – INT L2
NA
NA
SBB (Lot 8)
Install Early MEP to Support Top Drown Drywall – INT L2
NA
NA
SBB (Lot 8) Concrete
F/R/P Walls at Transformer Yard
Concrete Pump
Noise due to Equipment
SBB (Lot 8)
Install Fire Water College Place to SBB POC
NA
NA
SBB (Lot 8) Concrete
F/R/P Transformer Yard Slab
Concrete Pump
Noise due to Equipment
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #56
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Concrete
Pour Auditorium Steps – SOG1
Concrete Pumps
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Edge Form / Bulkhead – SOG North – Auditorium Steps
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Strip & Re-Shore – Deck L4S
NA
NA
SBB (Lot 8) Concrete
Edge Form – Deck L5 Roof
Crane
Noise due to Equipment
SBB (Lot 8)
Install Early MEP to support Top Down Drywall
NA
NA
SBB (Lot 8)
Hang 1st Side Top Down Drywall – INT L1
NA
NA
SBB (Lot 8)
Install Insulation and Inspect – INT L1
NA
NA
SBB (Lot 8)
F/R/P Transformer Yard Slab
NA
NA
Week of December 11, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Concrete
MEP Sleeves and Inserts – Deck L5
NA
NA
SBB (Lot 8) Concrete
Set Anchor Bolts – Deck L5
NA
NA
SBB (Lot 8) Concrete
Rebar / PT Cables – Deck L5
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Electrical Rough-in – Deck L5
NA
NA
SBB (Lot 8)
Soffit Framing – EXT-L1
NA
NA
SBB (Lot 8)
Rigid Insulation and Air Water Barrier – EXT-L1
NA
NA
SBB (Lot 8)
Electrical Rough-in Soffits – EXT-L1
NA
NA
SBB (Lot 8)
Fire Sprinkler Rough-in Soffits – EXT-L1
NA
NA
SBB (Lot 8)
Plumbing Rough-in Soffits – EXT-L1
NA
NA
SBB (Lot 8)
Fire Tape – INT-L1
NA
NA
SBB (Lot 8)
Fire Caulk Head of Wall – INT-L1
NA
NA
Week of December 18, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Concrete
Deck Depression – Deck L5
NA
NA
SBB (Lot 8) Concrete
QC / Inspection – Deck L5
NA
NA
SBB (Lot 8) Concrete
Pour – Deck L5
Concrete Pumps
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Edge Form and Transfer Beams – Deck L5
NA
NA
SBB (Lot 8) Concrete
Layout walls and Columns – VERT L5
NA
NA
SBB (Lot 8)
Soffit Sheathing – EXT L1
NA
NA
SBB (Lot 8)
Isntall Hot/Cold Domestic Water Lines and Seismic – INT L1
NA
NA
SBB (Lot 8)
Install Mechanical / FSD’s – Electrical / BDF Rooms
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #55
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Concrete
QC / Inspection – SOG North Auditorium Steps
NA
NA
SBB (Lot 8) Concrete
Strip Walls & Columns – Vert L4N
NA
NA
SBB (Lot 8) Concrete
Close Two Side Forms - Vert L4S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Pour - Vert L4S
Concrete Pumps
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Walls & Columns – Vert L4S
Crane
Noise due to Equipment
SBB (Lot 8)
Exterior Framing – EXT-L1
NA
NA
SBB (Lot 8)
Frame Interference Walls and Install door Frames - INT-L1
NA
NA
SBB (Lot 8)
Install Early MEP to Support Top Down Drywall
NA
NA
SBB (Lot 8) Concrete
F/R/P Transformer Yard Wall
NA
NA
SBB (Lot 8) Concrete
F/R/P Transformer Yard Slab
NA
NA
Week of December 4, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Concrete
Pour Auditorium Steps – SOG1
Concrete Pumps
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Edge Form / Bulkhead – SOG North – Auditorium Steps
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Strip & Re-Shore – Deck L4S
NA
NA
SBB (Lot 8) Concrete
Edge Form – Deck L5 Roof
NA
NA
SBB (Lot 8)
Install Early MEP to support Top Down Drywall
NA
NA
SBB (Lot 8)
Hang 1st Side Top Down Drywall – INT L1
NA
NA
SBB (Lot 8)
Install Insulation and Inspect – INT L1
NA
NA
SBB (Lot 8)
F/R/P Transformer Yard Slab
NA
NA
Week of December 11, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Concrete
MEP Sleeves and Inserts – Deck L5
NA
NA
SBB (Lot 8) Concrete
Set Anchor Bolts – Deck L5
NA
NA
SBB (Lot 8) Concrete
Rebar / PT Cables – Deck L5
Crane
Noise due to Equipment
SBB (Lot 8)
Soffit Framing – EXT-L1
NA
NA
SBB (Lot 8)
Rigid Insulation and Air Water Barrier – EXT-L1
NA
NA
SBB (Lot 8)
Electrical Rough-in Soffits – EXT-L1
NA
NA
SBB (Lot 8)
Fire Sprinkler Rough-in Soffits – EXT-L1
NA
NA
SBB (Lot 8)
Plumbing Rough-in Soffits – EXT-L1
NA
NA
SBB (Lot 8)
Fire Tape – INT-L1
NA
NA
SBB (Lot 8)
Fire Caulk Head of Wall – INT-L1
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #54
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Punchlist Corrections
NA
NA
SBB (Lot 8) Concrete
Form Steps – Auditorium
NA
NA
SBB (Lot 8) Concrete
QC / Inspection – Vert L4N
NA
NA
SBB (Lot 8) Concrete
Close Two Side Forms – Vert L4N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Pour – Vert L4N
Concrete Pumps
Noise due to Equipment
SBB (Lot 8) Concrete
Rebar – Vert L4S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Layout & Install MEP’s – Vert L4S
NA
NA
SBB (Lot 8) Concrete
Set Embeds – Vert L4S
NA
NA
SBB (Lot 8) Concrete
QC / Inspection – Vert L4S
NA
NA
SBB (Lot 8)
Exterior Framing – L1
NA
NA
SBB (Lot 8)
Frame Interference Walls & Install Door Frames
NA
NA
SBB (Lot 8) Concrete
F/R/P Transformer Yard Wall
NA
NA
Week of November 27, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Concrete
QC / Inspection – SOG North Auditorium Steps
NA
NA
SBB (Lot 8) Concrete
Strip Walls & Columns – Vert L4N
NA
NA
SBB (Lot 8) Concrete
Close Two Side Forms - Vert L4S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Pour - Vert L4S
Concrete Pumps
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Walls & Columns – Vert L4S
Crane
Noise due to Equipment
SBB (Lot 8)
Exterior Framing – EXT-L1
NA
NA
SBB (Lot 8)
Frame Interference Walls and Install door Frames - INT-L1
NA
NA
SBB (Lot 8)
Install Early MEP to Support Top Down Drywall
NA
NA
SBB (Lot 8) Concrete
F/R/P Transformer Yard Wall
NA
NA
SBB (Lot 8) Concrete
F/R/P Transformer Yard Slab
NA
NA
Week of December 4, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Concrete
Pour Auditorium Steps – SOG1
Concrete Pumps
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Edge Form / Bulkhead – SOG North – Auditorium Steps
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Strip & Re-Shore – Deck L4S
NA
NA
SBB (Lot 8) Concrete
Edge Form – Deck L5 Roof
NA
NA
SBB (Lot 8)
Install Early MEP to support Top Down Drywall
NA
NA
SBB (Lot 8)
Hang 1st Side Top Down Drywall – INT L1
NA
NA
SBB (Lot 8)
Install Insulation and Inspect – INT L1
NA
NA
SBB (Lot 8)
F/R/P Transformer Yard Slab
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #53
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Punchlist Corrections
NA
NA
SBB (Lot 8) Concrete
Edge Form / Bulkhead - SOG North - Auditorium Steps
NA
NA
SBB (Lot 8) Concrete
Rebar - SOG North - Auditorium Steps
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Underslab Electrical Rough-in - SOG North - Auditorium Steps
NA
NA
SBB (Lot 8) Concrete
Underslab Fire Sprinkler Riser - SOG North
NA
NA
SBB (Lot 8) Concrete
QC / Inspection – Deck L4S
NA
NA
SBB (Lot 8) Concrete
Pour – Deck L4S
Concrete Pumps
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Edge Form & Transfer Beams – Deck L4S
NA
NA
SBB (Lot 8) Concrete
Stress Transfer Beams – Deck L4S
NA
NA
SBB (Lot 8) Concrete
Layout Walls & Columns -Vert L4N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
One Side Form Walls & Columns -Vert L4N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Rebar -Vert L4N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Layout & Install MEP's -Vert L4N
NA
NA
SBB (Lot 8) Concrete
Set Embeds -Vert L4N
NA
NA
SBB (Lot 8) Concrete
Layout Walls & Columns – Vert L4S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
F/R/P Transformer Yard Wall
NA
NA
Week of November 20, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Building Complete
NA
NA
SBB (Lot 8) Concrete
Form Steps – Auditorium
NA
NA
SBB (Lot 8) Concrete
QC / Inspection – Vert L4N
NA
NA
SBB (Lot 8) Concrete
Close Two Side Forms – Vert L4N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Pour – Vert L4N
Concrete Pumps
Noise due to Equipment
SBB (Lot 8) Concrete
Rebar – Vert L4S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Layout & Install MEP’s – Vert L4S
NA
NA
SBB (Lot 8) Concrete
Set Embeds – Vert L4S
NA
NA
SBB (Lot 8) Concrete
QC / Inspection – Vert L4S
NA
NA
SBB (Lot 8)
Exterior Framing – L1
NA
NA
SBB (Lot 8)
Frame Interference Walls & Install Door Frames
NA
NA
SBB (Lot 8) Concrete
F/R/P Transformer Yard Wall
NA
NA
Week of November 27, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Concrete
QC / Inspection – SOG North Auditorium Steps
NA
NA
SBB (Lot 8) Concrete
Strip Walls & Columns – Vert L4N
NA
NA
SBB (Lot 8) Concrete
Close Two Side Forms - Vert L4S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Pour - Vert L4S
Concrete Pumps
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Walls & Columns – Vert L4S
Crane
Noise due to Equipment
SBB (Lot 8)
Exterior Framing – EXT-L1
NA
NA
SBB (Lot 8)
Frame Interference Walls and Install door Frames - INT-L1
NA
NA
SBB (Lot 8)
Install Early MEP to Support Top Down Drywall
NA
NA
SBB (Lot 8) Concrete
F/R/P Transformer Yard Wall
NA
NA
SBB (Lot 8) Concrete
F/R/P Transformer Yard Slab
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #52
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Develop punch list
NA
NA
BIO
Startup and Test Fire Alarm System
NA
NA
BIO
Startup and Test Lighting
NA
NA
BIO
Startup and Test mechanical / Control Systems
NA
NA
BIO
Startup and Test Walk-in Cooler
NA
NA
BIO
Punchlist Corrections
NA
NA
SBB (Lot 8) Concrete
Rebar / PT Cables
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Electrical Rough-in
NA
NA
SBB (Lot 8) Concrete
F/R/P Transformer Yard Footings
NA
NA
SBB (Lot 8) Concrete
F/R/P Transformer Yard Walls
NA
NA
SBB (Lot 8) Concrete
Install Water Line – Campus Dr POC to SBB POC
NA
NA
SBB (Lot 8) Concrete
Rebar / PT Cables
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Electrical Rough-in
NA
NA
SBB (Lot 8) Concrete
Deck Depressions
NA
NA
SBB (Lot 8) Util
Shutdown and Tie-in Water Line to Pump House
NA
NA
Week of November 13, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Punchlist Corrections
NA
NA
SBB (Lot 8) Concrete
Edge Form / Bulkhead - SOG North - Auditorium Steps
NA
NA
SBB (Lot 8) Concrete
Rebar - SOG North - Auditorium Steps
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Underslab Electrical Rough-in - SOG North - Auditorium Steps
NA
NA
SBB (Lot 8) Concrete
Underslab Fire Sprinkler Riser - SOG North
NA
NA
SBB (Lot 8) Concrete
QC / Inspection – Deck L4S
NA
NA
SBB (Lot 8) Concrete
Pour – Deck L4S
Concrete Pumps
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Edge Form & Transfer Beams – Deck L4S
NA
NA
SBB (Lot 8) Concrete
Stress Transfer Beams – Deck L4S
NA
NA
SBB (Lot 8) Concrete
Layout Walls & Columns -Vert L4N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
One Side Form Walls & Columns -Vert L4N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Rebar -Vert L4N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Layout & Install MEP's -Vert L4N
NA
NA
SBB (Lot 8) Concrete
Set Embeds -Vert L4N
NA
NA
SBB (Lot 8) Concrete
Layout Walls & Columns – Vert L4S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
F/R/P Transformer Yard Wall
NA
NA
Week of November 20, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Building Complete
NA
NA
SBB (Lot 8) Concrete
Form Steps – Auditorium
NA
NA
SBB (Lot 8) Concrete
QC / Inspection – Vert L4N
NA
NA
SBB (Lot 8) Concrete
Close Two Side Forms – Vert L4N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Pour – Vert L4N
Concrete Pumps
Noise due to Equipment
SBB (Lot 8) Concrete
Rebar – Vert L4S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Layout & Install MEP’s – Vert L4S
NA
NA
SBB (Lot 8) Concrete
Set Embeds – Vert L4S
NA
NA
SBB (Lot 8) Concrete
QC / Inspection – Vert L4S
NA
NA
SBB (Lot 8)
Exterior Framing – L1
NA
NA
SBB (Lot 8)
Frame Interference Walls & Install Door Frames
NA
NA
SBB (Lot 8) Concrete
F/R/P Transformer Yard Wall
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #51
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Final Clean
NA
NA
BIO
Start-up & Test Mechanical / Controls System
NA
NA
BIO
Start-up & Test Fire Alarm Systems
NA
NA
BIO
Start-up & Test Lighting
NA
NA
BIO
Start-up & Test Plumbing
NA
NA
BIO
Start-up & Test Card Reader
NA
NA
SBB (Lot 8) Concrete
Strip and Re-Shore – Deck L3N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Pour – Vert L3S
Concrete Pump
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Walls & Columns – Vert L3S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Install Water Line – Campus Dr POC to SBB POC
NA
NA
SBB (Lot 8) Concrete
F/R/P Transformer Yard Footings
NA
NA
SBB (Lot 8) Concrete
F/R/P Walls at Transformer Yard
NA
NA
SBB (Lot 8) Concrete
F/R/P Transformer Yard Slab
NA
NA
SBB (Lot 8) Concrete
Form Deck – Deck L4S
NA
NA
SBB (Lot 8) Concrete
Edge Form – Deck L4S
NA
NA
SBB (Lot 8) Concrete
Install Embeds – Deck L4S
NA
NA
SBB (Lot 8) Concrete
MEP Sleeves and Insert – Deck L4S
NA
NA
Week of November 6, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Develop punch list
NA
NA
BIO
Startup and Test Fire Alarm System
NA
NA
BIO
Startup and Test Lighting
NA
NA
BIO
Startup and Test mechanical / Control Systems
NA
NA
BIO
Startup and Test Walk-in Cooler
NA
NA
BIO
Punchlist Corrections
NA
NA
SBB (Lot 8) Concrete
Rebar / PT Cables
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Electrical Rough-in
NA
NA
SBB (Lot 8) Concrete
F/R/P Transformer Yard Footings
NA
NA
SBB (Lot 8) Concrete
F/R/P Transformer Yard Walls
NA
NA
SBB (Lot 8) Concrete
Install Water Line – Campus Dr POC to SBB POC
NA
NA
SBB (Lot 8) Concrete
Rebar / PT Cables
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Electrical Rough-in
NA
NA
SBB (Lot 8) Concrete
Deck Depressions
NA
NA
SBB (Lot 8) Util
Shutdown and Tie-in Water Line to Pump House
NA
NA
Week of November 13, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Punchlist Corrections
NA
NA
SBB (Lot 8) Concrete
Edge Form / Bulkhead - SOG North - Auditorium Steps
NA
NA
SBB (Lot 8) Concrete
Rebar - SOG North - Auditorium Steps
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Underslab Electrical Rough-in - SOG North - Auditorium Steps
NA
NA
SBB (Lot 8) Concrete
Underslab Fire Sprinkler Riser - SOG North
NA
NA
SBB (Lot 8) Concrete
QC / Inspection – Deck L4S
NA
NA
SBB (Lot 8) Concrete
Pour – Deck L4S
NA
NA
SBB (Lot 8) Concrete
Strip Edge Form & Transfer Beams – Deck L4S
NA
NA
SBB (Lot 8) Concrete
Stress Transfer Beams – Deck L4S
NA
NA
SBB (Lot 8) Concrete
Layout Walls & Columns -Vert L4N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
One Side Form Walls & Columns -Vert L4N
NA
NA
SBB (Lot 8) Concrete
Rebar -Vert L4N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Layout & Install MEP's -Vert L4N
NA
NA
SBB (Lot 8) Concrete
Set Embeds -Vert L4N
NA
NA
SBB (Lot 8) Concrete
Layout Walls & Columns – Vert L4S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
F/R/P Transformer Yard Wall
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #50
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Landscape and Irrigation
Mini-excavator
Noise due to Equipment
BIO
Install Bio-Filtration Planter
Mini-excavator
Noise due to Equipment
BIO
Start-up & Test Walk-in Cooler
NA
NA
BIO
New Water Line to Pump House / POC’s
NA
NA
BIO
Shutdown and Tie-in Water Line to Pump House
NA
NA
SBB (Lot 8) Concrete
Pour – Vert L3N
Concrete Pump
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Walls & Columns – Vert L3N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Stress Transfer Beams – Deck L3S
NA
NA
SBB (Lot 8) Concrete
Layout & Install MEPs – Vert L3S
NA
NA
SBB (Lot 8) Concrete
Set Embeds – Vert L3S
NA
NA
SBB (Lot 8) Concrete
QC/Inspection – Vert L3S
NA
NA
SBB (Lot 8) Concrete
Close Two Side Forms – Vert L3S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Form Deck – L4S
NA
NA
Week of October 30, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Start-up & Test Mechanical / Controls System
NA
NA
BIO
Start-up & Test Fire Alarm Systems
NA
NA
BIO
Start-up & Test Lighting
NA
NA
SBB (Lot 8) Concrete
Strip and Re-Shore – Deck L3N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Pour – Vert L3S
Concrete Pump
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Walls & Columns – Vert L3S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Install Water Line – Campus Dr POC to SBB POC
NA
NA
SBB (Lot 8) Concrete
F/R/P Transformer Yard Footings
NA
NA
SBB (Lot 8) Concrete
F/R/P Walls at Transformer Yard
NA
NA
SBB (Lot 8) Concrete
F/R/P Transformer Yard Slab
NA
NA
Week of November 6, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Develop punch list
NA
NA
BIO
Startup and Test Fire Alarm System
NA
NA
BIO
Startup and Test Lighting
NA
NA
SBB (Lot 8) Concrete
Rebar / PT Cables
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Electrical Rough-in
NA
NA
SBB (Lot 8) Concrete
F/R/P Transformer Yard Footings
NA
NA
SBB (Lot 8) Concrete
F/R/P Transformer Yard Walls
NA
NA
SBB (Lot 8) Concrete
Install Water Line – Campus Dr POC to SBB POC
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #49
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Install HVAC Trim
NA
NA
BIO
Install Fire Alarm Devices and Trim
NA
NA
BIO
Install Light Fixtures
NA
NA
BIO
Install Site Furnishings
NA
NA
BIO
Landscape and Irrigation
Mini-excavator
Noise due to Equipment
BIO
Install Bio-Filtration Planter
Mini-excavator
Noise due to Equipment
BIO
MEPT Startup and Testing
NA
NA
BIO
Install Walk-in Cooler
NA
NA
SBB (Lot 8) Concrete
Stress Transfer Beams – Deck L3N
NA
NA
SBB (Lot 8) Concrete
Rebar – Vert L3N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Layout & Install MEP’s – Vert L3N
NA
NA
SBB (Lot 8) Concrete
Set Embeds – Vert L3N
NA
NA
SBB (Lot 8) Concrete
QC / Inspection – Vert L3N
NA
NA
SBB (Lot 8) Concrete
Close two side Forms – Vert L3N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Deck Depressions – Deck L3S
NA
NA
SBB (Lot 8) Concrete
QC / Inspection – Deck L3S
NA
NA
SBB (Lot 8) Concrete
Pour – Deck L3S
Concrete Pumps
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Edge Form – Deck L3S
NA
NA
Week of October 23, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Landscape and Irrigation
Mini-excavator
Noise due to Equipment
BIO
Install Bio-Filtration Planter
Mini-excavator
Noise due to Equipment
BIO
Start-up & Test Walk-in Cooler
NA
NA
BIO
New Water Line to Pump House / POC’s
NA
NA
BIO
Shutdown and Tie-in Water Line to Pump House
NA
NA
SBB (Lot 8) Concrete
Pour – Vert L3N
Concrete Pump
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Walls & Columns – Vert L3N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Stress Transfer Beams – Deck L3S
NA
NA
SBB (Lot 8) Concrete
Layout & Install MEPs – Vert L3S
NA
NA
SBB (Lot 8) Concrete
Set Embeds – Vert L3S
NA
NA
SBB (Lot 8) Concrete
QC/Inspection – Vert L3S
NA
NA
SBB (Lot 8) Concrete
Close Two Side Forms – Vert L3S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Form Deck – L4S
NA
NA
Week of October 30, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Start-up & Test Mechanical / Controls System
NA
NA
BIO
Start-up & Test Fire Alarm Systems
NA
NA
BIO
Start-up & Test Lighting
NA
NA
SBB (Lot 8) Concrete
Strip and Re-Shore – Deck L3N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Pour – Vert L3S
Concrete Pump
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Walls & Columns – Vert L3S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Install Water Line – Campus Dr POC to SBB POC
NA
NA
SBB (Lot 8) Concrete
F/R/P Walls at Transformer Yard
NA
NA
SBB (Lot 8) Concrete
F/R/P Transformer Yard Slab
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #48
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Parapet Coping / Flashing / Louvers
NA
NA
BIO
Pull Wire from transformer to Panels
NA
NA
BIO
Hook-up and Terminate Transformer
NA
NA
BIO
Hook-up and Terminate Condensing Units
NA
NA
BIO
Install Walk-in Cooler
NA
NA
BIO
Install Casework
NA
NA
BIO
Install Plumbing Fixtures
NA
NA
SBB (Lot 8) Concrete
Deck Depressions – Deck L3N
NA
NA
SBB (Lot 8) Concrete
QC / Inspection – Deck L3N
NA
NA
SBB (Lot 8) Concrete
Pour – Deck L3N
Concrete Pumps
Noise Due to Equipment
SBB (Lot 8) Concrete
Strip Edge Form and Transfer Beams – Deck L3N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Cure for Stress – Deck L3N
NA
NA
SBB (Lot 8) Concrete
Install Embeds – Deck L3S
NA
NA
SBB (Lot 8) Concrete
MEP Sleeves and Inserts – Deck L3S
NA
NA
SBB (Lot 8) Concrete
Layout Walls and Columns – Vert L3N
NA
NA
SBB (Lot 8) Concrete
One Side Form Walls and Columns – Vert L3N
NA
NA
SBB (Lot 8) Concrete
Rebar / PT Cables – Deck L3S
Crane
Noise due to Equipment
Week of October 16, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Install HVAC Trim
NA
NA
BIO
Install Fire Alarm Devices and Trim
NA
NA
BIO
Install Light Fixtures
NA
NA
BIO
Install Site Furnishings
NA
NA
BIO
Landscape and Irrigation
Mini-excavator
Noise due to Equipment
BIO
Install Bio-Filtration Planter
Mini-excavator
Noise due to Equipment
BIO
MEPT Startup and Testing
NA
NA
BIO
Install Walk-in Cooler
NA
NA
SBB (Lot 8) Concrete
Stress Transfer Beams – Deck L3N
NA
NA
SBB (Lot 8) Concrete
Rebar – Vert L3N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Layout & Install MEP’s – Vert L3N
NA
NA
SBB (Lot 8) Concrete
Set Embeds – Vert L3N
NA
NA
SBB (Lot 8) Concrete
QC / Inspection – Vert L3N
NA
NA
SBB (Lot 8) Concrete
Close two side Forms – Vert L3N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Deck Depressions – Deck L3S
NA
NA
SBB (Lot 8) Concrete
QC / Inspection – Deck L3S
NA
NA
SBB (Lot 8) Concrete
Pour – Deck L3S
Concrete Pumps
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Edge Form – Deck L3S
NA
NA
Week of October 23, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Landscape and Irrigation
Mini-excavator
Noise due to Equipment
BIO
Install Bio-Filtration Planter
Mini-excavator
Noise due to Equipment
BIO
Start-up & Test Walk-in Cooler
NA
NA
BIO
New Water Line to Pump House / POC’s
NA
NA
BIO
Shutdown and Tie-in Water Line to Pump House
NA
NA
SBB (Lot 8) Concrete
Pour – Vert L3N
Concrete Pump
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Walls & Columns – Vert L3N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Stress Transfer Beams – Deck L3S
NA
NA
SBB (Lot 8) Concrete
Layout & Install MEPs – Vert L3S
NA
NA
SBB (Lot 8) Concrete
Set Embeds – Vert L3S
NA
NA
SBB (Lot 8) Concrete
QC/Inspection – Vert L3S
NA
NA
SBB (Lot 8) Concrete
Close Two Side Forms – Vert L3S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Form Deck – L4S
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #47
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
H/T/F Drywall
NA
NA
BIO
Set Transformer
NA
NA
BIO
Set Condensing Units
NA
NA
BIO
Hook-up and Terminate Transformer
NA
NA
BIO
Hook-up and Terminate Condensing Units
NA
NA
SBB (Lot 8) Concrete
Install Embed – Deck L3N
NA
NA
SBB (Lot 8) Concrete
MEP Sleeves and Inserts - Deck L3N
NA
NA
SBB (Lot 8) Concrete
Rebar / PT Cables - Deck L3N
NA
NA
SBB (Lot 8) Concrete
Electrical Rough-in - Deck L3N
NA
NA
SBB (Lot 8) Concrete
Form Deck - Deck L3S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Edge Form - Deck L3S
NA
NA
SBB (Lot 8)
F/R/P Manlift Pad
NA
NA
SBB (Lot 8)
Storm drain
Backhoe
Noise due to equipment
Week of October 9, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Parapet Coping / Flashing / Louvers
NA
NA
BIO
Pull Wire from transformer to Panels
NA
NA
BIO
Hook-up and Terminate Transformer
NA
NA
BIO
Hook-up and Terminate Condensing Units
NA
NA
SBB (Lot 8) Concrete
Deck Depressions – Deck L3N
NA
NA
SBB (Lot 8) Concrete
QC / Inspection – Deck L3N
NA
NA
SBB (Lot 8) Concrete
Pour – Deck L3N
Concrete Pumps
Noise Due to Equipment
SBB (Lot 8) Concrete
Strip Edge Form and Transfer Beams – Deck L3N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Cure for Stress – Deck L3N
NA
NA
SBB (Lot 8) Concrete
Install Embeds – Deck L3S
NA
NA
SBB (Lot 8) Concrete
MEP Sleeves and Inserts – Deck L3S
NA
NA
SBB (Lot 8) Concrete
Layout Walls and Columns – Vert L3N
NA
NA
SBB (Lot 8) Concrete
One Side Form Walls and Columns – Vert L3N
NA
NA
SBB (Lot 8) Concrete
Rebar / PT Cables – Deck L3S
Crane
Noise due to Equipment
Week of October 16, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Install HVAC Trim
NA
NA
BIO
Install Fire Alarm Devices and Trim
NA
NA
BIO
Install Light Fixtures
NA
NA
BIO
Install Site Furnishings
NA
NA
BIO
Landscape and Irrigation
NA
NA
BIO
Install Bio-Filtration Planter
NA
NA
BIO
MEPT Startup and Testing
NA
NA
SBB (Lot 8) Concrete
Stress Transfer Beams – Deck L3N
NA
NA
SBB (Lot 8) Concrete
Rebar – Vert L3N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Layout & Install MEP’s – Vert L3N
NA
NA
SBB (Lot 8) Concrete
Set Embeds – Vert L3N
NA
NA
SBB (Lot 8) Concrete
QC / Inspection – Vert L3N
NA
NA
SBB (Lot 8) Concrete
Close two side Forms – Vert L3N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Deck Depressions – Deck L3S
NA
NA
SBB (Lot 8) Concrete
QC / Inspection – Deck L3S
NA
NA
SBB (Lot 8) Concrete
Pour – Deck L3S
Concrete Pumps
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Edge Form – Deck L3S
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #46
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
In-Wall & Overhead Electrical Rough-in
NA
NA
BIO
Pull Electrical and Low Voltage Wire
NA
NA
BIO
Fine Grade for Finish Site Work
Heavy Equipment
Noise due to Equipment
BIO
F/R/P Equipment Pads
NA
NA
BIO
F/R/P New Flatwork to Tie Into Existing
NA
NA
SBB (Lot 8) Concrete
Strip Walls and Columns – Vertical L2N
NA
NA
SBB (Lot 8) Concrete
Set Embeds - Vertical L2S
NA
NA
SBB (Lot 8) Concrete
QC Inspection - Vertical L2S
NA
NA
SBB (Lot 8) Concrete
Close two side forms - Vertical L2S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Pour - Vertical L2S
Concrete Pump
Noise due to Equipment
SBB (Lot 8) Concrete
Strip walls & Columns - Vertical L2S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Form Deck – Deck L3N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Edge Form – Deck L3N
NA
NA
Week of October 2, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
H/T/F Drywall
NA
NA
BIO
Set Transformer
NA
NA
BIO
Set Condensing Units
NA
NA
BIO
Hook-up and Terminate Transformer
NA
NA
BIO
Hook-up and Terminate Condensing Units
NA
NA
SBB (Lot 8) Concrete
Install Embed – Deck L3N
NA
NA
SBB (Lot 8) Concrete
MEP Sleeves and Inserts - Deck L3N
NA
NA
SBB (Lot 8) Concrete
Rebar / PT Cables - Deck L3N
NA
NA
SBB (Lot 8) Concrete
Electrical Rough-in - Deck L3N
NA
NA
SBB (Lot 8) Concrete
Form Deck - Deck L3S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Edge Form - Deck L3S
NA
NA
SBB (Lot 8)
F/R/P Manlift Pad
NA
NA
Week of October 9, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Parapet Coping / Flashing / Louvers
NA
NA
BIO
Pull Wire from transformer to Panels
NA
NA
BIO
Hook-up and Terminate Transformer
NA
NA
BIO
Hook-up and Terminate Condensing Units
NA
NA
SBB (Lot 8) Concrete
Deck Depressions – Deck L3N
NA
NA
SBB (Lot 8) Concrete
QC / Inspection – Deck L3N
NA
NA
SBB (Lot 8) Concrete
Pour – Deck L3N
Concrete Pumps
Noise Due to Equipment
SBB (Lot 8) Concrete
Strip Edge Form and Transfer Beams – Deck L3N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Cure for Stress – Deck L3N
NA
NA
SBB (Lot 8) Concrete
Instll Embeds – Deck L3S
NA
NA
SBB (Lot 8) Concrete
MEP Sleeves and Inserts – Deck L3S
NA
NA
SBB (Lot 8) Concrete
Rebar / PT Cables – Deck L3S
Crane
Noise due to Equipment
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #45
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Parapet Coping/Flashing/Louvers
NA
NA
BIO
Downspouts
NA
NA
BIO
In-Wall and overhead plumbing work
NA
NA
BIO
Set fan coil units
NA
NA
SBB (Lot 8) Concrete
Strip & Re-Shore – Deck L2N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Layout and Install MEP’s – Vertical L2N
NA
NA
SBB (Lot 8) Concrete
Set Embeds – Vertical L2N
NA
NA
SBB (Lot 8) Concrete
QC / Inspection– Vertical L2N
NA
NA
SBB (Lot 8) Concrete
Close Two Side Forms– Vertical L2N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Pour– Vertical L2N
Concrete Pumps
Noise due to equipment
SBB (Lot 8) Concrete
Pour – Deck L2S
Concrete Pumps
Noise due to equipment
SBB (Lot 8) Concrete
Strip Edge Form – Deck L2S
NA
NA
SBB (Lot 8) Concrete
Stress Transfer Beams– Deck L2S
NA
NA
SBB (Lot 8) Concrete
Layout Walls and Columns – Vert L2S
NA
NA
SBB (Lot 8) Concrete
One side form walls and columns – Vert L2S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Rebar – Vert L2S
NA
NA
SBB (Lot 8) Concrete
Layout and Install MEP’s – Vert L2S
NA
NA
Week of September 25, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
In-Wall & Overhead Electrical Rough-in
NA
NA
BIO
Pull Electrical and Low Voltage Wire
NA
NA
BIO
Fine Grade for Finish Site Work
Heavy Equipment
Noise due to Equipment
BIO
F/R/P Equipment Pads
NA
NA
BIO
F/R/P New Flatwork to Tie Into Existing
NA
NA
SBB (Lot 8) Concrete
Strip Walls and Columns – Vertical L2N
NA
NA
SBB (Lot 8) Concrete
Set Embeds - Vertical L2S
NA
NA
SBB (Lot 8) Concrete
QC Inspection - Vertical L2S
NA
NA
SBB (Lot 8) Concrete
Close two side forms - Vertical L2S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Pour - Vertical L2S
Concrete Pump
Noise due to Equipment
SBB (Lot 8) Concrete
Strip walls & Columns - Vertical L2S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Form Deck – Deck L3N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Edge Form – Deck L3N
NA
NA
Week of October 2, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
H/T/F Drywall
NA
NA
BIO
Set Transformer
NA
NA
BIO
Set Condensing Units
NA
NA
BIO
Hook-up and Terminate Transformer
NA
NA
BIO
Hook-up and Terminate Condensing Units
NA
NA
SBB (Lot 8) Concrete
Install Embed – Deck L3N
NA
NA
SBB (Lot 8) Concrete
MEP Sleeves and Inserts - Deck L3N
NA
NA
SBB (Lot 8) Concrete
Rebar / PT Cables - Deck L3N
NA
NA
SBB (Lot 8) Concrete
Electrical Rough-in - Deck L3N
NA
NA
SBB (Lot 8) Concrete
Form Deck - Deck L3S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Edge Form - Deck L3S
NA
NA
SBB (Lot 8)
F/R/P Manlift Pad
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #44
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Install Metal Decking
Gradall
Noise due to equipment
BIO
Framing and Insulation
Gradall
Noise due to equipment
SBB (Lot 8) Concrete
Deck Pour – L2N
Concrete Pumps
Noise due to equipment
SBB (Lot 8) Concrete
Strip Edge Form – L2N
NA
NA
SBB (Lot 8) Concrete
Layout Walls and Columns – L2N
NA
NA
SBB (Lot 8) Concrete
Rebar – L2N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Layout and Install MEPs – L2N
NA
NA
SBB (Lot 8) Concrete
Set Embeds – L2N
NA
NA
SBB (Lot 8) Concrete
Electrical Rough-in – L2S
NA
NA
SBB (Lot 8) Concrete
Deck Pour – L2S
Concrete Pumps
Noise due to equipment
SBB (Lot 8) Concrete
Deck Depressions – L2S
NA
NA
SBB (Lot 8) Concrete
Install Embeds – L2S
N/A
N/A
SBB (Lot 8) Concrete
Install Embeds – L2S
N/A
N/A
SBB (Lot 8) Concrete
Rebar / PT Cables – L2S
Crane
Noise due to Equipment
Week of September 18, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Parapet Coping/Flashing/Louvers
NA
NA
BIO
Downspouts
NA
NA
BIO
In-Wall and overhead plumbing work
NA
NA
BIO
Set fan coil units
NA
NA
SBB (Lot 8) Concrete
Strip & Re-Shore – Deck L2N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Layout and Install MEP’s – Vertical L2N
NA
NA
SBB (Lot 8) Concrete
Set Embeds – Vertical L2N
NA
NA
SBB (Lot 8) Concrete
QC / Inspection– Vertical L2N
NA
NA
SBB (Lot 8) Concrete
Close Two Side Forms– Vertical L2N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Pour– Vertical L2N
Concrete Pumps
Noise due to equipment
SBB (Lot 8) Concrete
Pour – Deck L2S
Concrete Pumps
Noise due to equipment
SBB (Lot 8) Concrete
Strip Edge Form – Deck L2S
NA
NA
SBB (Lot 8) Concrete
Stress Transfer Beams– Deck L2S
NA
NA
SBB (Lot 8) Concrete
Layout Walls and Columns – Vert L2S
NA
NA
SBB (Lot 8) Concrete
One side form walls and columns – Vert L2S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Rebar – Vert L2S
NA
NA
SBB (Lot 8) Concrete
Layout and Install MEP’s – Vert L2S
NA
NA
Week of September 25, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
In-Wall & Overhead Electrical Rough-in
NA
NA
BIO
Pull Electrical and Low Voltage Wire
NA
NA
BIO
Fine Grade for Finish Site Work
Heavy Equipment
Noise due to Equipment
BIO
F/R/P Equipment Pads
NA
NA
BIO
F/R/P New Flatwork to Tie Into Existing
NA
NA
SBB (Lot 8) Concrete
Strip Walls and Columns – Vertical L2N
NA
NA
SBB (Lot 8) Concrete
Set Embeds - Vertical L2S
NA
NA
SBB (Lot 8) Concrete
QC Inspection - Vertical L2S
NA
NA
SBB (Lot 8) Concrete
Close two side forms - Vertical L2S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Pour - Vertical L2S
Concrete Pump
Noise due to Equipment
SBB (Lot 8) Concrete
Strip walls & Columns - Vertical L2S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Form Deck – Deck L3N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Edge Form – Deck L3N
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #43
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Concrete
Pour SOG
Concrete Pump
Noise due to Equipment
BIO
Backfill
Mini-Excavator
Noise due to Equipment
BIO
Erect Steel Roof Structure
N/A
N/A
SBB (Lot 8) Concrete
MEP Sleeves and Inserts – L2N
N/A
N/A
SBB (Lot 8) Concrete
Rebar / PT Cables – L2N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Electrical Rough-in – L2N
N/A
N/A
SBB (Lot 8) Concrete
Deck Depressions – L2N
N/A
N/A
SBB (Lot 8) Concrete
Edge Form – L2S
N/A
N/A
SBB (Lot 8) Concrete
QC / Inspection – L2N
N/A
N/A
SBB (Lot 8) Concrete
Edge Form L2S
N/A
N/A
SBB (Lot 8) Concrete
Install Embeds – L2S
N/A
N/A
SBB (Lot 8) Concrete
MEP Sleeves and Inserts – L2S
N/A
N/A
SBB (Lot 8) Concrete
Rebar / PT Cables – L2S
Crane
Noise due to Equipment
Week of September 11, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Install Metal Decking
Gradall
Noise due to equipment
SBB (Lot 8) Concrete
Deck Pour – L2N
Concrete Pumps
Noise due to equipment
SBB (Lot 8) Concrete
Strip Edge Form – L2N
NA
NA
SBB (Lot 8) Concrete
Layout Walls and Columns – L2N
NA
NA
SBB (Lot 8) Concrete
Rebar – L2N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Layout and Install MEPs – L2N
NA
NA
SBB (Lot 8) Concrete
Set Embeds – L2N
NA
NA
SBB (Lot 8) Concrete
Electrical Rough-in – L2S
NA
NA
SBB (Lot 8) Concrete
Deck Pour – L2S
Concrete Pumps
Noise due to equipment
SBB (Lot 8) Concrete
Deck Depressions – L2S
NA
NA
Week of September 18, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Install Door Frames
NA
NA
BIO
Install Doors and Hardware
NA
NA
BIO
Install Roofing System
Gradall
Noise due to equipment
BIO
Install Electrical Panels
NA
NA
SBB (Lot 8) Concrete
Strip & Re-Shore – L2N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Vertical Pour – L2N
Concrete Pumps
Noise due to equipment
SBB (Lot 8) Concrete
Strip Walls and Columns – L2N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Rebar – L2S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Layout and Install MEPs – L2S
NA
NA
SBB (Lot 8) Concrete
Set Embeds – L2S
NA
NA
SBB (Lot 8) Concrete
Form Deck – L3N
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #42
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Concrete
Fine Grade – SOG
N/A
N/A
BIO
Concrete
Vapor Barrier – SOG
N/A
N/A
BIO
Concrete
Rebar – SOG
Gradall
Noise due to Equipment
BIO
Concrete
QC/ Inspection – SOG
N/A
N/A
SBB (Lot 8) Concrete
Pour SOG 2 – L1S
Concrete Pump
Noise due to Equipment
SBB (Lot 8) Sitework
Chilled Water
Mini-excavator
Noise due to Equipment
SBB (Lot 8) Concrete
Edge Form
N/A
N/A
SBB (Lot 8) Concrete
Install Embeds
N/A
N/A
SBB (Lot 8) Concrete
MEP Sleeves & Inserts
N/A
N/A
SBB (Lot 8) Concrete
Rebar / PT Cables
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Electrical Rough-in
N/A
N/A
SBB (Lot 8) Concrete
Deck Depressions
N/A
N/A
Week of September 4, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Concrete
Pour SOG
Concrete Pump
Noise due to Equipment
BIO
Backfill
Mini-Excavator
Noise due to Equipment
BIO
Erect Steel Roof Structure
N/A
N/A
SBB (Lot 8) Concrete
MEP Sleeves and Inserts – L2N
N/A
N/A
SBB (Lot 8) Concrete
Rebar / PT Cables – L2N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Electrical Rough-in – L2N
N/A
N/A
SBB (Lot 8) Concrete
Deck Depressions – L2N
N/A
N/A
SBB (Lot 8) Concrete
Edge Form – L2S
N/A
N/A
SBB (Lot 8) Concrete
QC / Inspection – L2N
N/A
N/A
SBB (Lot 8) Concrete
Edge Form L2S
N/A
N/A
SBB (Lot 8) Concrete
Install Embeds – L2S
N/A
N/A
SBB (Lot 8) Concrete
MEP Sleeves and Inserts – L2S
N/A
N/A
SBB (Lot 8) Concrete
Rebar / PT Cables – L2S
Crane
Noise due to Equipment
Week of September 11, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bio
Install Metal Decking
NA
NA
SBB (Lot 8) Concrete
Pour – L2N
Concrete Pumps
Noise due to equipment
SBB (Lot 8) Concrete
Strip Edge Form – L2N
NA
NA
SBB (Lot 8) Concrete
Layout Walls and Columns – L2N
NA
NA
SBB (Lot 8) Concrete
Rebar – L2N
NA
NA
SBB (Lot 8) Concrete
Layout and Install MEPs – L2N
NA
NA
SBB (Lot 8) Concrete
Set Embeds – L2N
NA
NA
SBB (Lot 8) Concrete
Electrical Rough-in – L2S
NA
NA
SBB (Lot 8) Concrete
Deck Depressions – L2S
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #41
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Underslab Utilities
Install Underslab Plumbing Rough-in
N/A
N/A
BIO
Underslab Utilities
Install Underslab Electrical Rough-in
N/A
N/A
SBB (Lot 8)
Sitework
Chilled Water
Excavator
Noise due to Equipment
SBB (Lot 8) Concrete
Set Screeds – SOG North
N/A
N/A
SBB (Lot 8) Concrete
Q/C Inspection – SOG North
N/A
N/A
SBB (Lot 8) Concrete
Rebar – SOG North
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Pour – SOG North
Concrete Pumps and Trucks
Noise due to Equipment
SBB (Lot 8) Concrete
Edge Form / Bulkhead – SOG South
N/A
N/A
SBB (Lot 8) Concrete
Rebar – SOG South
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
QC/ Inspection – SOG South
N/A
N/A
SBB (Lot 8) Concrete
Pour – SOG South
Concrete Pumps and Trucks
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Edge Form / Bulkhead – SOG South
N/A
N/A
SBB (Lot 8) Concrete
Form Deck
N/A
N/A
SBB (Lot 8) Concrete
Edge Form
N/A
N/A
Week of August 28, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Concrete
Fine Grade – SOG
N/A
N/A
BIO
Concrete
Vapor Barrier – SOG
N/A
N/A
BIO
Concrete
Rebar – SOG
Gradall
Noise due to Equipment
BIO
Concrete
QC/ Inspection – SOG
N/A
N/A
SBB (Lot 8) Concrete
Pour SOG 2 – L1S
Concrete Pump
Noise due to Equipment
SBB (Lot 8) Sitework
Chilled Water
Mini-excavator
Noise due to Equipment
SBB (Lot 8) Concrete
Edge Form
N/A
N/A
SBB (Lot 8) Concrete
Install Embeds
N/A
N/A
SBB (Lot 8) Concrete
MEP Sleeves & Inserts
N/A
N/A
SBB (Lot 8) Concrete
Rebar / PT Cables
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Electrical Rough-in
N/A
N/A
SBB (Lot 8) Concrete
Deck Depressions
N/A
N/A
Week of September 4, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Concrete
Pour SOG
Concrete Pump
Noise due to Equipment
BIO
Erect Steel Roof Structure
N/A
N/A
SBB (Lot 8) Concrete
MEP Sleeves and Inserts – L2N
N/A
N/A
SBB (Lot 8) Concrete
Rebar / PT Cables – L2N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Electrical Rough-in – L2N
N/A
N/A
SBB (Lot 8) Concrete
Deck Depressions – L2N
N/A
N/A
SBB (Lot 8) Concrete
Edge Form – L2S
N/A
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #40
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
CMU Walls
Set Scaffold and Erect CMU Block Structure
Gradall
Noise due to Equipment
BIO
CMU Walls
Set Anchor Bolts
N/A
N/A
BIO
CMU Walls
Grout/Clean-Up/Remove Scaffold
N/A
N/A
SBB (Lot 8)
Concrete
Install Vapor Barrier – SOG North
N/A
N/A
SBB (Lot 8) Concrete
Install Electrical Rough-in – SOG North
N/A
N/A
SBB (Lot 8) Concrete
Rebar – SOG North
Crane
Noise due to Equipment
SBB (Lot 8)
Concrete
Underslab Plumbing Rough-In – SOG South
N/A
N/A
SBB (Lot 8)
Concrete
Underslab Electrical Rough-In – SOG South
N/A
N/A
SBB (Lot 8)
Concrete
Fine Grade – SOG South
N/A
N/A
SBB (Lot 8)
Concrete
Install Vapor Barrier – SOG South
N/A
N/A
Week of August 21, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Underslab Utilities
Install Underslab Plumbing Rough-in
N/A
N/A
BIO
Underslab Utilities
Install Underslab Electrical Rough-in
N/A
N/A
SBB (Lot 8)
Sitework
Chilled Water
Excavator
Noise due to Equipment
SBB (Lot 8) Concrete
Set Screeds – SOG North
N/A
N/A
SBB (Lot 8) Concrete
Q/C Inspection – SOG North
N/A
N/A
SBB (Lot 8) Concrete
Rebar – SOG North
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Pour – SOG North
Concrete Pumps and Trucks
Noise due to Equipment
SBB (Lot 8) Concrete
Edge Form / Bulkhead – SOG South
N/A
N/A
SBB (Lot 8) Concrete
Rebar – SOG South
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
QC/ Inspection – SOG South
N/A
N/A
SBB (Lot 8) Concrete
Pour – SOG South
Concrete Pumps and Trucks
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Edge Form / Bulkhead – SOG South
N/A
N/A
SBB (Lot 8) Concrete
Form Deck
N/A
N/A
SBB (Lot 8) Concrete
Edge Form
N/A
N/A
Week of August 28, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Concrete
Fine Grade – SOG
N/A
N/A
BIO
Concrete
Vapor Barrier – SOG
N/A
N/A
BIO
Concrete
Rebar – SOG
Gradall
Noise due to Equipment
BIO
Concrete
QC/ Inspection – SOG
N/A
N/A
SBB (Lot 8) Sitework
Chilled Water
Mini-excavator
Noise due to Equipment
SBB (Lot 8) Concrete
Edge Form
N/A
N/A
SBB (Lot 8) Concrete
Install Embeds
N/A
N/A
SBB (Lot 8) Concrete
MEP Sleeves & Inserts
N/A
N/A
SBB (Lot 8) Concrete
Rebar / PT Cables
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Electrical Rough-in
N/A
N/A
SBB (Lot 8) Concrete
Deck Depressions
N/A
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #39
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Underslab Utilities
Install Underslab Plumbing Rough-In
N/A
N/A
BIO
Underslab Utilities
Install Underslab Electrical Rough-In
N/A
N/A
SBB (Lot 8) Concrete
Install Vapor Barrier – SOG North
N/A
N/A
SBB (Lot 8) Concrete
Edge Form / Bulkhead – SOG North
N/A
N/A
SBB (Lot 8) Concrete
Rebar – SOG North
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Set Screeds – SOG North
N/A
N/A
SBB (Lot 8) Concrete
QC / Inspection – SOG North
N/A
N/A
SBB (Lot 8) Concrete
Pour – SOG North
Concrete Pumps and Trucks
Noise due to Equipment
SBB (Lot 8)
Concrete
Underslab Plumbing Rough-In – SOG South
N/A
N/A
SBB (Lot 8)
Concrete
Underslab Electrical Rough-In
N/A
N/A
SBB (Lot 8)
Concrete
Backfill Footings, Walls & Columns – SOG South
Dump Truck
Noise due to Equipment
Week of August 14, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
CMU Walls
Set Scaffold & Erect CMU Block Structure
Forklift
Noise due to Equipment
SBB (Lot 8)
Sitework
Chilled Water
Excavator
Noise due to Equipment
SBB (Lot 8) Concrete
Fine Grade – SOG South
Skid Steer
Noise due to Equipment
SBB (Lot 8) Concrete
Install Vapor Barrier – SOG South
N/A
N/A
SBB (Lot 8) Concrete
Deliver/ Shake Out Elevated Deck Form Work
Delivery Trucks
Noise due to Equipment
Week of August 21, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
CMU Walls
Set Anchor Bolts
N/A
N/A
BIO
CMU Walls
Grout / Clean-up / Remove Scaffold CMU Walls
N/A
N/A
SBB (Lot 8) Sitework
Chilled Water
Excavator
Noise due to Equipment
SBB (Lot 8) Concrete
Edge Form / Bulkhead – SOG South
Concrete Pumps and Trucks
Noise due to Equipment
SBB (Lot 8) Concrete
Rebar – SOG South
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
QC/ Inspection – SOG South
N/A
N/A
SBB (Lot 8) Concrete
Pour – SOG South
Concrete Pumps and Trucks
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Edge Form / Bulkhead – SOG South
N/A
N/A
SBB (Lot 8) Concrete
Form Deck
Crane
Noise Due to Equipment
SBB (Lot 8) Concrete
Edge Form
N/A
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #38
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Foundations
Excavate Foundations
Mini-Excavator and Skid Steer
Noise due to Equipment
BIO
Foundations
Rebar Foundations
N/A
N/A
BIO
Foundations
QC/ Inspection Foundations
N/A
N/A
BIO
Foundations
Pour Foundations
Concrete Pumps and Trucks
Noise due to Equipment
SBB (Lot 8) Concrete
Close Two Side Form – Core Wall – Pour 2
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Pour – Core Wall – Pour 2
Concrete Pumps and Trucks
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Walls – Core Walls – Pour 2
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Shotcrete – Retaining Wall
Concrete Pumps and Trucks
Noise due to Equipment
SBB (Lot 8) Concrete
Removed Rebound – Retaining Wall
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Remove Scaffold
N/A
N/A
SBB (Lot 8) Concrete
Backfill Footings, Walls & Columns – SOG North
Dump Trucks
Noise due to Equipment
SBB (Lot 8) Concrete
Fine Grade – SOG North
Skid Steer
Noise due to Equipment
SBB (Lot 8) Concrete
Underslab Plumbing Rough-In – SOG South
N/A
N/A
SBB (Lot 8)
Concrete
Underslab Electrical Rough-In
N/A
N/A
Week of August 7, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Underslab Utilities
Install Underslab Plumbing Rough-In
N/A
N/A
BIO
Underslab Utilities
Install Underslab Electrical Rough-In
N/A
N/A
SBB (Lot 8) Concrete
Install Vapor Barrier – SOG North
N/A
N/A
SBB (Lot 8) Concrete
Edge Form / Bulkhead – SOG North
N/A
N/A
SBB (Lot 8) Concrete
Rebar – SOG North
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Set Screeds – SOG North
N/A
N/A
SBB (Lot 8) Concrete
QC / Inspection – SOG North
N/A
N/A
SBB (Lot 8) Concrete
Pour – SOG North
Concrete Pumps and Trucks
Noise due to Equipment
SBB (Lot 8)
Concrete
Underslab Plumbing Rough-In – SOG South
N/A
N/A
SBB (Lot 8)
Concrete
Underslab Electrical Rough-In
N/A
N/A
SBB (Lot 8)
Concrete
Backfill Footings, Walls & Columns – SOG South
Dump Truck
Noise due to Equipment
Week of August 14, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
CMU Walls
Set Scaffold & Erect CMU Block Structure
N/A
N/A
SBB (Lot 8) Concrete
Fine Grade – SOG South
Skid Steer
Noise due to Equipment
SBB (Lot 8) Concrete
Install Vapor Barrier – SOG South
N/A
N/A
SBB (Lot 8) Concrete
Deliver/ Shake Out Elevated Deck Form Work
Delivery Trucks
Noise due to Equipment
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Indefinitely
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #37
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Sitework
Remove (E) Electrical
Mini-Excavator and Skid Steer
Noise due to Equipment
BIO
Sitework
Grade Site & Building Pad
Mini-Excavator and Skid Steer
Noise due to Equipment
BIO
Sitework
Building Pad Certification
N/A
N/A
SBB (Lot 8) Sitework
Pothole Chilled Water
Excavator
Noise due to Equipment
SBB (Lot 8) Concrete
Rebar – Core Walls – Pour 2
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
One Side Form Walls – Core Wall – Pour 2
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Layout & Install MEP’s – Core Walls – Pour 2
N/A
N/A
SBB (Lot 8) Concrete
QC/ Inspection – Core Walls – Pour 2
N/A
N/A
SBB (Lot 8) Concrete
Set Embeds – Core Wall – Pour 2
N/A
N/A
SBB (Lot 8) Concrete
Close Two Side Forms – Shear Walls & Columns – Pour 3
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Pour – Shear Walls & Columns – Pour 3
Concrete Pumps and Trucks
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Walls – Shear Walls & Columns – Pour 3
Crane
Noise due to Equipment
SBB (Lot 8)
Concrete
Set Scaffold – Retaining Wall
N/A
N/A
SBB (Lot 8)
Concrete
Underslab Electrical Stub-Up
N/A
N/A
Week of July 31, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Foundation
Layout Foundation
N/A
N/A
BIO
Foundation
Excavate Foundations
Excavator
Noise due to Equipment
BIO
Foundation
Rebar Foundations
N/A
N/A
BIO Foundations
QC/ Inspection Foundations
N/A
N/A
BIO Foundations
Pour Foundations
Concrete Pumps and Trucks
Noise due to Equipment
SBB (Lot 8) Sitework
Install Chilled Water
Excavator
Noise due to Equipment
SBB (Lot 8) Concrete
Pour – Core Walls – Pour 2
Concrete Pumps and Trucks
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Walls – Core Walls – Pour 2
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Shotcrete Wires – Retaining Wall
N/A
N/A
SBB (Lot 8) Concrete
Shotcrete – Retaining Wall
Concrete Pump and Trucks
Noise due to Equipment
SBB (Lot 8) Concrete
Remove Rebound – Retaining Wall
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Remove Scaffold – Retaining Wall
N/A
N/A
SBB (Lot 8)
Concrete
Backfill Footings, Walls, & Columns – SOG North
Dump Trucks
Noise due to Equipment
SBB (Lot 8)
Concrete
Fine Grade – SOG North
Skid Steer
Noise due to Equipment
SBB (Lot 8)
Concrete
Underslab Plumbing Rough-in – SOG South
N/A
N/A
SBB (Lot 8)
Concrete
Backfill Footings, Walls, & Columns – SOG South
Dump Trucks
Noise due to Equipment
Week of August 07, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Underslab Utilities
Install Underslab Utilities Plumbing Rough-In
N/A
N/A
BIO
Underslab Utilities
Install Underslab Utilities Electrical Rough-In
N/A
N/A
SBB (Lot 8) Sitework
Install Chilled Water
Excavator
Noise due to Equipment
SBB (Lot 8) Concrete
Install Vapor Barrier – SOG North
N/A
N/A
SBB (Lot 8) Concrete
Edge Form / Bulkhead – SOG North
N/A
N/A
SBB (Lot 8) Concrete
Rebar - SOG North
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Set Screeds – SOG North
N/A
N/A
SBB (Lot 8) Concrete
QC/ Inspection – SOG North
N/A
N/A
SBB (Lot 8) Concrete
Pour – SOG North
Concrete pumps and Trucks
Noise due to Equipment
SBB (Lot 8)
Concrete
Underslab Plumbing Rough-In
N/A
N/A
SBB (Lot 8)
Concrete
Underslab Electrical Rough-In – SOG South
N/A
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Indefinitely
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
College Pl
College Pl
7/10 – 7/28
The College Pl loop is a one-way (single lane) road that branches off S Campus Dr. The Southern College Pl Road contains two traffic control operators helping direct traffic both to and from Parking Lot 3. The Northern College Pl Road has been closed.
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #36
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Sitework
Relocate (E) Steam Line
Mini-Excavator and Skid Steer
Noise due to Equipment
BIO
Sitework
Test & Backfill Steam Line
Skid Steer
Noise due to Equipment
BIO
Sitework
Remove (E) Electrical Line
N/A
N/A
SBB (Lot 8) Sitework
Install Sewer
Excavator
Noise due to Equipment
Partial Lane Closure of South Campus Drive
SBB (Lot 8) Sitework
Install Chilled Water
Excavator
Noise due to Equipment
SBB (Lot 8) Sitework
Strip – Column Pour 1
Crane
Noise due to Equipment
SBB (Lot 8) Sitework
Waterblast – Column Pour 1
Concrete Pressure Washer
Noise due to Equipment
SBB (Lot 8) Sitework
Strip Walls – Shear Walls & Columns – Pour 2
Crane
Noise due to Equipment
SBB (Lot 8) Sitework
Rebar – Shear Walls & Columns – Pour 3
N/A
N/A
SBB (Lot 8) Sitework
Layout & Install MEP’s – Shear Walls & Columns – Pour 3
N/A
N/A
SBB (Lot 8) Sitework
Set Embeds – Shear Walls & Columns – Pour 3
N/A
N/A
SBB (Lot 8) Sitework
QC / Inspection – Shear Walls & Columns – Pour 3
N/A
N/A
SBB (Lot 8) Sitework
Close Two Side Forms – Shear Walls & Columns – Pour 3
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Shotcrete – Retaining Wall
Concrete Pumps and Trucks
Noise due to equipment
SBB (Lot 8) Concrete
Remove Rebound – Retaining Wall
Skid Steer
Noise due to Equipment
SBB (Lot 8) Concrete
Remove Scaffolding – Retaining Wall North
N/A
N/A
SBB (Lot 8) Concrete
Backfill – Retaining Wall
Trucks and Excavator
Noise due to Equipment
SBB (Lot 8) Sitework
MEP Layout & Block outs – Retaining Wall
N/A
N/A
SBB (Lot 8) Sitework
Rebar – Retaining Wall
N/A
N/A
SBB (Lot 8)
Sitework
Set Scaffolding – Retaining Wall South
N/A
N/A
SBB (Lot 8)
Concrete
Backfill Footings, Walls & Columns – SOG North
Excavator
Noise due to Equipment
SBB (Lot 8)
Bio-Retention Planter
Backfill Bio-Retention Planter for Steam Lines
Excavator
Noise due to Equipment
Week of July 24, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Sitework
Remove (E) Electrical
Mini-Excavator and Skid Steer
Noise due to Equipment
BIO
Sitework
Grade Site & Building Pad
N/A
N/A
BIO
Sitework
Building Pad Certification
N/A
N/A
SBB (Lot 8) Sitework
Install Chilled Water
Excavator
Noise due to Equipment
SBB (Lot 8) Concrete
Pour – Shear Walls & Columns – Pour 3
Concrete pumps and Trucks
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Walls – Shear Walls & Columns – Pour 3
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Shotcrete – Wires
Concrete pumps and Trucks
Noise due to Equipment
SBB (Lot 8) Concrete
Shotcrete -Retaining Wall
Shotcrete Pump
Noise due to Equipment
SBB (Lot 8) Concrete
Remove Rebound – Retaining Wall
Skid Steer
Noise due to Equipment
SBB (Lot 8) Concrete
Remove Scaffolding – Retaining Wall
N/A
N/A
SBB (Lot 8) Concrete
Fine Grade – SOG North
N/A
N/A
SBB (Lot 8)
Concrete
Install Vapor Barrier – SOG North
N/A
N/A
SBB (Lot 8)
Concrete
Edge Form / Bulkhead – SOG North
N/A
N/A
SBB (Lot 8) Concrete
Rebar – SOG North
N/A
N/A
SBB (Lot 8)
Concrete
Underslab Plumbing Rough-in – SOG South
N/A
N/A
SBB (Lot 8)
Concrete
Underslab Electrical Rough-in – SOG South
N/A
N/A
Week of July 31, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Foundations
Layout Foundations
N/A
N/A
BIO
Foundations
Excavate Foundations
Excavator
Noise due to Equipment
BIO
Foundations
Rebar Foundations
N/A
N/A
BIO
Foundations
QC/Inspection Foundations
N/A
N/A
BIO
Foundations
Pour Foundations
Concrete pumps and Trucks
Noise due to Equipment
SBB (Lot 8) Sitework
Install Chilled Water
Excavator
Noise due to Equipment
SBB (Lot 8) Concrete
Backfill - Retaining Wall
Dump Truck(s)
Noise due to Equipment
SBB (Lot 8) Concrete
Edge Form / Bulkhead – SOG North
N/A
N/A
SBB (Lot 8) Concrete
Rebar – SOG North
N/A
N/A
SBB (Lot 8) Concrete
Set Screeds – SOG North
N/A
N/A
SBB (Lot 8) Concrete
QC/ Inspection – SOG North
N/A
N/A
SBB (Lot 8) Concrete
Pour – SOG North
Concrete pumps and Trucks
Noise due to Equipment
SBB (Lot 8)
Concrete
Underslab Plumbing Rough-In – SOG South
N/A
N/A
SBB (Lot 8)
Concrete
Underslab Electrical Rough-In – SOG South
N/A
N/A
SBB (Lot 8) Concrete
Fine Grade – SOG South
skip loader
Noise due to Equipment
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Indefinitely
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
College Pl
College Pl
7/10 – 7/28
The College Pl loop is a one-way (single lane) road that branches off S Campus Dr. The Southern College Pl Road contains two traffic control operators helping direct traffic both to and from Parking Lot 3. The Northern College Pl Road has been closed.
-
950592 UCR SBB - Construction Alert #35
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Sitework
Relocate (E) Steam Line
Mini-Excavator and Skid Steer
Noise due to Equipment
SBB (Lot 8) Sitework
Install Sewer
Excavator
Noise due to Equipment
Partial Lane Closure of South Campus Drive
SBB (Lot 8) Sitework
Install Chilled Water
Excavator
Noise due to Equipment
SBB (Lot 8) Sitework
Close Two Side Forms – Shear Walls & Columns – Pour 2
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Pour – Shear Walls & Columns – Pour 2
Concrete Pumps and Trucks
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Walls – Shear Walls & Columns – Pour 2
Crane
Noise due to Equipment
SBB (Lot 8) Sitework
One Side Form Walls – Shear Walls & Columns – Pour 3
Crane
Noise due to Equipment
SBB (Lot 8)
Concrete
Electrical Rough-in – Column Pour 1
N/A
N/A
SBB (Lot 8) Concrete
Set Embeds – Column Pour 1
N/A
N/A
SBB (Lot 8) Concrete
QC/Inspection – Column Pour 1
N/A
N/A
SBB (Lot 8) Concrete
Form Columns – Columns – Column Pour 1
Crane
Noise due to Equipment
SBB (Lot 8) Sitework
Pour – Column Pour 1
Concrete Pumps and Trucks
Noise due to Equipment
SBB (Lot 8) Sitework
Set – Scaffolding – Retaining Wall North
N/A
N/A
SBB (Lot 8) Sitework
Shotcrete Wires – Retaining Wall
N/A
N/A
SBB (Lot 8) Sitework
Back Form – Retaining Wall
Excavator
Noise due to Equipment
SBB (Lot 8) Sitework
Waterproofing – Retaining Wall – at Mat Pour 2
N/A
N/A
SBB (Lot 8)
Concrete
Underslab Electrical Stub-up – SOG North
N/A
N/A
SBB (Lot 8)
Bio-Retention Planter
Excavate Bio-retention planter for steam lines
Excavator
Noise due to Equipment
Week of July 17, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Sitework
Relocate (E) Steam Line
Mini-Excavator and Skid Steer
Noise due to Equipment
BIO
Sitework
Test & Backfill Steam Line
Skid Steer
Noise due to Equipment
BIO
Sitework
Remove (E) Electrical Line
N/A
N/A
SBB (Lot 8) Sitework
Install Sewer
Excavator
Noise due to Equipment
Partial Lane Closure of South Campus Drive
SBB (Lot 8) Sitework
Install Chilled Water
Excavator
Noise due to Equipment
SBB (Lot 8) Sitework
Strip – Column Pour 1
Crane
Noise due to Equipment
SBB (Lot 8) Sitework
Waterblast – Column Pour 1
Concrete Pressure Washer
Noise due to Equipment
SBB (Lot 8) Sitework
Strip Walls – Shear Walls & Columns – Pour 2
Crane
Noise due to Equipment
SBB (Lot 8) Sitework
Rebar – Shear Walls & Columns – Pour 3
N/A
N/A
SBB (Lot 8) Sitework
Layout & Install MEP’s – Shear Walls & Columns – Pour 3
N/A
N/A
SBB (Lot 8) Sitework
Set Embeds – Shear Walls & Columns – Pour 3
N/A
N/A
SBB (Lot 8) Sitework
QC / Inspection – Shear Walls & Columns – Pour 3
N/A
N/A
SBB (Lot 8) Sitework
Close Two Side Forms – Shear Walls & Columns – Pour 3
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Shotcrete – Retaining Wall
Concrete Pumps and Trucks
Noise due to equipment
SBB (Lot 8) Concrete
Remove Rebound – Retaining Wall
Skid Steer
Noise due to Equipment
SBB (Lot 8) Concrete
Remove Scaffolding – Retaining Wall North
N/A
N/A
SBB (Lot 8) Concrete
Backfill – Retaining Wall
Trucks and Excavator
Noise due to Equipment
SBB (Lot 8) Sitework
MEP Layout & Block outs – Retaining Wall
N/A
N/A
SBB (Lot 8) Sitework
Rebar – Retaining Wall
N/A
N/A
SBB (Lot 8)
Sitework
Set Scaffolding – Retaining Wall South
N/A
N/A
SBB (Lot 8)
Concrete
Backfill Footings, Walls & Columns – SOG North
Excavator
Noise due to Equipment
SBB (Lot 8)
Bio-Retention Planter
Backfill Bio-Retention Planter for Steam Lines
Excavator
Noise due to Equipment
Week of July 24, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Sitework
Install Sewer
Excavator
Noise due to Equipment
Partial Lane Closure of South Campus Drive
SBB (Lot 8) Sitework
Install Chilled Water
Excavator
Noise due to Equipment
SBB (Lot 8) Concrete
Pour – Shear Walls & Columns – Pour 3
Concrete pumps and Trucks
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Walls – Shear Walls & Columns – Pour 3
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Shotcrete – Wires
Concrete pumps and Trucks
Noise due to Equipment
SBB (Lot 8) Concrete
Shotcrete -Retaining Wall
Shotcrete Pump
Noise due to Equipment
SBB (Lot 8) Concrete
Remove Rebound – Retaining Wall
Skid Steer
Noise due to Equipment
SBB (Lot 8) Concrete
Remove Scaffolding – Retaining Wall
N/A
N/A
SBB (Lot 8) Concrete
Fine Grade – SOG North
N/A
N/A
SBB (Lot 8)
Concrete
Install Vapor Barrier – SOG North
N/A
N/A
SBB (Lot 8)
Concrete
Edge Form / Bulkhead – SOG North
N/A
N/A
SBB (Lot 8) Concrete
Rebar – SOG North
N/A
N/A
SBB (Lot 8)
Concrete
Underslab Plumbing Rough-in – SOG South
N/A
N/A
SBB (Lot 8)
Concrete
Underslab Electrical Rough-in – SOG South
N/A
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #22
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Earthwork
Grade and Bench
Loader and Excavator
Noise due to equipment
Genomics
MEP Rough-in
N/A
N/A
Genomics
Site Wall
Skid steer / Mini Excavator
Noise due to equipment
SBB (Lot 8) Earthwork
Soil Nail Wall
Loader, Drill Rig, and Trucks
Noise due to equipment
Genomics
Grading for Flatwork
Skid steer / Mini Excavator
Noise due to equipment
Week of April 17, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Earthwork
Grade and Bench
Loader and Excavator
Noise due to equipment
Genomics
MEP Finishes
N/A
N/A
Genomics
Asphalt
Skid steer/ Mini Excavator
Noise due to equipment
SBB (Lot 8) Earthwork
Soil Nail Wall
Loader, Drill Rig, and Trucks
Noise due to equipment
Week of April 24, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Earthwork
Grade and Bench
Loader and Excavator
Noise due to equipment
Genomics
MEP Finishes
N/A
N/A
SBB (Lot 8) Earthwork
Soil Nail Wall
Loader, Drill Rig, and Trucks
Noise due to equipment
Genomics
Fencing
N/A
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
-
950592 UCR SBB - Construction Alert #34
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Sitework
Install Sewer
Excavator
Noise due to Equipment
Partial Lane Closure of South Campus Drive
SBB (Lot 8) Sitework
Install Chilled Water
Excavator
Noise due to Equipment
SBB (Lot 8) Concrete
Pour Mat Footing 2
Concrete Pumps and Trucks
Noise due to Equipment
SBB (Lot 8) Concrete
Pour – Shear Walls & Columns – Pour 1
Concrete Pumps and Trucks
Noise due to Equipment
SBB (Lot 8)
Concrete
Strip Walls – Shear Walls & Columns – Pour 1
N/A
N/A
SBB (Lot 8) Concrete
Rebar – Shear Walls & Columns – Pour 2
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Layout and Install MEP’s – Shear Walls & Columns – Pour 2
N/A
N/A
SBB (Lot 8) Concrete
Set Embeds – Shear Walls & Columns – Pour 2
N/A
N/A
SBB (Lot 8)
Concrete
QC Inspection Shear Walls & Columns – Pour 2
N/A
N/A
SBB (Lot 8)
Concrete
Close Two-Side Forms – Shear Walls & Columns – Pour 2
N/A
N/A
SBB (Lot 8)
Concrete
Set Rebar Column Cages – Column Pour 1
Crane
Noise due to Equipment
SBB (Lot 8)
Concrete
Electrical Rough-In – Column Pour 1
N/A
N/A
SBB (Lot 8)
Concrete
Form Columns – Column Pour 1
N/A
N/A
SBB (Lot 8)
Concrete
Waterproofing – Retaining Wall – at Mat Pour 2
Boom Lift
Noise due to Equipment
SBB (Lot 8)
Concrete
Back Form – Retaining Wall
N/A
N/A
SBB (Lot 8) Concrete
MEP Layouts & Blockouts – Retaining Wall
N/A
N/A
SBB (Lot 8) Bio-Retention Planter
Excavate Bio-retention planter for steam lines
Excavator
Noise due to Equipment
Week of July 10, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Sitework
Install Sewer
Excavator
Noise due to Equipment
Partial Lane Closure of South Campus Drive
SBB (Lot 8) Sitework
Install Chilled Water
Excavator
Noise due to Equipment
SBB (Lot 8) Concrete
Pour – Shear Walls & Columns – Pour 2
Concrete Pumps and Trucks
Noise due to equipment
SBB (Lot 8) Concrete
Strip Walls – Shear Walls & Columns – Pour 2
N/A
N/A
SBB (Lot 8) Concrete
Strip – Columns Pour 1
N/A
N/A
SBB (Lot 8) Concrete
Waterblast – Column Pour 1
Concrete Pressure Washer
Noise due to equipment
SBB (Lot 8) Concrete
Set Scaffolding – Retaining Wall
N/A
N/A
SBB (Lot 8) Concrete
Shotcrete Wires – Retaining Wall
N/A
N/A
SBB (Lot 8) Concrete
Backfill Footings, Walls & Columns – SOG North
N/A
N/A
SBB (Lot 8) Concrete
Install Storm Drain at Auditorium
Excavator
Noise due to Equipment
SBB (Lot 8) Concrete
Underslab Electrical Stub-up – SOG North
N/A
N/A
SBB (Lot 8) Concrete
Backfill Footing, Walls, & Columns – SOG South
Excavator
Noise due to Equipment
SBB (Lot 8) Bio-Retention Planter
Excavate Bio-retention planter for steam lines
Excavator
Noise due to Equipment
Week of July 17, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Sitework
Install Sewer
Excavator
Noise due to Equipment
Partial Lane Closure of South Campus Drive
SBB (Lot 8) Sitework
Install Chilled Water
Excavator
Noise due to Equipment
SBB (Lot 8) Concrete
Shotcrete – Retaining Wall
Concrete pumps and Trucks
Noise due to equipment
SBB (Lot 8) Concrete
Remove Rebound – Retaining Wall
N/A
N/A
SBB (Lot 8) Concrete
Remove Scaffold – Retaining Wall
N/A
N/A
SBB (Lot 8) Concrete
Backfill – Retaining Wall
Trucks
Noise due to equipment
SBB (Lot 8) Bio-Retention Planter
Excavate Bio-retention planter for steam lines
Excavator
Noise due to Equipment
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #33
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Sitework
Install Sewer
N/A
N/A
SBB (Lot 8) Sitework
Install Chilled Water
N/A
N/A
SBB (Lot 8) Concrete
QC Inspection Mat Footing 2
N/A
N/A
SBB (Lot 8) Concrete
Strip and Waterblast Mat Footing 2
N/A
N/A
SBB (Lot 8)
Concrete
Wall & Column Templates and Dowels – Spread Footings
N/A
N/A
SBB (Lot 8) Concrete
QC Inspection at Spread Footings
N/A
N/A
SBB (Lot 8) Concrete
Pour Spread Continuous Footings
Concrete Pumps and Trucks
Noise due to equipment
SBB (Lot 8) Concrete
Strip Wall and Column Templates – Spread Footings
N/A
N/A
SBB (Lot 8)
Concrete
Waterblast Dowels – Spread Footings
N/A
N/A
SBB (Lot 8)
Concrete
Rebar Shear Walls and Columns – For Pour 1
N/A
N/A
SBB (Lot 8)
Concrete
Electrical Rough-in – Shear Walls and Columns – For Pour 1
N/A
N/A
SBB (Lot 8)
Concrete
Set Embeds – Shear Walls and Columns – For Pour 1
N/A
N/A
SBB (Lot 8)
Concrete
QC Inspection Shear Walls and Columns – For Pour 1
N/A
N/A
SBB (Lot 8)
Concrete
Close up Wall Forms – Shear Walls and Columns – For Pour 1
N/A
N/A
SBB (Lot 8)
Concrete
Layout Walls – Shear Walls and Columns – For Pour 2
N/A
N/A
SBB (Lot 8) Concrete
Waterproofing – Retaining Wall at Mat Pour 1
N/A
N/A
Week of July 3, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Sitework
Install Sewer
N/A
N/A
SBB (Lot 8) Sitework
Install Chilled Water
N/A
N/A
SBB (Lot 8) Concrete
Pour Mat Footing 2
Concrete Pumps and Trucks
Noise due to equipment
SBB (Lot 8) Concrete
Pour – Shear Walls & Columns – Pour 1
Concrete Pumps and Trucks
Noise due to equipment
SBB (Lot 8) Concrete
Strip Walls – Shear Walls & Columns – Pour 1
N/A
N/A
SBB (Lot 8) Concrete
Rebar – Shear Walls & Columns – Pour 2
N/A
N/A
SBB (Lot 8) Concrete
Layout and Install MEP’s – Shear Walls & Columns – Pour 2
N/A
N/A
SBB (Lot 8) Concrete
Set Embeds – Shear Walls & Columns – Pour 2
N/A
N/A
SBB (Lot 8) Concrete
QC Inspection Shear Walls & Columns – Pour 2
Concrete Pumps and Trucks
Noise due to equipment
SBB (Lot 8) Concrete
Close Two-Side Forms – Shear Walls & Columns – Pour 2
N/A
N/A
SBB (Lot 8) Concrete
Set Rebar Column Cages – Column Pour 1
N/A
N/A
SBB (Lot 8) Concrete
Electrical Rough-in – Column Pour 1
N/A
N/A
SBB (Lot 8) Concrete
Form Columns – Column Pour 1
N/A
N/A
SBB (Lot 8) Concrete
Waterproofing – Retaining Wall – at Mat Pour 2
N/A
N/A
SBB (Lot 8) Concrete
Back Form – Retaining Wall
N/A
N/A
SBB (Lot 8) Concrete
MEP Layouts & Blockouts – Retaining Wall
N/A
N/A
Week of July 10, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Sitework
Install Sewer
N/A
N/A
SBB (Lot 8) Sitework
Install Chilled Water
N/A
N/A
SBB (Lot 8) Concrete
Pour – Shear Walls & Columns – Pour 2
Concrete Pumps and Trucks
Noise due to equipment
SBB (Lot 8) Concrete
Strip Walls - Shear Walls & Columns – Pour 2
N/A
N/A
SBB (Lot 8) Concrete
Strip – Column Pour 1
N/A
N/A
SBB (Lot 8) Concrete
Waterblast – Column Pour 1
N/A
N/A
SBB (Lot 8) Concrete
Set Scaffolding – Retaining Wall
N/A
N/A
SBB (Lot 8) Concrete
Shotcrete Wires – Retaining Wall
N/A
N/A
SBB (Lot 8) Concrete
Backfill Footing, Walls & Columns – SOG North
N/A
N/A
SBB (Lot 8) Concrete
Install Storm Drain at Auditorium
N/A
N/A
SBB (Lot 8) Concrete
Underslab Electrical Stub-up – SOG North
N/A
N/A
SBB (Lot 8) Concrete
Backfill Footing, Walls, & Columns – SOG South
N/A
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #32
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Genomics
Fire Alarm Testing (MEP testing and startup)
N/A
N/A
SBB (Lot 8) Sitework
Install Sewer
N/A
N/A
SBB (Lot 8) Sitework
Install Chilled Water
N/A
N/A
SBB (Lot 8) Concrete
Qc Inspection Mat Footing 1
N/A
N/A
SBB (Lot 8) Concrete
Pour Mat Footing 1
Concrete Pumps and Trucks
Noise due to equipment
SBB (Lot 8) Concrete
Strip and Waterblast Mat Footing 1
N/A
N/A
SBB (Lot 8) Concrete
Install Storm Drain at Auditorium
N/A
N/A
SBB (Lot 8) Concrete
Rebar Mat Footing 2
N/A
N/A
SBB (Lot 8) Concrete
Wall & Column Templates and Dowels Mat Footing 2
N/A
N/A
SBB (Lot 8) Concrete
Excavate Spread Footings
N/A
N/A
Week of June 26, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Sitework
Install Sewer
N/A
N/A
SBB (Lot 8) Sitework
Install Chilled Water
N/A
N/A
SBB (Lot 8) Concrete
QC inspection at Mat Footing 2
N/A
N/A
SBB (Lot 8) Concrete
Pour Mat Footing 2
Concrete Pumps and Trucks
Noise due to equipment
SBB (Lot 8) Concrete
Strip and Waterblast Mat Footing 2
N/A
N/A
SBB (Lot 8) Concrete
Wall & Column Templates and Dowels - Spread Footings
N/A
N/A
SBB (Lot 8) Concrete
QC inspection at Spread Footings
N/A
N/A
SBB (Lot 8) Concrete
Pour Spread Continuous Footings
Concrete Pumps and Trucks
Noise due to equipment
SBB (Lot 8) Concrete
Strip Wall and Column Templates – Spread Footings
N/A
N/A
SBB (Lot 8) Concrete
Waterblast Dowels – Spread Footings
N/A
N/A
SBB (Lot 8) Concrete
Rebar Shear Walls and Columns - For Pour 1
N/A
N/A
SBB (Lot 8) Concrete
Electrical Rough-in - Shear Walls and Columns - For Pour 1
N/A
N/A
SBB (Lot 8) Concrete
Set Embeds - Shear Walls and Columns – For Pour 1
N/A
N/A
SBB (Lot 8) Concrete
QC inspection Shear Walls and Columns – For Pour 1
N/A
N/A
SBB (Lot 8) Concrete
Close Up Wall Forms – Shear Walls and Columns – For Pour 1
N/A
N/A
SBB (Lot 8) Concrete
Layout Walls – Shear Walls and Columns – For Pour 2
N/A
N/A
SBB (Lot 8) Shotcrete Retaining Wall
Waterproofing – retaining Wall – at Mat Pour 1
N/A
N/A
Week of July 3, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Sitework
Install Sewer
N/A
N/A
SBB (Lot 8) Sitework
Install Chilled Water
N/A
N/A
SBB (Lot 8) Concrete
Pour - Shear Walls & Columns – Pour 1
Concrete Pumps and Trucks
Noise due to equipment
SBB (Lot 8) Concrete
Strip Walls - Shear Walls & Columns – Pour 1
N/A
N/A
SBB (Lot 8) Concrete
Rebar - Shear Walls & Columns – Pour 2
N/A
N/A
SBB (Lot 8) Concrete
Layout and install MEPs - Shear Walls & Columns – Pour 2
N/A
N/A
SBB (Lot 8) Concrete
Set Embeds - Shear Walls & Columns – Pour 2
N/A
N/A
SBB (Lot 8) Concrete
QC Inspection Shear Walls & Columns – Pour 2
N/A
N/A
SBB (Lot 8) Concrete
Close Two Side Forms - Shear Walls & Columns – Pour 2
N/A
N/A
SBB (Lot 8) Concrete
Set Rebar Column Cages – Column Pour 1
N/A
N/A
SBB (Lot 8) Concrete
Electrical Rough-in – Column Pour 1
N/A
N/A
SBB (Lot 8) Concrete
QC Inspection – Column Pour 1
N/A
N/A
SBB (Lot 8) Concrete
Form Columns - Column Pour 1
N/A
N/A
SBB (Lot 8) Shotcrete Retaining Wall
Waterproofing – retaining Wall – at Mat Pour 2
N/A
N/A
SBB (Lot 8) Shotcrete Retaining Wall
Back Form – Retaining wall
N/A
N/A
SBB (Lot 8) Concrete
MEP Layouts & Blockouts – Retaining Wall
N/A
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #31
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Genomics
Fire Alarm Testing (MEP testing and startup)
N/A
N/A
SBB (Lot 8) Sitework
Install Sewer
N/A
N/A
SBB (Lot 8) Concrete
Walls and Columns dowels template
N/A
N/A
SBB (Lot 8) Concrete
Rebar Top Mat and Electrical Rough in for Mat Footing 1
N/A
N/A
SBB (Lot 8) Concrete
Excavate Footing for Mat Footing 2
Loader, Excavator, and trucks
Noise due to equipment
SBB (Lot 8) Concrete
Excavate Spread Footings
Loader, Excavator, and trucks
Noise due to equipment
SBB (Lot 8) Concrete
QC & Inspection Mat Footing 1
N/A
N/A
SBB (Lot 8) Concrete
Waterproofing Mat Footing 2
N/A
N/A
Week of June 19, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Sitework
Install Sewer
N/A
N/A
SBB (Lot 8) Sitework
Install Chilled Water
N/A
N/A
SBB (Lot 8) Concrete
Install Storm Drain At Auditorium
N/A
N/A
SBB (Lot 8) Concrete
Wall & Column Templates/Dowels at Mat Footing 2
N/A
N/A
SBB (Lot 8) Concrete
Pour Mat – Mat Footing 2
Concrete pumps
Noise due to equipment
SBB (Lot 8) Concrete
Strip & Waterblast – Mat Footing 2
Concrete pumps
Noise due to equipment
SBB (Lot 8) Concrete
QC & Inspection Mat Footing 2
N/A
N/A
SBB (Lot 8) Concrete
Waterproofing Retaining Wall Mat Pour 1
N/A
N/A
SBB (Lot 8) Concrete
Layout Shear Walls & Columns
N/A
N/A
Week of June 26, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Sitework
Install Sewer
N/A
N/A
SBB (Lot 8) Sitework
Install Chilled Water
N/A
N/A
SBB (Lot 8) Concrete
Mat Footing Pour 2
Concrete pump
Noise due to equipment
SBB (Lot 8) Concrete
Rebar - Shear Walls & Columns
N/A
N/A
SBB (Lot 8) Concrete
Electrical Rough-in - Shear Walls & Columns
N/A
N/A
SBB (Lot 8) Concrete
Set Embers
N/A
N/A
SBB (Lot 8) Concrete
QC Inspection - Shear Walls & Columns
N/A
N/A
SBB (Lot 8) Concrete
Close Up Wall Forms – Shear Walls & Columns
N/A
N/A
SBB (Lot 8) Concrete
Set Rebar Column Cages
N/A
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #30
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Genomics
MEP Finishes
N/A
N/A
SBB (Lot 8) Sitework
Install Sewer
N/A
N/A
SBB (Lot 8) Concrete
Layout Mat Footing 2
N/A
N/A
SBB (Lot 8) Concrete
Rebar Bottom / Mid Mat – Mat Footing 1
N/A
N/A
SBB (Lot 8) Concrete
Excavate Footing for Mat Footing 1
Loader, Excavator, and trucks
Noise due to equipment
SBB (Lot 8) Concrete
Excavate Footing for Mat Footing 2
Loader, Excavator, and trucks
Noise due to equipment
SBB (Lot 8) Concrete
Waterproofing Mat Footing 1
N/A
N/A
Week of June 12, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Genomics
Fire Alarm Testing (MEP testing and startup)
N/A
N/A
SBB (Lot 8) Sitework
Install Sewer
N/A
N/A
SBB (Lot 8) Concrete
Walls and Columns dowels template
N/A
N/A
SBB (Lot 8) Concrete
Rebar Top Mat and Electrical Rough in for Mat Footing 1
N/A
N/A
SBB (Lot 8) Concrete
Excavate Footing for Mat Footing 2
Loader, Excavator, and trucks
Noise due to equipment
SBB (Lot 8) Concrete
Excavate Spread Footings
Loader, Excavator, and trucks
Noise due to equipment
SBB (Lot 8) Concrete
QC & Inspection Mat Footing 1
N/A
N/A
SBB (Lot 8) Concrete
Waterproofing Mat Footing 2
N/A
N/A
Week of June 19, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Sitework
Install Sewer
N/A
N/A
SBB (Lot 8) Sitework
Install Chilled Water
N/A
N/A
SBB (Lot 8) Concrete
Install Storm Drain At Auditorium
N/A
N/A
SBB (Lot 8) Concrete
Wall & Column Templates/Dowels at Mat Footing 2
N/A
N/A
SBB (Lot 8) Concrete
Pour Mat – Mat Footing 2
Concrete pumps
Noise due to equipment
SBB (Lot 8) Concrete
Strip & Waterblast – Mat Footing 2
Concrete pumps
Noise due to equipment
SBB (Lot 8) Concrete
QC & Inspection Mat Footing 2
N/A
N/A
SBB (Lot 8) Concrete
Waterproofing Retaining Wall Mat Pour 1
N/A
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #29
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Genomics
MEP Finishes
N/A
N/A
SBB (Lot 8) Earthwork
Grade and Bench
Loader and Excavator
Noise due to equipment
SBB (Lot 8) Earthwork
Soil Nail Wall
Loader, Drill Rig, and Trucks
Noise due to equipment
SBB (Lot 8) Concrete
Layout Mat footing 1
N/A
N/A
SBB (Lot 8) Concrete
Excavate Footing for Mat Footing 1
Loader, Excavator, and trucks
Noise due to equipment
Week of June 5, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Genomics
MEP Finishes
N/A
N/A
SBB (Lot 8) Sitework
Install Sewer
N/A
N/A
SBB (Lot 8) Concrete
Layout Mat Footing 2
N/A
N/A
SBB (Lot 8) Concrete
Rebar Bottom / Mid Mat – Mat Footing 1
N/A
N/A
SBB (Lot 8) Concrete
Excavate Footing for Mat Footing 1
Loader, Excavator, and trucks
Noise due to equipment
SBB (Lot 8) Concrete
Excavate Footing for Mat Footing 2
Loader, Excavator, and trucks
Noise due to equipment
SBB (Lot 8) Concrete
Waterproofing Mat Footing 1
N/A
N/A
Week of June 12, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Genomics
Fire Alarm Testing (MEP testing and startup)
N/A
N/A
SBB (Lot 8) Sitework
Install Sewer
N/A
N/A
SBB (Lot 8) Concrete
Walls and Columns dowels template
N/A
N/A
SBB (Lot 8) Concrete
Rebar Top Mat and Electrical Rough in for Mat Footing 1
N/A
N/A
SBB (Lot 8) Concrete
Excavate Footing for Mat Footing 2
Loader, Excavator, and trucks
Noise due to equipment
SBB (Lot 8) Concrete
Excavate Spread Footings
Loader, Excavator, and trucks
Noise due to equipment
SBB (Lot 8) Concrete
QC & Inspection Mat Footing 1
N/A
N/A
SBB (Lot 8) Concrete
Waterproofing Mat Footing 2
N/A
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #28
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Genomics
MEP Finishes
N/A
N/A
SBB (Lot 8) Earthwork
Grade and Bench
Loader and Excavator
Noise due to equipment
SBB (Lot 8) Earthwork
Soil Nail Wall
Loader, Drill Rig, and Trucks
Noise due to equipment
Week of May 29, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Genomics
MEP Finishes
N/A
N/A
SBB (Lot 8) Earthwork
Grade and Bench
Loader and Excavator
Noise due to equipment
SBB (Lot 8) Earthwork
Soil Nail Wall
Loader, Drill Rig, and Trucks
Noise due to equipment
SBB (Lot 8) Concrete
Layout Mat footing 1
N/A
N/A
SBB (Lot 8) Concrete
Excavate Footing for Mat Footing 1
Loader, Excavator, and trucks
Noise due to equipment
Week of June 5, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Genomics
Fire Alarm Testing (MEP testing and startup)
N/A
N/A
SBB (Lot 8) Concrete
Layout Mat Footing 2
N/A
N/A
SBB (Lot 8) Concrete
Excavate Footing for Mat Footing 1
Loader, Excavator, and trucks
Noise due to equipment
SBB (Lot 8) Concrete
Excavate Footing for Mat Footing 2
Loader, Excavator, and trucks
Noise due to equipment
SBB (Lot 8) Concrete
Waterproofing Mat Footing 1
N/A
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #27
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Earthwork
Grade and Bench
Loader and Excavator
Noise due to equipment
SBB (Lot 8) Earthwork
Soil Nail Wall
Loader, Drill Rig, and Trucks
Noise due to equipment
Genomics
MEP Finishes
N/A
N/A
Week of May 22, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Earthwork
Grade and Bench
Loader and Excavator
Noise due to equipment
Genomics
MEP Finishes
N/A
N/A
SBB (Lot 8) Earthwork
Soil Nail Wall
Loader, Drill Rig, and Trucks
Noise due to equipment
Week of May 29, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Earthwork
Grade and Bench
Loader and Excavator
Noise due to equipment
SBB (Lot 8) Earthwork
Soil Nail Wall
Loader, Drill Rig, and Trucks
Noise due to equipment
Genomics
Fire Alarm Testing (MEP testing and startup)
N/A
N/A
SBB (Lot 8) Foundations
Layout Mat Foundation 1
N/A
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
-
950592 UCR SBB - Construction Alert #26
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Earthwork
Grade and Bench
Loader and Excavator
Noise due to equipment
SBB (Lot 8) Earthwork
Soil Nail Wall
Loader, Drill Rig, and Trucks
Noise due to equipment
Genomics
Finish DG Install
N/A
N/A
Week of May 15, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Earthwork
Grade and Bench
Loader and Excavator
Noise due to equipment
Genomics
MEP Finishes
N/A
N/A
SBB (Lot 8) Earthwork
Soil Nail Wall
Loader, Drill Rig, and Trucks
Noise due to equipment
Week of May 22, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Earthwork
Grade and Bench
Loader and Excavator
Noise due to equipment
SBB (Lot 8) Earthwork
Soil Nail Wall
Loader, Drill Rig, and Trucks
Noise due to equipment
Genomics
Fire Alarm Testing (MEP testing and startup)
N/A
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
-
950592 UCR SBB - Construction Alert #25
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Earthwork
Grade and Bench
Loader and Excavator
Noise due to equipment
SBB (Lot 8) Earthwork
Soil Nail Wall
Loader, Drill Rig, and Trucks
Noise due to equipment
Genomics
Fencing
N/A
N/A
Genomics
Striping & Signage Post Install
N/A
N/A
Week of May 8, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Earthwork
Grade and Bench
Loader and Excavator
Noise due to equipment
Genomics
MEP Finishes
N/A
N/A
SBB (Lot 8) Earthwork
Soil Nail Wall
Loader, Drill Rig, and Trucks
Noise due to equipment
Week of May 15, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Earthwork
Grade and Bench
Loader and Excavator
Noise due to equipment
SBB (Lot 8) Earthwork
Soil Nail Wall
Loader, Drill Rig, and Trucks
Noise due to equipment
Genomics
Fire Alarm Testing (MEP testing and startup)
N/A
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
-
950592 UCR SBB - Construction Alert #24
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Earthwork
Grade and Bench
Loader and Excavator
Noise due to equipment
Genomics
MEP Finishes
N/A
N/A
SBB (Lot 8) Earthwork
Soil Nail Wall
Loader, Drill Rig, and Trucks
Noise due to equipment
Genomics
Fencing
N/A
N/A
Week of May 1, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Earthwork
Grade and Bench
Loader and Excavator
Noise due to equipment
Genomics
MEP Finishes
N/A
N/A
Genomics
Asphalt
Skid steer/ Mini Excavator
Noise due to equipment
SBB (Lot 8) Earthwork
Soil Nail Wall
Loader, Drill Rig, and Trucks
Noise due to equipment
Week of May 8, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Earthwork
Grade and Bench
Loader and Excavator
Noise due to equipment
SBB (Lot 8) Earthwork
Soil Nail Wall
Loader, Drill Rig, and Trucks
Noise due to equipment
Genomics
Fire Alarm Testing (MEP testing and startup)
N/A
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
-
950592 UCR SBB - Construction Alert #23
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Earthwork
Grade and Bench
Loader and Excavator
Noise due to equipment
Genomics
MEP Finishes
N/A
N/A
SBB (Lot 8) Earthwork
Soil Nail Wall
Loader, Drill Rig, and Trucks
Noise due to equipment
Genomics
Grading/Pouring Flatwork
Skid steer / Mini Excavator
Noise due to equipment
Week of April 24, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Earthwork
Grade and Bench
Loader and Excavator
Noise due to equipment
Genomics
MEP Finishes
N/A
N/A
Genomics
Asphalt
Skid steer/ Mini Excavator
Noise due to equipment
SBB (Lot 8) Earthwork
Soil Nail Wall
Loader, Drill Rig, and Trucks
Noise due to equipment
Genomics
Fencing
N/A
N/A
Week of May 1, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Earthwork
Grade and Bench
Loader and Excavator
Noise due to equipment
SBB (Lot 8) Earthwork
Soil Nail Wall
Loader, Drill Rig, and Trucks
Noise due to equipment
Genomics
Fire Alarm Testing (MEP testing and startup)
N/A
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
-
950592 - UCR SBB - Construction Alert #8 Week 01/2/2023
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Lot 43
Trailer Interior/Exterior Build-out
Small hand tools
Noise due to hand tools
Genomics
Grading
N/A
N/A
Bio-Control
Relocate Existing Lines (Water, Telecom, and electrical)
N/A
N/A
Week of January 09, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Genomics
Footing excavation
Back Hoe, mini-ex, dump truck
Noise due to equipment
Bio-Control
Relocate Existing Lines (Water, Telecom, and electrical)
N/A
N/A
Week of January 16, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Genomics
Rebar Install
N/A
N/A
SBB (Lot 8)
Site Utilities Excavation
Mini-Ex and Asphalt Removal
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Indefinitely
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
-
950592 UCR SBB - Construction Alert #21
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Earthwork
Soil Nail Wall Mob
Loader, Drill Rig, and Trucks
Noise due to equipment
Genomics
Install Metal Building (PEMB)
N/A
N/A
SBB (Lot 8) Earthwork
Clear & Grub for SBB and Export Dirt
Loader and Excavator
Noise due to equipment
Genomics
Site Wall
Skid Steer/Mini Excavator
Noise due to equipment
Genomics
MEP Rough-in
N/A
N/A
Week of April 10, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Earthwork
Clear & Grub for SBB and Misc. Export
Loader and Excavator
Noise due to equipment
Genomics
MEP Rough-in
N/A
N/A
Genomics
Site Wall
Skid steer / Mini Excavator
Noise due to equipment
SBB (Lot 8) Earthwork
Soil Nail Wall
Loader, Drill Rig, and Trucks
Noise due to equipment
Week of April 17, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Site Utilities
Backhoe, excavator, trucks
Noise due to equipment
SBB (Lot 8) Earthwork
Grade and Bench
Loader and Excavator
Noise due to equipment
Genomics
MEP Finishes
N/A
N/A
Genomics
Site Wall
Skid steer/ Mini Excavator
Noise due to equipment
SBB (Lot 8) Earthwork
Soil Nail Wall
Loader, Drill Rig, and Trucks
Noise due to equipment
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
-
950592 UCR SBB - Construction Alert #20
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Earthwork
Soil Nail Wall
Loader, Drill Rig, and Trucks
Noise due to equipment
Genomics
Install Metal Building (PEMB)
N/A
N/A
SBB (Lot 8) Earthwork
Clear & Grub for SBB
Loader and Excavator
Noise due to equipment
Genomics
Site Wall
Skid Steer
Noise due to equipment
Week of April 3, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Site Utilities
Backhoe, excavator, trucks
Noise due to equipment
SBB (Lot 8) Earthwork
Clear & Grub for SBB
Loader and Excavator
Noise due to equipment
Genomics
MEP Rough-in
N/A
N/A
Genomics
Site Wall
Skid steer
Noise due to equipment
SBB (Lot 8) Earthwork
Soil Nail Wall
Loader, Drill Rig, and Trucks
Noise due to equipment
Week of April 10, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Site Utilities
Backhoe, excavator, trucks
Noise due to equipment
SBB (Lot 8) Earthwork
Grade and Bench
Loader and Excavator
Noise due to equipment
Genomics
MEP Finishes
N/A
N/A
Genomics
Site Wall
Skid steer
Noise due to equipment
SBB (Lot 8) Earthwork
Soil Nail Wall
Loader, Drill Rig, and Trucks
Noise due to equipment
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
-
950592 UCR SBB - Construction Alert #19
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Locate and Cap Existing Utilities
N/A
N/A
Genomics
Install Metal Building (PEMB)
N/A
N/A
SBB (Site)
Street Paving
Trucks and Rollers
Noise due to equipment
SBB (Lot 8) Earthwork
Clear & Grub for SBB
Loader and Excavator
Noise due to equipment
Week of March 27, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Earthwork
Soil Nail Wall
Loader, Drill Rig, and Trucks
Noise due to equipment
Genomics
Install Metal Building (PEMB)
N/A
N/A
SBB (Lot 8) Earthwork
Clear & Grub for SBB
Loader and Excavator
Noise due to equipment
Genomics
Site Wall
Skid Steer
Noise due to equipment
Week of April 3, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Site Utilities
Backhoe, excavator, trucks
Noise due to equipment
SBB (Lot 8) Earthwork
Clear & Grub for SBB
Loader and Excavator
Noise due to equipment
Genomics
MEP Rough-in
N/A
N/A
Genomics
Site Wall
Skid steer
Noise due to equipment
SBB (Lot 8) Earthwork
Soil Nail Wall
Loader, Drill Rig, and Trucks
Noise due to equipment
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
-
950592 UCR SBB - Construction Alert #18 - Week 03/13/2023
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Locate and Cap Existing Utilities
N/A
N/A
SBB (Lot 8)
Site Utilities
Backhoe, excavator, trucks
Noise due to equipment
Genomics
Install Metal Building (PEMB)
N/A
N/A
SBB (site electrical)
Concrete backfill of medium voltage trench
Concrete pump and trucks
Noise due to equipment
SBB (Lot 8)
Electrical Shutdown
N/A
N/A
Week of March 20, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Locate and Cap Existing Utilities
N/A
N/A
SBB (Lot 8)
Site Utilities
Backhoe, excavator, trucks
Noise due to equipment
Genomics
Install Metal Building (PEMB)
N/A
N/A
SBB (Lot 8) Earthwork
Clear & Grub for Soil Nail Wall
Loader and Excavator
Noise due to equipment
Genomics
Site Wall
Skid Steer
Noise due to equipment
Week of March 27, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Site Utilities
Backhoe, excavator, trucks
Noise due to equipment
Genomics
Install Metal Building (PEMB)
N/A
N/A
SBB (Lot 8) Earthwork
Clear & Grub for Soil Nail Wall
Loader and Excavator
Noise due to equipment
Genomics
MEP Rough-in
N/A
N/A
Genomics
Site Wall
Skid steer
Noise due to equipment
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
-
UCR SBB - Construction Alert #17 - Week 03/06/2023
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Locate and Cap Existing Utilities
N/A
N/A
SBB (Lot 8)
Site Utilities
Backhoe, excavator, trucks
Noise due to equipment
SBB (site electrical)
Pulling Medium Voltage cable
N/A
N/A
SBB (site electrical)
Setting new power pole
N/A
N/A
Genomics
Install Metal Building (PEMB)
N/A
N/A
SBB (site electrical)
Concrete backfill of medium voltage trench
Concrete pump and trucks
Noise due to equipment
SBB (Lot 8)
Domestic Water Shutdown
N/A
N/A
Week of March 13, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Locate and Cap Existing Utilities
N/A
N/A
SBB (Lot 8)
Site Utilities
Backhoe, excavator, trucks
Noise due to equipment
Genomics
Install Metal Building (PEMB)
N/A
N/A
SBB (Lot 8)
Electrical Shutdown
N/A
N/A
Week of March 20, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Locate and Cap Existing Utilities
N/A
N/A
SBB (Lot 8)
Site Utilities
Backhoe, excavator, trucks
Noise due to equipment
Genomics
Install Metal Building (PEMB)
N/A
N/A
SBB (Lot 8) Earthwork
Clear & Grub for Soil Nail Wall
Loader and Excavator
Noise due to equipment
Genomics
MEP Rough-in
N/A
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
-
950592 - UCR SBB - Construction Alert #16 - Week 02/27/2023
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Locate and Cap Existing Utilities
N/A
N/A
SBB (Lot 8)
Site Utilities
Backhoe, excavator, trucks
Noise due to equipment
Genomics
Metal Building Arrives (PEMB)
N/A
N/A
SBB (site electrical)
Pulling Medium Voltage cable
N/A
N/A
SBB (site electrical)
Installing conduit
N/A
N/A
Genomics
Form and reinforce SOG
N/A
N/A
Genomics
Concrete Pour
Concrete Pump
Noise due to equipment
Week of March 6, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Locate and Cap Existing Utilities
N/A
N/A
SBB (Lot 8)
Site Utilities
Backhoe, excavator, trucks
Noise due to equipment
SBB (site electrical)
Pulling Medium Voltage cable
N/A
N/A
SBB (site electrical)
Setting new power pole
N/A
N/A
Genomics
Install Metal Building (PEMB)
N/A
N/A
SBB (Lot 8)
Domestic Water Shutdown
N/A
N/A
Week of March 13, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Locate and Cap Existing Utilities
N/A
N/A
SBB (Lot 8)
Site Utilities
Backhoe, excavator, trucks
Noise due to equipment
Genomics
Install Metal Building (PEMB)
N/A
N/A
SBB (site electrical)
Pulling Medium Voltage cable
N/A
N/A
SBB (Lot 8) Earthwork
Clear & Grub for Soil Nail Wall
Loader and Excavator
Noise due to equipment
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
-
950592 - UCR SBB - Construction Alert #15 - Week 02/20/2023
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Locate and Cap Existing Utilities
N/A
N/A
SBB (Lot 8)
Site Utilities
Backhoe, excavator, trucks
Noise due to equipment
Genomics
Metal Building Arrives (PEMB)
N/A
N/A
SBB (site electrical)
Pulling Medium Voltage cable
N/A
N/A
Genomics
Back fill
Bobcat or skid-steer
Noise due to equipment
SBB (site electrical)
Installing conduit
N/A
N/A
Genomics
Form and reinforce SOG
N/A
N/A
Week of February 27, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Locate and Cap Existing Utilities
N/A
N/A
SBB (Lot 8)
Site Utilities
Backhoe, excavator, trucks
Noise due to equipment
SBB (site electrical)
Pulling Medium Voltage cable
N/A
N/A
SBB (site electrical)
Setting new power pole
N/A
N/A
SBB Earthwork
Clear & Grub for Soil Nail Wall
Loader and Excavator
Noise due to equipment
Genomics
Concrete Pour
Concrete Pump
Noise due to equipment
Week of March 6, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Locate and Cap Existing Utilities
N/A
N/A
SBB (Lot 8)
Site Utilities
Backhoe, excavator, trucks
Noise due to equipment
Genomics
Install Metal Building (PEMB)
N/A
N/A
SBB (site electrical)
Pulling Medium Voltage cable
N/A
N/A
SBB Earthwork
Clear & Grub for Soil Nail Wall
Loader and Excavator
Noise due to equipment
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
-
950592 - UCR SBB - Construction Alert #14- Week 02/13/2023
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Locate and Cap Existing Utilities
N/A
N/A
SBB (Lot 8)
Domestic Water Shutdown Feb. 15th
N/A
Shutdown water to the greenhouses
SBB (Lot 8)
Campus Drive Lane Closure
N/A
Single Lane Traffic
SBB (Lot 8)
Site Utilities
Backhoe, excavator, trucks
Noise due to equipment
SBB (Lot 8)
Electrical Trenching
N/A
Noise due to equipment (College Place)
Genomics
Under-slab plumbing and electrical
N/A
N/A
SBB (Lot 8)
College Place Closure
N/A
College Place Closure
Genomics
Anchor Bolt Installation
N/A
N/A
Genomics
Concrete Pour
Concrete Pump
Noise due to equipment
Genomics
Back fill
Bobcat or skid-steer
Noise due to equipment
SBB (site electrical)
Installing conduit
N/A
N/A
Genomics
Form and reinforce SOG
N/A
N/A
Week of February 20, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Locate and Cap Existing Utilities
N/A
N/A
SBB (Lot 8)
Site Utilities
Backhoe, excavator, trucks
Noise due to equipment
Genomics
Install Metal Building (PEMB)
N/A
N/A
SBB (site electrical)
Pulling Medium Voltage cable
N/A
N/A
SBB (site electrical)
Setting new power pole
N/A
N/A
Genomics
Back fill
Bobcat or skid-steer
Noise due to equipment
Week of February 27, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Locate and Cap Existing Utilities
N/A
N/A
SBB (Lot 8)
Site Utilities
Backhoe, excavator, trucks
Noise due to equipment
Genomics
Install Metal Building (PEMB)
N/A
N/A
SBB (site electrical)
Pulling Medium Voltage cable
N/A
N/A
SBB (site electrical)
Setting new power pole
N/A
N/A
SBB Earthwork
Clear & Grub for Soil Nail Wall
Loader and Excavator
Noise due to equipment
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
-
950592 - UCR SBB - Construction Alert #13- Week 02/06/2023
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Locate and Cap Existing Utilities
N/A
N/A
SBB (Lot 8)
Campus Drive Lane Closure
N/A
Single Lane Traffic
SBB (Lot 8)
Site Utilities
Back hoe, excavator, trucks
Noise due to equipment
SBB (Lot 8)
Electrical Trenching
N/A
Noise due to equipment (College Place)
SBB (Lot 8)
College Place Closure
N/A
College Place Closure
SBB (Lot 8)
Gas Shutdown Feb. 10th
N/A
Shutdown gas to the greenhouses
Genomics
Waterproofing
N/A
N/A
Existing Sheds
Demo Existing Sheds
Excavator
Noise due to equipment
Week of February 13, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Locate and Cap Existing Utilities
N/A
N/A
SBB (Lot 8)
Domestic Water Shutdown Feb. 15th
N/A
Shutdown water to the greenhouses
SBB (Lot 8)
Campus Drive Lane Closure
N/A
Single Lane Traffic
SBB (Lot 8)
Site Utilities
Back hoe, excavator, trucks
Noise due to equipment
SBB (Lot 8)
Electrical Trenching
N/A
Noise due to equipment (College Place)
Genomics
Underslab plumbing and electrical
N/A
N/A
SBB (Lot 8)
College Place Closure
N/A
College Place Closure
Genomics
Anchor Bolt Installation
N/A
N/A
Genomics
Concrete Pour
Concrete Pump
Noise due to equipment
Genomics
Back fill
Bobcat or skid-steer
Noise due to equipment
SBB (site electrical)
Installing conduit
N/A
N/A
Genomics
Form and reinforce SOG
N/A
N/A
Week of February 20, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Locate and Cap Existing Utilities
N/A
N/A
SBB (Lot 8)
Site Utilities
Back hoe, excavator, trucks
Noise due to equipment
Genomics
Install Metal Building
N/A
N/A
SBB (site electrical)
Pulling Medium Voltage cable
N/A
N/A
SBB (site electrical)
Setting new power pole
N/A
N/A
Genomics
Back fill
Bobcat or skid-steer
Noise due to equipment
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
-
950592 - UCR SBB - Construction Alert #12- Week 01/30/2023
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Genomics
Underground Electrical
N/A
N/A
Genomics
CMU Stem wall
N/A
N/A
SBB (Lot 8)
Locate and Cap Existing Utilities
N/A
N/A
SBB (Lot 8)
Campus Drive Lane Closure
N/A
Single Lane Traffic
SBB (Lot 8)
Site Utilities
Back hoe, excavator, trucks
Noise due to equipment
SBB (Lot 8)
Electrical Trenching
N/A
Noise due to equipment (College Place)
SBB (Lot 8)
College Place Closure
N/A
College Place Closure
Existing Sheds
Demo Existing Sheds
Excavator
Noise due to equipment
Week of February 06, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Locate and Cap Existing Utilities
N/A
N/A
SBB (Lot 8)
Campus Drive Lane Closure
N/A
Single Lane Traffic
SBB (Lot 8)
Site Utilities
Back hoe, excavator, trucks
Noise due to equipment
SBB (Lot 8)
Electrical Trenching
N/A
Noise due to equipment (College Place)
SBB (Lot 8)
College Place Closure
N/A
College Place Closure
SBB (Lot 8)
Gas Shutdown Feb. 10th
N/A
Shutdown gas to the greenhouses
Existing Sheds
Demo Existing Sheds
Excavator
Noise due to equipment
Week of February 13, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Locate and Cap Existing Utilities
N/A
N/A
SBB (Lot 8)
Domestic Water Shutdown Feb. 15th
N/A
Shutdown water to the greenhouses
SBB (Lot 8)
Campus Drive Lane Closure
N/A
Single Lane Traffic
SBB (Lot 8)
Site Utilities
Back hoe, excavator, trucks
Noise due to equipment
SBB (Lot 8)
Electrical Trenching
N/A
Noise due to equipment (College Place)
SBB (Lot 8)
College Place Closure
N/A
College Place Closure
Genomics
Anchor Bolt Installation
N/A
N/A
Genomics
Concrete Pour
Concrete Pump
Noise due to equipment
Genomics
Back fill
Bobcat or skid-steer
Noise due to equipment
Genomics
Form and reinforce SOG
N/A
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Campus Drive
Single Lane Closure
Until 02/09/23
Buildings along Campus Drive
-
950592 - UCR SBB - Construction Alert #11- Week 01/23/2023
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Genomics
Underground Electrical
N/A
N/A
Genomics
Form and pour foundations
pump
Noise due to equipment
SBB (Lot 8)
Locate and Cap Existing Utilities
N/A
N/A
SBB (Lot 8)
Campus Drive Lane Closure
N/A
Single Lane Traffic
SBB (Lot 8)
Site Utilities
Back hoe, excavator, trucks
Noise due to equipment
SBB (Lot 8)
Electrical Trenching
N/A
Noise due to equipment (College Place)
SBB (Lot 8)
College Place Closure
N/A
College Place Closure
Week of January 30, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Genomics
Underground Electrical
N/A
N/A
Genomics
CMU Stem wall
N/A
N/A
SBB (Lot 8)
Locate and Cap Existing Utilities
N/A
N/A
SBB (Lot 8)
Campus Drive Lane Closure
N/A
Single Lane Traffic
SBB (Lot 8)
Site Utilities
Back hoe, excavator, trucks
Noise due to equipment
SBB (Lot 8)
Electrical Trenching
N/A
Noise due to equipment (College Place)
SBB (Lot 8)
College Place Closure
N/A
College Place Closure
Week of February 6, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Locate and Cap Existing Utilities
N/A
N/A
SBB (Lot 8)
Campus Drive Lane Closure
N/A
Single Lane Traffic
SBB (Lot 8)
Site Utilities
Back hoe, excavator, trucks
Noise due to equipment
SBB (Lot 8)
Electrical Trenching
N/A
Noise due to equipment (College Place)
SBB (Lot 8)
College Place Closure
N/A
College Place Closure
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
-
950592 - UCR SBB - Construction Alert #10- Week 01/16/2023
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Genomics
Footing excavation
Back Hoe, mini-ex, dump truck
Noise due to equipment
Genomics
Rebar Install
N/A
N/A
Genomics
Underground Electrical
N/A
N/A
Week of January 23, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Genomics
Underground Electrical
N/A
N/A
Genomics
Form and pour foundations
pump
Noise due to equipment
SBB (Lot 8)
Locate and Cap Existing Utilities
N/A
N/A
SBB (Lot 8)
Campus Drive Lane Closure
N/A
Single Lane Traffic
SBB (Lot 8)
Site Utilities
Back hoe, excavator, trucks
Noise due to equipment
SBB (Lot 8)
Electrical Trenching
N/A
Noise due to equipment (College Place)
SBB (Lot 8)
College Place Closure
N/A
College Place Closure
Week of January 30, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Locate and Cap Existing Utilities
N/A
N/A
SBB (Lot 8)
Campus Drive Lane Closure
N/A
Single Lane Traffic
SBB (Lot 8)
Site Utilities
Back hoe, excavator, trucks
Noise due to equipment
SBB (Lot 8)
Electrical Trenching
N/A
Noise due to equipment (College Place)
SBB (Lot 8)
College Place Closure
N/A
College Place Closure
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Indefinitely
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
-
950592 - UCR SBB - Construction Alert #9
Week of January 9, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Lot 43
Trailer Interior/Exterior Build-out
Small hand tools
Noise due to hand tools
Bio-Control
Relocate Existing Lines (Water, Telecom, and electrical)
N/A
N/A
Genomics
Excavate and Weather Protect Footings
Back Hoe, mini-ex, dump truck
Noise due to equipment
Week of January 16, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Genomics
Footing excavation
Back Hoe, mini-ex, dump truck
Noise due to equipment
Genomics
Rebar Install
N/A
N/A
Genomics
Form and pour foundations
pump
Noise due to equipment
Genomics
Underground Electrical
N/A
N/A
Week of January 23, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Locate and Cap Existing Utilities
N/A
N/A
SBB (Lot 8)
Campus Drive Lane Closure
N/A
Single Lane Traffic
SBB (Lot 8)
Site Utilities
Back hoe, excavator, trucks
Noise due to equipment
SBB (Lot 8)
Electrical Trenching
N/A
Noise due to equipment (College Place)
SBB (Lot 8)
College Place Closure
N/A
College Place Closure
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Indefinitely
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Project Timeline:
Anticipated Start:
Fall, 2022
Anticipated Completion:
Summer, 2024
PD&C Contact:
Project Manager: John Franklin
tel: (951) 203-7920, (951) 827-2421
Project Planner: Melissa Garrety
tel: (951) 827-7376
Project Working Group:
Danko Turcic
Jean Helwege
Jennifer Osborne
Kathy Drake
Kennett Lai
Patrick Latimer
Rami Zwick
Sabine Freij
Project Basis of Design:
Steinberg Hart
Architect:
Moore Ruble Yudell Architects
GC:
McCarthy Construction
Signup for construction updates on this project